Tham Jen Seng

Sales Manager at Hydratech Industries
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Setapak, Federal Territory of Kuala Lumpur, Malaysia, MY

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Singapore
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Sales Manager
      • Jun 2023 - Present

      - Head of Malaysia Branch - PIC for Trading Sales, System Sales, rental sales, pressure equipment calibration sales. - PIC for troubleshooting products (aftersales services) - Quotation, PO, SO, DO, Generation - Liaise with suppliers, sub con for installation, T&C works - High Pressure Application SME (Liquid Pump, Gas Booster) - Hydrogen Filling station - O&G equipment - Head of Malaysia Branch - PIC for Trading Sales, System Sales, rental sales, pressure equipment calibration sales. - PIC for troubleshooting products (aftersales services) - Quotation, PO, SO, DO, Generation - Liaise with suppliers, sub con for installation, T&C works - High Pressure Application SME (Liquid Pump, Gas Booster) - Hydrogen Filling station - O&G equipment

    • Malaysia
    • Construction
    • Factory Manager
      • Dec 2022 - May 2023

      - manufacturing of industrial cooling coil - PIC for facilities, production, QAQC dept. - manpower of 40 personal - daily operations management (OT, delivery deadlines, overall discipline) - CAPEX, OPEX - expansion and improvement projects on production capacity - introducing new technology & equipment to improve production rate - manufacturing of industrial cooling coil - PIC for facilities, production, QAQC dept. - manpower of 40 personal - daily operations management (OT, delivery deadlines, overall discipline) - CAPEX, OPEX - expansion and improvement projects on production capacity - introducing new technology & equipment to improve production rate

    • Germany
    • Machinery Manufacturing
    • 200 - 300 Employee
    • Application/Service Asst. Manager
      • Oct 2019 - Nov 2022

      Job Description: • Compressed air system, air treatment system, compressed air buffer and control systems initial sizing, design, costing and site visit, to work with project team to meet customer requirements before final design is decided. (include documentations, calculations, drawing submissions for customer perusal) • Perform customer site compressed air system health, investigate required pressure, flow, etc. • Compressed air system control system for new & old projects(installation, T&C, optimization) • T&C for all new compressed air system projects(O&G and factory) • Perform new update to firmware for all equipment(control unit) • Attend Application conference once every 2 years • Service job planning, support, PO(from customer), troubleshooting, breakdown support Show less

    • Singapore
    • Appliances, Electrical, and Electronics Manufacturing
    • 1 - 100 Employee
    • Senior Manufacturing Engineer
      • Jan 2015 - Oct 2019

      Job Description: • Process control for Wafer Fab Dept. local & abroad. (Yield report generation & presentation, review and improvement) • Explore new process/equipment, production equipment, tools, jigs and fixtures include calibration, trouble shooting, setting, design & testing and implementation. • Creation, maintaining new and existing work instruction(WI), standard operating procedure(SOP), Technical Drawing, Production documents(Records, machine calibration record, consumables consumption, etc.) • Liaise with Sales/Customer for new products, design, trial and error until final revision agreed by customer (Product design & development (Gstarcad8, proficient level = intermediate)). • Engage new supplier (machine maker, supplier, raw material). • Member of Environment, Management, Safety & Health committee (EHS), 5S leader, 5S Head Auditor, Trainer, Lean Competent Person. • Costing – provide base cost for new product to sales team. • Planning and Manning – determine work order and worker’s OT when necessary. New Factory Project • Initial draft of factory layout (design, process flow and layout) • Drawing Creation using autoCad • Costing • Contractor(design finalization) Show less

    • Malaysia
    • Machinery Manufacturing
    • 1 - 100 Employee
    • Production Engineer
      • May 2012 - Dec 2014

      Work Description: • Process Control for mechanical assembly Sub Section (Winch, Machinery Deck/Pedestal Adaptor) • Plan, Implement, monitor production schedule to meet Contract Delivery Date (CDD), weekly meeting update • 5’s, ISO 9001:2008, 3C In Charge Person • Responsible for Punch list (Product Defect) correction whole Mechanical Assembly Section • Procurement of assembly material, tools (torque wrench, hydraulic wrench, nuts and bolts, feeler gauge etc.) • Process Documentation creation and upkeep, Technical drawing Control • Problem Solving for Assembly Technical Issues during assembly, creation of Engineering Change Request(ECN) • New SOP creation, implementation, improvement (audit of SOP process) • Cross Check Customer Spec, Requirement compliance with actual assembled Parts (Gearbox, Gears) • Man Hour and workforce allocation planning, monitoring Show less

    • India
    • Manufacturing
    • 1 - 100 Employee
    • Assistant Production Enginner
      • Dec 2008 - May 2012

      Work Description: • Maintenance and Daily Checklist of Yarn Producing Machine • Continual Monitoring of Process Parameter and yarn quality during production. • 5’s and ISO9001:2008 Internal Auditor • Tool’s maintenance and Improvement Plan. • Scheduling of production to meet delivery date • In Charge of 3 shift consisting of 80 Operator, 16 Leader, 6 Line Leader and 2 Supervisor. • CI Activities and 5S Program. • Working 3 Shift When Required Work Description: • Maintenance and Daily Checklist of Yarn Producing Machine • Continual Monitoring of Process Parameter and yarn quality during production. • 5’s and ISO9001:2008 Internal Auditor • Tool’s maintenance and Improvement Plan. • Scheduling of production to meet delivery date • In Charge of 3 shift consisting of 80 Operator, 16 Leader, 6 Line Leader and 2 Supervisor. • CI Activities and 5S Program. • Working 3 Shift When Required

Education

  • Multimedia University
    Bachelor's degree, Mechanical Engineering
    2002 - 2009

Community

You need to have a working account to view this content. Click here to join now