Thiago Caruso da Paixão

Interface Coordinator - P78 Topside Project at DBR Energies
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Rio de Janeiro, Rio de Janeiro, Brazil, BR
Languages
  • Português Native or bilingual proficiency
  • Inglês Full professional proficiency
  • Espanhol Elementary proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Rhamany Santana Moreira

Eu e o Thiago começamos a estagiar ao mesmo tempo no setor de simulação de reservatórios da Petrobras (Cenpes). O Thiago demonstrou uma imensa capacidade de aprendizado e dedicação no projeto que atuavámos. Além de possuir espírito de liderança e uma grande capacidade de relacionamento interpessoal. Foi um prazer tê-lo como colega de trabalho e tenho certeza que você obterá sucesso em qualquer projeto que iniciar. Rhamany Santana Presidente do Capítulo Estudantil SPE PUC-Rio 2012

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Brazil
    • Engineering Services
    • 200 - 300 Employee
    • Interface Coordinator - P78 Topside Project
      • Feb 2021 - Present

      Main Activities:- Participate in all interface meetings as a Topside viewer in order to guarantee the integrity of the P78 project between HULL (Huyndai – Korea) and Topside (DBR - Brazil), with all stakeholders (Huyndai, Keppel SGP and DBR). - Act in all disciplines of the project in order to ensure that all the informations from the HULL side is being considered on the development of the Topside project. - Responsible for the interface between the Topside engineering project and classification society (ABS). - Lead the 3D design review on the interface area in order to identify the clashes and find solutions between Topside and Hull projects (all disciplines). - Coordinate a team of 6 people composed of one (1) interface engineer, two (2) piping 3D designers, one (1) 3D structure designer and one (1) 3D electrical/instrumentation designer to act in the 3D model focousing on the interface area (Main Deck) finding solutions and supporting the main disciplines to progress in the Topside project. - Assistance to the Yard team regarding project inconsistencies or solutions to Construction & Assembly issues, specially on the interface areas between Topside and Hull. Show less

    • BID proposals for FPSO Sépia and Búzios V.
      • Jan 2019 - Feb 2021

      Process Leader/Marine Systems - HULLMain Activities: - Development of Operational Philosophies of FPSO (Hull side). - Development of engineering P&ID and basic design calculation memories for pumps sizing and proposal pricing. Work on the elaboration of the general arrangements of the main deck, engine room, pump room and accommodations.

    • Process Leader/Marine Systems – Carry over of FPSO P76 (delivered in December/2018)
      • Apr 2017 - Dec 2018

      Main Activities:- Engineering work to finalize the remaining scope of P76 (engineering P&ID`s, reviews of pump calculation memories and overall check for project design inconsistencies).- Assistance to the construction team regarding project inconsistencies or solutions to C & M problems on board. - Technical assistance to the Commissioning team. - Participation in the Pre-operational APR and HAZOP, representing marine systems by the designer, together with the P76 Petrobras operational team. - Responsible for the interface between the engineering project and classification society, Det Norske Veritas (DNV), in order to eliminate pendencies for the P76 release. Show less

    • Brazil
    • Shipbuilding
    • 300 - 400 Employee
    • Process and Safety Engineer Leader - P74,75,76 and P77 - HULL
      • Jan 2014 - Aug 2016

      Main Activities:- Accompaniment and supervision of the detailed project performed by the contracted designer (Projemar SA), in the disciplines of Process and Security. - In January / 2014, joined the JP program (Odebrecht Young Partner), held together with with Odebrecht Oil & Gas and Odebrecht Technology, a 2-years program. - Working in conjunction with Piping & Materials disciplines on the supervision and verification of the project in terms of consistency between 3D Model, Piping & Instrumentation diagrams, piping isometrics and Lines List. Use of tools like SmartPlan Review and NavisWorks to query the 3D version.- Responsible for the interface between the engineering project and classification society, Det Norske Veritas (DNV).- 2 years of assistance to the construction team regarding project inconsistencies or solutions to C & M problems on board. Period that I was allocated in the Inhaúma shipyard, where the P74 and P76 units were docked.- Monitoring and technical assistance to the commissioning team.- Technical support to Enseada's GAC (Contract Administrator Management) team in the development of letters to the client regarding engineering implementations not foreseen in the contract, either at the request of the client or due to lack of definition in the contract. Show less

    • Jr Engineer at Enseada on the Project "FPSO Hull Conversion" - P74, P75, P76 and P77
      • Jan 2013 - Dec 2013

      Jr Engineer doing a job rotation around the principal engineering disciplines and focusing on process engineering.Main Activities:- Accompaniment and supervision of the basic project performed by the contracted designer (Projemar SA), in the disciplines of Process and Safety.- Follow-up and release of the issue to the Client, engineering flow charts (P&ID) and diagrams, calculation memories and lines list. Working in the configuration of some platform operating systems together with the client - Petrobras Netherlands BV. - Supervision and release of the issurance of safety and safeguard systems arrangement, safety plan and hazardous classification areas plan.- Participation in meetings with suppliers to define and purchase the equipment related to the fire fighting system of the platform (CO2 System, Foam and Sea Water). - Accompaniment and participation of the security studies meetings held by contractor Bureau Veritas and jointly with the Petrobras operations team, among them: APR, HAZOP, EERA, Fire Propagation, Smoke Dispersion, others. Show less

    • Intern at Enseada on the Project "FPSO Hull Conversion" - P74, P75, P76 and P77
      • Aug 2012 - Dec 2012

      Intern doing a job rotation in the main areas of the engineering on the project side. Starting at mechanical and process area.

    • Reservoir Engineer Intern at CENPES
      • May 2012 - Jul 2012

Education

  • Pontifical Catholic University of Rio de Janeiro
    Petroleum Engineering
    2008 - 2012