Tapas Sarkar
US IT Bench Sales Marketer at DataSync Inc.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Full professional proficiency
-
Hindi Full professional proficiency
-
Bengali Full professional proficiency
-
Japanese -
Topline Score
Bio
Experience
-
DataSync Inc.
-
United States
-
Information Technology & Services
-
1 - 100 Employee
-
US IT Bench Sales Marketer
-
Aug 2022 - Present
-
-
-
Negocios IT Solutions (P) LTD
-
India
-
IT Services and IT Consulting
-
100 - 200 Employee
-
Resources Analyst
-
Apr 2022 - Aug 2022
-
-
-
Infinics
-
IT Services and IT Consulting
-
1 - 100 Employee
-
Senior IT Recruiter
-
Nov 2021 - Mar 2022
-
-
-
-
Associate Recruiter
-
Mar 2020 - Oct 2021
-
-
Recruiter
-
Mar 2020 - Sep 2020
-
-
-
TOKYO ROKI CO. LTD.
-
Japan
-
Site Engineer
-
Jan 2018 - Feb 2020
Productions of oil filter for automobile in robotics system. Perform and coordinate inspections and determine quality assurance testing models of raw materials and finished products. Checking quality of spot welding. Maintenance and changing of die as per material requirement Productions of oil filter for automobile in robotics system. Perform and coordinate inspections and determine quality assurance testing models of raw materials and finished products. Checking quality of spot welding. Maintenance and changing of die as per material requirement
-
-
-
M.Mondal
-
Kolkata, West Bengal, India
-
Site Engineer
-
Apr 2014 - Aug 2015
Installation and insulation with aluminum cladding of valve package, copper pipe, chilled water pipe, hot water pipe & ducting as per approved drawing. Installation & Preventive maintenance of cooling tower. Responsibilities for monitoring & rectification of process area differential pressure, temperature & relative humidity. Installation, Validation & maintenance of AHU with re-circulation, once-through system, Ventilation unit with 6000 CFM to 20000 CFM capacity. Responsibilities for Preventive & breakdown maintenance of DM water plant, vacuum pump, chilled water pump, hot water pump. Taking material takes off and preparing the list of materials required as per drawing and site condition and ordering the materials for the project execution. Managing the man power. Show less
-
-
-
ALEC
-
United Arab Emirates
-
Construction
-
700 & Above Employee
-
MEP Coordinator
-
2011 - 2014
• Responsible for execution of site activities for installation of AHU, FCU, Ducting, Insulation, Chilled water pipe & coordination with different departments. • Coordinate with different project disciplines like Electrical, Civil, BMS, SAS and etc. etc. • Conduct frequent construction site visits to monitor method of execution and progress of project works. • Making weekly and daily progress report of site. • Rectification of site issues with sub-contractors. • Studying the specifications, Shop drawings & Coordination drawings. • Preparation and process of SCR, IR & method statement. • MIR of AHU • Taking material takes off and preparing the list of materials required as per drawing and site condition. • Ordering the materials for the project execution. • Managing the man power. • Complete Installation and erection of Mechanical system. Show less
-
-
Education
-
Maulana Abul Kalam Azad University of Technology, West Bengal formerly WBUT
Bachelor's degree, Mechanical Engineering -
West Bengal State Council of Technical Education
Mechanical Engineering, Diploma in Mechanical Engineering -
Kalyani Central Model School