Thanaphon Sukumpanumet
Cofounder and CTO at 360TRUCK- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
360TRUCK
-
Thailand
-
Transportation, Logistics, Supply Chain and Storage
-
1 - 100 Employee
-
Cofounder and CTO
-
Mar 2019 - 4 years 10 months
Bangkok “360TRUCK” an online logistic marketplace for Thai trucking firms who have, for decades, suffered from the empty return trip problem. It aims to efficiently connect shipper to carriers through our proprietary algorithm and A.I. Achievements: - One of 8 finalist at MIT$100K Entrepreneurship Competition 2018, Boston, USA - 1st Runner-up of Business Plan Competition and 1st prize of Startup Showcase at MIT Global Startup Workshop 2018, Thailand - 1st Prize award from Thailand… Show more “360TRUCK” an online logistic marketplace for Thai trucking firms who have, for decades, suffered from the empty return trip problem. It aims to efficiently connect shipper to carriers through our proprietary algorithm and A.I. Achievements: - One of 8 finalist at MIT$100K Entrepreneurship Competition 2018, Boston, USA - 1st Runner-up of Business Plan Competition and 1st prize of Startup Showcase at MIT Global Startup Workshop 2018, Thailand - 1st Prize award from Thailand LogTech Award 2017 by Panus and NSTDA - The best MIM business plan of the year, ranked by Eric Tachibana, Professional Services Area Practice Manager APAC, China, & Japan at Amazon Web Services Show less
-
-
-
Chevron
-
United States
-
Oil and Gas
-
700 & Above Employee
-
Production Optimization Engineer (Benchamas Oil Field)
-
Jul 2016 - Dec 2018
• Project manager of booster compressor upgrade, leading a team of 7 cross-functional people to successfully execute the 7-month upgrade project with NPV of $112,600 • Developed an automated tracking dashboard with new protocol for compressors startup which increased productivity of 12 offshore crews and improved compressor reliability from 94% to 97% • Team Coordinator of Annual Production Optimization Workshop with 32 participants from office and offshore, as an outcome, 21… Show more • Project manager of booster compressor upgrade, leading a team of 7 cross-functional people to successfully execute the 7-month upgrade project with NPV of $112,600 • Developed an automated tracking dashboard with new protocol for compressors startup which increased productivity of 12 offshore crews and improved compressor reliability from 94% to 97% • Team Coordinator of Annual Production Optimization Workshop with 32 participants from office and offshore, as an outcome, 21 opportunities were identified and $800,000 was budgeted for execution
-
-
Reservoir Engineer (Platong Oil Field)
-
Jan 2015 - Jun 2016
Platong Oil Field • Project manager of sophisticated waterflood operation in 3 locations, leading a team of 4 people to make operational decision based on In-depth Data Analysis and Sensitivity Analysis, which resulted in oil reserves gained equivalent to $24.6 million during the 1.5-year operation • Developed Business Plan Forecast for all waterflood operations in Platong oil field • Initiated the alternative way to analyze injection profile, resulted in cost saving of $10,000 per job • Conducted… Show more • Project manager of sophisticated waterflood operation in 3 locations, leading a team of 4 people to make operational decision based on In-depth Data Analysis and Sensitivity Analysis, which resulted in oil reserves gained equivalent to $24.6 million during the 1.5-year operation • Developed Business Plan Forecast for all waterflood operations in Platong oil field • Initiated the alternative way to analyze injection profile, resulted in cost saving of $10,000 per job • Conducted Financial Analysis and Project Valuation to compare two alternatives of the drilling projects in Platong oil field, the suggested alternative yielded incremental NPV of $17.0 million
-
-
Petroleum Engineer (Platong Gas II Field)
-
Jun 2013 - Dec 2014
• Selected to be 1 of 15 speakers in Chevron Asia-South Reservoir Management Forum 2014, in the topic of “Performance Reserves Analysis to Identify Root Cause of Major Reserves Reduction” • Won cash award in recognition of excellently leading a team of 7 cross-functional people to complete the 10-month drilling project with outstanding project management to mitigate several high uncertainties of this project. Project value is more than $100 million with profitability index of 3.50. • Led… Show more • Selected to be 1 of 15 speakers in Chevron Asia-South Reservoir Management Forum 2014, in the topic of “Performance Reserves Analysis to Identify Root Cause of Major Reserves Reduction” • Won cash award in recognition of excellently leading a team of 7 cross-functional people to complete the 10-month drilling project with outstanding project management to mitigate several high uncertainties of this project. Project value is more than $100 million with profitability index of 3.50. • Led and conducted Risk Assessment to successfully secure leaked production wells in one of Platong production platforms, which prevented potential loss of containment in the future • Developed an Automated Analytic Tool by Excel VBA, to effectively capture water shut-off opportunities which prevented production loss equivalent to $11 million in the first year
-
-
Petroleum Engineer (Erawan Gas Field)
-
May 2011 - May 2013
• Selected to be one of poster presentations in Chevron Asia-South Reservoir Management Forum 2013, in the topic of “Booster Compressor Step-by-Step Optimization Recommendation for Erawan Field” • Developed Water Disposal Master Plan for Erawan field to increase operation reliability and initiated an "Integrated water disposal monitoring dashboard" which includes Hall plots for individual injector surveillance, identification of depleted reservoirs with water disposal potential, and injector… Show more • Selected to be one of poster presentations in Chevron Asia-South Reservoir Management Forum 2013, in the topic of “Booster Compressor Step-by-Step Optimization Recommendation for Erawan Field” • Developed Water Disposal Master Plan for Erawan field to increase operation reliability and initiated an "Integrated water disposal monitoring dashboard" which includes Hall plots for individual injector surveillance, identification of depleted reservoirs with water disposal potential, and injector conversion plans for the field.
-
-
-
PTTEP
-
Thailand
-
Oil and Gas
-
700 & Above Employee
-
Student Senior Project
-
Oct 2010 - Mar 2011
Bongkot Field Senior Project: Evaluating Enhanced Gas Recovery by CO2 flooding in Bongkot field, Thailand (by using compositional model, Eclipse E300)
-
-
-
PTTEP
-
Thailand
-
Oil and Gas
-
700 & Above Employee
-
Petroleum Engineer Student Intern
-
Mar 2010 - May 2010
GRE Project: “Assisted History Matching on Basement Reservoir Simulation Model in Vietnam field” (by using MEPO as an assisted history matching software and ECLIPSE as a reservoir simulator)
-
-
-
Chevron
-
United States
-
Oil and Gas
-
700 & Above Employee
-
Petroleum Engineer Student Intern
-
Mar 2009 - May 2009
Erawan Field Project: “Terminal Gas Rate Study for Erawan field, Thailand”
-
-
Education
-
มหาวิทยาลัยธรรมศาสตร์
Master of Science (M.S.), Master of Science in Marketing -
จุฬาลงกรณ์มหาวิทยาลัย
1st Class Honors, Bachelor of Engineering (B.Eng.), Petroleum Engineering -
Triamudom Suksa School
High School, Mathematics and Science