Thirumurugan Ramalingam

Lead Planning Engineer at Shanghai Tunnel Engineering Co., Ltd.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Singapore, Singapore, SG
Languages
  • English Professional working proficiency
  • Tamil Native or bilingual proficiency
  • Hindi Limited working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • China
    • Civil Engineering
    • 300 - 400 Employee
    • Lead Planning Engineer
      • Aug 2022 - Present

      The Deep Tunnel Sewerage System Phase 2 T-11 include the design and construction of a 6km South Main Sewerage Tunnel, a 5.5km South Linkway Sewerage Tunnel, fifteen working shafts and related facilities. Two 3.0m diameter slurry TBMs and three 3.3m diameter slurry TBMs. The contract value is S$472.17 million. The work scopes are below: -Prepare Baseline Programme -Update Programme -Weekly Reports -Monthly Reports -Productivity Analysis -Progress S-curve -Workfront Analysis -Delay Analysis and EOT Claims Show less

    • Hong Kong
    • Construction
    • 700 & Above Employee
    • Planning Lead
      • Apr 2021 - Aug 2022

      NESTE Project : The construction of the Singapore Expansion Project started at the beginning of 2019, and operations started in April 2023. The EUR 1.6 billion investment provides Neste with additional production capabilities. On top of renewable diesel and renewable feedstock for polymer and chemicals, we also add production capability of sustainable aviation fuel. The expanded refinery increases the Singapore refinery's total production capacity to 2.6 million tons per annum, including up to 1 million tons of sustainable aviation fuel. The refinery will have its own hydrogen production unit and additional capabilities to process more challenging wastes and residue raw materials. The successful Singapore Expansion Project makes our Singapore refinery the world’s biggest renewable diesel refinery, as well as the world's largest producer of sustainable aviation fuel, in terms of capacity. we were the subcontractor for the civil works. The Works Scopes are below: -Prepare Baseline Programme -Update L4 Programme -Weekly Reports -Monthly Reports -Productivity Analysis -Progress S-curve -Workfront Analysis -Delay Analysis https://www.neste.sg/neste-in-singapore-and-asia-pacific/who-we-are/production/singapore Show less

    • Senior Planning Engineer at MRT Project
      • May 2017 - Apr 2021

      Project LTA T305 - Thomson East Coast Line. The Thomson-East Coast Line T305 project involves the construction of underground Katong Park Station with two entrances, bored tunnels between Katong Park and Tanjong Rhu Station and between Katong Park and Amber Station and two cross passages. Two 6.35m diameter EPB machines are used to construct the bored tunnels. The contract value is S$293.45 million. The work scopes are below: Work Descriptions: • Maintain and update baseline program, Resource loading • Planning, Scheduling and coordinating with subcontractors by using Primavera Software Program (P6)/Ms Project. • Prepare a baseline schedule, updating the progress and compare with the actual. • Preparation of Daily, Weekly & Monthly reports which includes Manpower, Equipment, Material and major activities. • Update 3 Month Rolling Programme (3MRP) and S-curves. • Update and Prepare 4 Weeks Rolling Programme, Monthly Progress Photo and Monthly Progress Report. • Manage the critical path and delay activities. Show less

    • India
    • Real Estate
    • 700 & Above Employee
    • Planning Engineer
      • Jun 2014 - May 2017

      • Perform project management activities such as requirement analysis, effort estimation, planning, monitoring & control, reporting, team management, etc. • Daily Preparation and maintenance of execution records such as pour cards. • Preparation of Weekly sub-contractors bill for different works executed such as concrete, reinforcement, shuttering & Finishing Works. • Comparing Budget vs Actual Executed Quantum. • Creation of Work-order & Work-bill by using BSF (Build Super Fast) Software. • Preparation Monthly wise Report of Steel & Bulk Material Reconciliation in Excel. • Estimation of Quantity from Drawings for the processing of procurement • Planning and monitoring the project to ensure the timely progress Show less

Education

  • CADD Centre Training Services Private Limited
    Master diploma, Microsoft Project
    2016 - 2016
  • CADD Centre Training Services Private Limited
    Master diploma, Primavera
    2014 - 2014
  • SRM Group - VEC (Anna University)
    Bachelor's degree, Civil Engineering
    2010 - 2014
  • Roever Institute of Management,Perambalur
    Matric/Higher Secondary School
    1997 - 2010

Community

You need to have a working account to view this content. Click here to join now