Thành Duy Nguyễn

MEP Design Engineer at Tập Đoàn Tân Á Đại Thành
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
VN

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Construction
    • 1 - 100 Employee
    • MEP Design Engineer
      • Jun 2022 - Present

    • Vietnam
    • Real Estate
    • 1 - 100 Employee
    • Mechanical, Electrical, and Plumbing Engineer
      • Sep 2021 - May 2022

      Dragon Hill International Tourist Area Project - Geleximco Group. Category: 5 * Wyndham Dragon Hotel 13 floors, 1 basement. - In charge of MEP design management for Mechanical part - fire protection and HVAC, Water Supply and Sewerage, Air-conditioning, Chiller, Hotel Swimming Pool, Heatpumb, Boiler. Coordinate the Design Department to work with Design Consultants. Report work to the Head of MEP and Head of PMU. - Manage construction documents, supervise directly and take main responsibility for the progress, quality and acceptance of the volume of fire prevention and control items at the hotel. - Directly manage and supervise and take main responsibility for the progress, quality and acceptance of the bidding packages: Hotel water supply and drainage, hard water treatment, wastewater treatment / laundry, Heatpumb, Boiller , Chiller. - In charge of the package of four-season indoor swimming pool, outdoor swimming pool, landscape infrastructure. - In charge of design package of hotel kitchen, SkyBar, GAS station. - In charge of M&E package for hotel infrastructure. - Work with TVTK and TVGS on related details. - Perform other jobs as assigned by the company's leaders. Show less

    • Vietnam
    • Wholesale Building Materials
    • 1 - 100 Employee
    • Head of Electrical Engineering
      • Feb 2020 - Aug 2021

      Project: High-rise residential area in plot 5.B3, Dong Hoi resettlement area Eurowindow River Park. Including 04 high-rise buildings. CT1,2,3 building 33 floors, River Park building 39 floors. There are 3 basements connecting to 4 buildings. - Manage the MEP design of the general M&E project of the project. Coordinate with Design Department to work with Design Consulting unit on related issues. Report the work to the Head and Deputy Director in charge of MEP. - M&E Supervisor - Head of M&E at Park1, Park2 (CT2, CT3). - Mainly responsible for MEP M&E construction items at Park1,2 (CT2,3) and report to PMU Director and GD-BQLCDA-M & E. - Directly supervise and be responsible for the main fire prevention & damage items at Park1,2 (CT2,3). - In charge of the application file with the Police Department of Firefighting and Firefighting, including 4 courts: CT1,2,3,4. - In charge of the Acceptance Document section with the State Quality Inspection Department for M&E, including 4 buildings CT1,2,3,4. - In charge of general reports, weekly reports, monthly reports, and output reports on the M&E section of the Project as assigned by the PMU Director. - Work with the TVGS team and urge the members of the Supervisory Consultant team to work in accordance with the contract. Show less

    • Vietnam
    • Real Estate
    • 100 - 200 Employee
    • MEP Project Manager
      • May 2019 - Jan 2020

      Projects: Small and medium projects under Bamboo Airway member company.=> Head of MEP - Small and medium projects of Bamboo Airway member companies:1) Bamboo Airway ticket office - 30 Trang Tien, Hoan Kiem District, Hanoi2) Office of the crew and flight attendants - Building N03T1, Diplomatic Corps Area, Tay Ho District, Hanoi.3) Bamboo Lounge Business Class - Level 2, Terminal T1, Noi Bai International Airport, Soc Son District, Hanoi- In general and responsible for the M&E construction items of the above small and medium projects.- Design consultancy, coordinate with Noi Bai Station Management Board to review the design to ensure the electricity system, water supply and drainage, fire protection, synchronous ventilation with the station system.- Manage ME contractors and support the supervision of interior finishing.- Check quality, volume, consulting and settlement documents of construction contractors. Show less

    • MEP Project Engineer
      • Jan 2018 - Apr 2019

      • Project: FLC Dai Mo Urban Area (FLC Garden City)- Item: 4 high-rise buildings and adjacent infrastructure.- In charge of MEP for the general management plan for the project. Coordinate with the General Management Office to work with relevant units on the design of the project. Report the work to the Deputy Director of the MEP Board.- Site supervises and manages subcontractors for M&E construction. Directly manage and supervise the construction of Electricity, Water Supply-Quit for H3-A building.- Support fire prevention and fighting, management construction, building mixing center H3-A and H3-B- In charge of Fire Prevention and Control Documentation, including 3 buildings H2, H3-A and H3-B. Coordinate with the Initial and related departments to declare the test records with the Police Department of Firefighting and Fire and CNCH.- In charge of the inspection dossier with the State Directorate of Quantitative Mechatronic Section of 3 buildings: H2, H3-A, H3-B.- Responsible for synthesizing reports of the M&E department and responsible for reporting to the Director of the MEP Board and the Director of the PMU. Show less

    • Mechanical, Electrical, and Plumbing Engineer
      • May 2016 - Jan 2018

      • Project: FLC Quy Nhon Luxury Resort Complex - Category: 5* FLC Luxury Hotel- Managing the design of the Hotel MEP category. Coordinate with the Department of Information Management to work with TVTK unit. Work report to the MEP Manager.- Site supervision, management of M&E contractors, fire protection contractors. Direct monitoring of Electricity, Water Supply and Drainage of the Hotel and Pool, PoolBar.- Check contractor's design drawings and construction drawings to ensure that the construction quality meets the set standards and quality.- Examination of construction contractors' quality and volume profiles. Coordinate with QS department to check volume of payment records.- In charge of fire prevention and fighting records. Coordinate with the Investment Board and related departments to deploy the acceptance documents with the Police Department of Fire Prevention and Fighting. Perform other jobs as assigned by the company's leaders. Show less

Education

  • Ha Noi University of Industry
    Engineer's degree, Mechatronics, Robotics, and Automation Engineering
    2007 - 2011
  • Hanoi university of Industry
    Bachelor's degree, Mechanical Engineering
    2007 - 2011

Community

You need to have a working account to view this content. Click here to join now