THEODOROS VASILEIOU

Renewable Energy Manager at REVOIL SA
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
GR

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Greece
    • Oil and Gas
    • 1 - 100 Employee
    • Renewable Energy Manager
      • Mar 2010 - Present

      Responsible of managing and develop the Renewable Energy Department  Managing all the projects of the Department such as: Renewable Energies, LPG and Natural Gas   Research and Development on new energy markets such as: Electric Vehicles and Electric Vehicles Chargers  Consulting on new energy projects that company wants to invest producing technical reports and Feasibility Studies.  Studying and Organizing Energy saving projects such as: Utilization of the Lights in companies Facilities  Renewable Energy projects: Photovoltaic Park of 100kw in region of Kabala, Photovoltaic Park of 400kw in region of Argos, Installation of a 35kw photovoltaic system on the rooftop of the offices, Photovoltaic Park of 1 MW in Argos  Managing and Organized the Project “Green Gas Stations”  Managing all the PV parks company have installed

    • Project Manager
      • Feb 2008 - Dec 2009

       Establish, manage, and control project budgets and schedules  Develop conceptual designs with significant input from clients  Produce “Issued for Construction” project drawings and specifications  Develop Project Definitions (scope) and obtain stakeholder approvals  Incorporate value engineering to deliver cost optimized solutions  Review project designs with Site Safety to ensure designs meet internal and external safety standards and codes  Negotiate scope reductions with clients if necessary to meet budget

  • Solarteko
    • Thesaloniki
    • Project Manager
      • Mar 2007 - Jan 2008

       Establish, manage, and control project budgets and schedules  Produce Technical studies and developed designs for various energy projects such as : 2 MW PV project in Limnos island, installation of 37kw roof top PV system  Produced Feasibility studies such as 5 MW wind turbine  Produced Technical studies and developed designs for HVAC systems  Supervising the installations/constructions of PV systems and HVAC systems (team of 2 – 5 persons)  Establish, manage, and control project budgets and schedules  Produce Technical studies and developed designs for various energy projects such as : 2 MW PV project in Limnos island, installation of 37kw roof top PV system  Produced Feasibility studies such as 5 MW wind turbine  Produced Technical studies and developed designs for HVAC systems  Supervising the installations/constructions of PV systems and HVAC systems (team of 2 – 5 persons)

    • Desiel Power Mechanical Engineer
      • Nov 2003 - Jun 2006

       Maintenance and operation four 4,250 hp diesel engine each driving a 3,400 KW generator, two 1,075 hp diesel engines each driving 750KW generators.  Maintenance of the old pipeline network  Develop designs for a new pipeline network  Attending 8 hrs shifts operating and controlling according to schedule 15.1 MW Diesel Electric Power Generation facilities. Promotions: Shift supervisor (1year, 4 persons), Maintenance Power Plant Manager (6 months, 14 persons  Maintenance and operation four 4,250 hp diesel engine each driving a 3,400 KW generator, two 1,075 hp diesel engines each driving 750KW generators.  Maintenance of the old pipeline network  Develop designs for a new pipeline network  Attending 8 hrs shifts operating and controlling according to schedule 15.1 MW Diesel Electric Power Generation facilities. Promotions: Shift supervisor (1year, 4 persons), Maintenance Power Plant Manager (6 months, 14 persons

Education

  • Dimokrition Panepistimion Thrakis
    Meng, Engineering Managment
    2003 - 2006
  • The University of Salford
    Meng, Energy for Sustainable Development
    2000 - 2001
  • The University of Manchester
    Beng, Mechanical Engineering
    1997 - 1999

Community