Tarek Salem
Electrical Engineer at CEG International- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
CEG International
-
Qatar
-
Architecture and Planning
-
300 - 400 Employee
-
Electrical Engineer
-
Dec 2016 - Present
Currently project "Electrical E-Charging Bus Stations and Depots 1. The project comprises of Bus Stations, Bus Depots and Park and Ride Facilities. 2. Bus Stations include bus terminals, passenger terminal building, staff area, substation building and car park area. 3. Bus Depots include bus parking, bus servicing and maintenance facilities, administrative building, mosque, accommodation facilities for the drivers and support staff, and support buildings. 4. Park and Ride Facility includes shaded canopies for passenger's car parking and ancillary building. Show less
-
-
-
EGEC
-
Construction
-
400 - 500 Employee
-
Projects manager
-
Jul 2014 - Sep 2016
Responsible for all supervision projects , provide oversight and leadership in executing projects from planning to completion. working with clients to design and put solutions related to quality improvement in place , develop project plans in line with engineering objectives, and assign project tasks and resources. ,also monitor the progress of each project stage and facilitate necessary interventions. Responsible for all supervision projects , provide oversight and leadership in executing projects from planning to completion. working with clients to design and put solutions related to quality improvement in place , develop project plans in line with engineering objectives, and assign project tasks and resources. ,also monitor the progress of each project stage and facilitate necessary interventions.
-
-
-
XERVON INDUSTRIAL SERVICES L.L.C.
-
Appliances, Electrical, and Electronics Manufacturing
-
100 - 200 Employee
-
Elctrical Eng.
-
May 2011 - Nov 2014
Analyzing project quality and risks • Developing strategic staff plans • Creating baseline management plans • Developing schedule and cost baselines • Developing scope statement • Progress assessments within the baseline time fragments • Financial management in respective to baseline cost plan • Quality control Analyzing project quality and risks • Developing strategic staff plans • Creating baseline management plans • Developing schedule and cost baselines • Developing scope statement • Progress assessments within the baseline time fragments • Financial management in respective to baseline cost plan • Quality control
-
-
-
thyssenkrupp
-
Germany
-
Industrial Machinery Manufacturing
-
700 & Above Employee
-
Deputy Head Of electrical activities
-
Feb 2009 - Nov 2010
Moving 12 Military factories buildings from Helwan City to Abouzbale desert with electrical facilities in respective to requirements - Full activities for Infrastructure. - Installation, testing and commissioning Substations 11000/400 KVA. - Installation, testing and commissioning Medium Voltage Cables. - Installation, testing and commissioning Low Voltage Cables. - Installation, testing and commissioning Ring Main Units. - Installation, testing and commissioning Transformers 2000 KVA. - Installation, testing and commissioning Light Current Network. - Installation, testing and commissioning Fire Alarm System. - HVACs Control System. - Review Shop Drawing and As Built for all Electrical Systems. Show less
-
-
-
Hassan Allam Holding
-
Egypt
-
Construction
-
700 & Above Employee
-
Electrical Site Engineer
-
Jan 2007 - Jan 2009
• Installation/Commission/Operation of Electric Power and HVAC Instrumentations for 12 KV 2 RMU Equipment from the Electrical Distribution Feeders to Distribution Transformers • Distribution Transformer of Dry Type DYN11, 10.5/0.38 KV, 16000 KVA • Low Voltage Switchboards from Main Distribution Boards: MOB1, 2; MCCB's; and EMDB1, 2. • Light-Wiring of Internal and External; 6,000 outlets. • Lighting Fixtures/Switches (7,300 different types installed) • Lighting Control Panels (equipped with push buttons and indication lamps to navigate) • Socket Outlets (Ranging from S01, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13) • Load Break Switches (IS1, IS, IS3) • Low Volt Cables (600/1000V, mull core copper conductor, PVC cables ranging from 4x10+10 up to 3x300 + 150) +150ECCmm2) • UPS System (400 KVA x 4 sets with sealed lead acid batteries and all required accessories) • Grounding System (complete earthling systems including main network of power and cleanliness Show less
-
-
-
Zawiya
-
Pakistan
-
Entertainment Providers
-
1 - 100 Employee
-
Electrical Operation Engineer
-
Apr 2004 - May 2007
Dismantling and installing refractory brick factories, including thermal kilns, whose temperature reaches 1100 degrees Celsius, as well as drying rooms, which are designed to remove moisture from thermal bricks before entering the kilns. according to the approved drawings Dismantling and installing refractory brick factories, including thermal kilns, whose temperature reaches 1100 degrees Celsius, as well as drying rooms, which are designed to remove moisture from thermal bricks before entering the kilns. according to the approved drawings
-
-
-
HCH Supply Official
-
Egypt
-
Oil and Gas
-
1 - 100 Employee
-
Technical & Operation Electrical Eng.
-
Feb 1996 - May 2004
Submitting offers to supply UPS devices, install them in the required places, supervise maintenance work, and work under the umbrella of approved companies as a power of attorney for the company such as APC EXIDE - Control Technic Submitting offers to supply UPS devices, install them in the required places, supervise maintenance work, and work under the umbrella of approved companies as a power of attorney for the company such as APC EXIDE - Control Technic
-
-
Education
-
Monefia Univercity
Bacherl's, Industerial Electronics -
high school
very good, High School/Secondary Diplomas and Certificates