Tarun Aadia

Assistant General Manager at Abryl Laboratories
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Solan, Himachal Pradesh, India, IN

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

ramesh mainkar

He knows his job that is piping , equipment erection and HVAC . Understands other faculties requirment.helps in finalizing job requirments. kowns billing procedures. good in communications that is mails and verbal. Understands plant requirments. Guiding work schedules for contractors

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • India
    • Pharmaceutical Manufacturing
    • 100 - 200 Employee
    • Assistant General Manager
      • Aug 2023 - Present

    • Senior Manager
      • Aug 2022 - Aug 2023

    • Manager
      • Apr 2022 - Aug 2022

    • India
    • Pharmaceutical Manufacturing
    • 700 & Above Employee
    • Dy. Manager
      • Feb 2017 - May 2022

    • India
    • Dairy Product Manufacturing
    • 400 - 500 Employee
    • Dy. Manager- NDDB
      • Jan 2014 - Jan 2017

      I am leading the team for design engineering and establishment of utility services (black, general and clean) for the SAARC nation laboratory (BSL-3+) for Foot and Mouth Disease at Bhubaneswar. This is India's first Bio safety containment facility constructed by Self Compacting Concrete (SCC). - Lead Project Engineer for BSL-3 Laboratory at Tamil Nadu Veterinary and Animal Sciences University (TANUVAS) Chennai. Responsibilities: 1) Finalization of civil architectural drawings and co-ordinate with civil department for floating the order. 2) HVAC design verification based on the EU Guidelines for Bio safety. 3) Preparation of tender technical specifications, estimation of HVAC works, General, clean and black utilities, autoclaves and floating the tenders. 4) Co-ordination with site team, consultants and internal team at HO. Show less

    • United Kingdom
    • Civil Engineering
    • 700 & Above Employee
    • project engineer constructing plant for ASB
      • Jun 2012 - Dec 2014

      Constructed Plant for ASB international Pvt. Ltd, A Japanese company manufacturing Pet Bottles Molding Machines. Total construction Value of project is 1000 Million Rupees. Constructed Plant for ASB international Pvt. Ltd, A Japanese company manufacturing Pet Bottles Molding Machines. Total construction Value of project is 1000 Million Rupees.

  • Tata Consulting Engineers
    • Himachal Pradesh, India
    • project engineer
      • Jul 2011 - Jun 2012

      As Lead Mechanical Engineer - Chocolate Plant for Maha Munch Production. Leading in the areas as under: 1) Process Piping for chocolate and associated raw materials for production 2) Complete fabrication and Installation of structural steel works for chocolate plant, noodle plant and utility block - Total Structural steel - 3500 MT 3) Bill certification and reconciliation of structural works, piping works, roof sheeting and wall paneling works (Total vendors associated for the works - 9 Nos) Show less

    • Pharmaceutical Manufacturing
    • 100 - 200 Employee
    • Assist. Manager in projects
      • Jun 2009 - Jul 2011

      Lead team member for preventive maintenance. Responsible for preparation of heat load calculation for new product as per the production batch sheet. Dealing with Operation and Maintenance of brine compressors, N2 plant AAR m/c VAM m/c, and Air compressors and cooling tower water quality with the team size of 40 people. Implemented ERP and Master data controller in ERP oracle based 12.0.5 version. Installed -70 Deg. C and -40 deg. C to save the liquid nitrogen Lead team member for preventive maintenance. Responsible for preparation of heat load calculation for new product as per the production batch sheet. Dealing with Operation and Maintenance of brine compressors, N2 plant AAR m/c VAM m/c, and Air compressors and cooling tower water quality with the team size of 40 people. Implemented ERP and Master data controller in ERP oracle based 12.0.5 version. Installed -70 Deg. C and -40 deg. C to save the liquid nitrogen

Education

  • Punjab Technical University
    Bachelor of Technology (B.Tech.), Mechanical Engineering
    2002 - 2006
  • Punjab School Education Board
    10th
    1999 - 2000

Community

You need to have a working account to view this content. Click here to join now