Terrence Halpin
Rigger at StS Resources & Technology- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
StS Resources & Technology
-
United Kingdom
-
Oil and Gas
-
1 - 100 Employee
-
Rigger
-
Mar 2021 - Present
Currently working on the largest construction project in Europe. The Johan Castberg FPSO floating refinery at kvearner Stord in Norway a site I am familiar with and worked on and off for many years now. Instillation of modules, all rigging and lifting duties adhered. Currently working on the largest construction project in Europe. The Johan Castberg FPSO floating refinery at kvearner Stord in Norway a site I am familiar with and worked on and off for many years now. Instillation of modules, all rigging and lifting duties adhered.
-
-
-
Petrofac
-
United Kingdom
-
Engineering Services
-
700 & Above Employee
-
Rigger
-
Nov 2019 - Present
-
-
Rigger
-
2019 - Nov 2019
-
-
-
StS gruppen AS
-
Norway
-
Oil and Gas
-
100 - 200 Employee
-
Rigger
-
Dec 2019 - Jun 2023
Decommissioning works Decommissioning works
-
-
-
EEW Offshore Structures (Britain) Ltd.
-
United Kingdom
-
Renewable Energy Semiconductor Manufacturing
-
1 - 100 Employee
-
Rigger
-
Sep 2018 - Dec 2019
-
-
-
Worley
-
Australia
-
Professional Services
-
700 & Above Employee
-
Rigger deck crew
-
May 2019 - Nov 2019
Currently working on the Clair ridge summer project. Currently working on the Clair ridge summer project.
-
-
-
StS Engineering AS
-
Norway
-
Oil and Gas
-
Rigger
-
Mar 2019 - Nov 2019
Successfully upgrading and restoration of the Njord oil platform. Dry docked at kvearner Stord in Norway for Aker solutions. Successfully upgrading and restoration of the Njord oil platform. Dry docked at kvearner Stord in Norway for Aker solutions.
-
-
-
CEMEX
-
Mexico
-
Wholesale Building Materials
-
700 & Above Employee
-
Rigger
-
Jan 2019 - Nov 2019
Working on a shutdown for Graytons LTD at Cemex, my role was to replace all the tiles inside the mill (confined space) and replace them with new ones, each tile weighing 40kg/100kg, using a overhead manual hoist and other various lifting apparatus the job was done effectively and on time. Working on a shutdown for Graytons LTD at Cemex, my role was to replace all the tiles inside the mill (confined space) and replace them with new ones, each tile weighing 40kg/100kg, using a overhead manual hoist and other various lifting apparatus the job was done effectively and on time.
-
-
-
Bentall Rowlands
-
United Kingdom
-
Food and Beverage Manufacturing
-
1 - 100 Employee
-
Rigger/ slinger
-
Sep 2018 - Nov 2019
MGT Biomass in Teesside, the largest Biomass Power plant in Europe. My role is to help erect 16 Silos with a team of around 30 men, My duties included slinging and fitting steel rafters/roof panels by using numerous rigging and lifting techniques. MGT Biomass in Teesside, the largest Biomass Power plant in Europe. My role is to help erect 16 Silos with a team of around 30 men, My duties included slinging and fitting steel rafters/roof panels by using numerous rigging and lifting techniques.
-
-
-
DeepOcean
-
Norway
-
Oil and Gas
-
700 & Above Employee
-
Deck crew / cable lay
-
Oct 2018 - Nov 2018
In October, I stayed on board the Maersk Connector on the East Anglia 1 Export Installation Project. My duties included all rigging and lifting on deck as well as cable plough launch and recovery. In October, I stayed on board the Maersk Connector on the East Anglia 1 Export Installation Project. My duties included all rigging and lifting on deck as well as cable plough launch and recovery.
-
-
-
Global Marine
-
United Kingdom
-
Telecommunications
-
200 - 300 Employee
-
Tower Team rigger
-
Aug 2018 - Aug 2018
In August I stayed on board the Global Symphony Vessel whilst working on the Kincardine project. This was the first floating wind farm in the North Sea. My duties included being part of a tower team pull-in of the export cable. In August I stayed on board the Global Symphony Vessel whilst working on the Kincardine project. This was the first floating wind farm in the North Sea. My duties included being part of a tower team pull-in of the export cable.
-
-
-
British Steel
-
United Kingdom
-
Mining
-
700 & Above Employee
-
Rigger
-
Jul 2018 - Aug 2018
Working for Grayton’s Mechanical and Fabrication at British Steel I had the job of replacing the railways for the coke transporters and the steel plating on the slag runner, using numerous lifting techniques and lifting equipment Working for Grayton’s Mechanical and Fabrication at British Steel I had the job of replacing the railways for the coke transporters and the steel plating on the slag runner, using numerous lifting techniques and lifting equipment
-
-
-
REMO Renewable Energy Maintenance Offshore
-
Westemeerwind
-
Rigger / maintenance technician
-
Apr 2018 - Apr 2018
Westermeerwind offshore wind farm, employed by Remo, subcontracted to Siemens my role was to help lift and lower loads safely in the tower, and help with general maintenance Westermeerwind offshore wind farm, employed by Remo, subcontracted to Siemens my role was to help lift and lower loads safely in the tower, and help with general maintenance
-
-
-
Sarens
-
Belgium
-
Construction
-
700 & Above Employee
-
Rigger / banksman
-
Jun 2017 - Jan 2018
-
-
-
Starrs Contact services
-
Southampton, United Kingdom
-
Rigger
-
Mar 2014 - Jun 2014
Rigging and steel erection, sub contracted to Sarens building Port to shore cranes. Rigging and steel erection, sub contracted to Sarens building Port to shore cranes.
-
-
-
Sarens
-
Belgium
-
Construction
-
700 & Above Employee
-
Rigger/Steel erection
-
Aug 2012 - Feb 2014
Rigging and Erecting STS Port cranes around Europe. Reference details are available if needed. Rigging and Erecting STS Port cranes around Europe. Reference details are available if needed.
-
-
Education
-
Ormesby Comprehensive
-
TTE- Apprentice
NVQ L2, Mechanical Engineering