Tharaka Weragama
Rail Engineering Surveyor at McDonald Surveys- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
0
/5.0 / Based on 0 ratingsFilter reviews by:
Experience
-
McDonald Surveys
-
Australia
-
Civil Engineering
-
1 - 100 Employee
-
Rail Engineering Surveyor
-
Aug 2021 - Present
-
-
-
Martinus
-
Slovakia
-
Retail
-
1 - 100 Employee
-
Surveyor
-
Aug 2020 - Aug 2021
Forestfield Airport Link Forestfield Airport Link
-
-
-
Australian Contruction Surveyors PTY LTD
-
Australia
-
Business Consulting and Services
-
Surveyor
-
Jun 2020 - Aug 2020
Forest Field Airport Link -Perth-Western Australia * Scanning the Tunnel for Dilapidation Report( Trimble SX10, S 09 With T10 Tablet) * Stake out the positions of Sleepers, Railway track and it's finish level. Forest Field Airport Link -Perth-Western Australia * Scanning the Tunnel for Dilapidation Report( Trimble SX10, S 09 With T10 Tablet) * Stake out the positions of Sleepers, Railway track and it's finish level.
-
-
-
McGregor Surveys
-
Construction
-
1 - 100 Employee
-
Assistant Surveyor
-
Mar 2020 - Jun 2020
Mine lease stakeout at Leonora,WA Monitoring Water well at different CALTEX Locaions in WA (Narrogin, Mosman Park ,Rivervale, Moora) Mine lease stakeout at Leonora,WA Monitoring Water well at different CALTEX Locaions in WA (Narrogin, Mosman Park ,Rivervale, Moora)
-
-
-
-
Surveyor
-
Oct 2018 - Feb 2020
Surveying works carring out for the requirement of hidrologic studies for Ruwanpura Expressway-Ratnapura Sri Lanka. Surveying works carring out for the requirement of hidrologic studies for Ruwanpura Expressway-Ratnapura Sri Lanka.
-
-
-
International construction consortium
-
Sri Lanka
-
Construction
-
200 - 300 Employee
-
Surveyor
-
Mar 2016 - Sep 2018
*Improvement and Rehabilitation of (B240) Kotte-Bope Road Section from Godagama to Bope,Sri Lanka *Orchid Apartment 2 at Malabe,Sri Lanaka, 12 Floors. (May 2016-Basement to Dec 2016-End of Structure) *Havelock City Development Project Phase 03 and 04 visiting Surveyor.(31 Floors, 101 m height.). *Central Expressway Project, Sri Lanka (CEP), Section 2, From Mirigama to Kurunagala. (DEC 2016 to March 2107) *Rehabilitation and Extension of Ambepussa-Kurunagala-Trincomalee Road (A006). Here I gain lot of experience in both road and building surveying such as initial control point establishment, cross section survy,topograpical survey, asphalt leveling in road and Setting out of Precise location in both building and road projects.
-
-
-
-
Surveyor
-
Jul 2015 - Mar 2016
*Eight month working experience as a surveyor in road construction project named as ADB funded I Road Project At Galle and Hambanthota District packages.Since July 2015 to feb 2016. Company-Sunnil Kusumsiri Associates. (Responsible for-Establishing control points and bench marks,conducting fly -back leveling between established bench marks,tow-zero traversing,traverse adjustment,Topographical survey,Setting out works,Cross sectional survey) *Eight month working experience as a surveyor in road construction project named as ADB funded I Road Project At Galle and Hambanthota District packages.Since July 2015 to feb 2016. Company-Sunnil Kusumsiri Associates. (Responsible for-Establishing control points and bench marks,conducting fly -back leveling between established bench marks,tow-zero traversing,traverse adjustment,Topographical survey,Setting out works,Cross sectional survey)
-
-
-
-
Surveyor
-
Mar 2015 - Jul 2015
Building setting out works Building setting out works
-
-
-
-
Surveyor
-
Apr 2014 - Apr 2015
*One Year part time working experience as a Surveyor under the supervision of Dr.T.D.C Pushpakumara, Lecturer University of Moratuwa. Projects: Building setting out, road survey, topographic survey, bridges setting out, leveling, traverse adjustment, cross section survey, land survey *Four month (23rd May to 10th July 2015) industrial training under supervision of Dr. T.D.C Pushpakumara, who is the director of the Colombo Institute of Engineering Survey. Project: Reconstruction and Relocation of Buildings for Sri Lanka Atomic Energy Board due to New Bridge Construction Project Over Kelani River. Contractor: K.D.EBERT AND SONS HOLDINGS (PVT) Ltd. *Worked as a Surveyor assistant for 6 months with Mr. R.B.S Srilal, Site Engineer at AMSK Constructions, Government administrative building complex, Hambantota.(2009) *Worked at Academy of Adventure, Bellihuloya -2 year experience as Assistance Instructor (2011 -2013)
-
-
Education
-
Sabaragamuwa University of Sri Lanka
Bsc Surveing science, Surveying -
Embilipitiya President College