tanveerabbas tarrar

Area Engineer at Descon Engineering Limited
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Lahore District, Punjab, Pakistan, PK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Area Engineer

      working experience in Oil & Gas and Petrochemical industries. Have worked at various shutdowns plant maintenance • PRE-COMMISSIONING,COMMISSIONING & STARTUP system completion handover to client . working experience in Oil & Gas and Petrochemical industries. Have worked at various shutdowns plant maintenance • PRE-COMMISSIONING,COMMISSIONING & STARTUP system completion handover to client .

  • Descon Engineering
    • Plateau Maintenance Project – (PMP) – Qatar Gas RASLFFAN,QATAR
    • AREA ENGINEER
      • Sep 2012 - May 2013

      September 2012 – may2013 Descon Engineering Qatari Technip and chiyoda joint venture Plateau Maintenance Project – (PMP) – Qatar Gas AREA ENGINEER (Piping) My responsibility Incharge of three Areas 1. Sour Water 2. Compressor 3.Main Pipe Rack 1,2,3 & 4 overall piping activities. 2. I have responsibility to system compltion handover to client . 3. Coordination with pre-commissioning team and site piping team and test pack oiffce team 4. Coordination meeting with client / company relevant department persons regarding approval of field technical query for modification purpose. 5. Prepare & submit as-built piping isometric drawings to project control department. 6. Attend daily toolbox talk meeting and advise workforce according to safety rules. 7. Show less

    • Pakistan
    • Construction
    • 700 & Above Employee
    • MECHANICAL ENGINEER
      • Jul 2007 - Apr 2013

      • Feb 2012 - Jun 2012

      My responsibility Plant 1, Feed Gas Compressor & High Pressure (780) Gas System, Plant 2, Acid Gas (H2S &CO2) Removal Unit Plant 8,Common Facility (Air/Nitrogen/Water/Steam)Plant 26, Booster Compressors All Equipment Column Heat Exchanger Vessel Drum Condenser Overhauling and Piping replacement

      • Jun 2011 - Feb 2012

      In charge Fabrication Work Shop2" To 84" Pipe Size . All Type MaterialPipe & Supports FabricationResponsibilities for workshop fabrication & welding works including site erection / installation activities regarding piping spools, piping supports and steel structural works as per relevant approved drawings, project specifications, codes & standards specifications and according to site modification position.• Coordination meeting with client / company relevant department persons (on daily and weekly basis) regarding daily progress, quality and safety issues department such as planning, engineering, QA/QC, material control, safety, movement / transport, sandblasting & painting, electrical, instrument, civil, tools & consumables store, time office and administration. Show less

      • Aug 2010 - Jun 2011

      My responsibility IN charge night all the plant , Plant 1, Feed Gas Compressor & High Pressure (780) Gas System, Plant 2, Acid Gas (H2S &CO2) Removal Unit, plant 3,gas/liquid drying (dehydration)mercury removal .plant 4,separation &fractionation unit. Plant,5 liquefaction unit. Plant 6-1, propane refrigeration system .6-2 ,mcr refrigeration system plant 7,sulphur recovery unit Plan8,CommonFacility(Air/Nitrogen/Water/Steam)plant 9,regeneration gas & propane/butane sweetening unit. plant 19,relief &blow down system plant 21,incoming gas line & oily water disposal .Plant 26, Booster Compressors All Equipment’s and Piping replacement priority work continue 􀂃 Commissioning and startupWarranty preyed one month after startup Show less

      • Feb 2010 - Jun 2011

      SAJ GAS PLANT SAJGAS PRE-COMMISSIONING AND STARTUP SITE ENGINEER PRE-COMMISSIONING And handover and system commissioning & STARTUPArea = amin utility SRU Flare slug checherPig racver area I have responsibility check the task pack who making by process engineer for line air blowing, steam blowing, water flashing, chemical cleaning, lub oil flashing and after approved from Clint task pack .Perform the line and equipment cleaning and get the cleaning certificate singed by QA,QC and Clint and company or third party Give the all document for final dossier with document controller Show less

      • Aug 2009 - Dec 2009

      In my most of duties included Ease & grease of Static Equipments, Hot bolting & Spading of Base scope.Tagging as per Spading List. Complete Preparation for Shutdown Jobs.  Piping section replacements of Process plants & Equipments on repair & recommendations of inspection department and Piping Integrity Management. De-spading after completion of Shutdown. Scope of work and procedures, sequence of activities to be performed with operation and safety of plants. Flare area on shore off shore piping replacements Commissioning and startup Warranty preyed one month after startup Show less

      • Apr 2009 - Aug 2009

      Pre-commissioning co2 granulation utility In shutdown time urea piping modification jacket pipe line installation piping replsment .Check Isometrics Against P&ID'shave been met and recordedCheck If Flow Direction of check valve is reverse to that flushing, Valve is Removed.Check that the correct bolts and gaskets are installed at all Mechanical JointsCheck that All Vents and Drains are Installed (Add temporary Ventsand Drains for Testing as requiredCheck Piping for Correct Schedule and TypeCheck valve Materials as per Piping Material Spec.Check the rating of forged Steel FittingsCheck that branch reinforcement is CorrectCheck that all Pressure Connections are Installed Correctly as per Spec.Check for Correct Flow direction of arrow through Filters andStrainers, Traps, Check valves, Globe Valves, Control ValvesCheck that all Non Return valve Flappers are RemovedCheck all In line Instruments are RemovedCheck All Instruments Impulse Line are DisconnectedCheck orifice valve Tap OrientationCheck that orifice Flanges have Required upstream and Down Stream ClearanceCheck that the bases of all orifices Flanges have been GroundCheck that all Pipe Supports are Completely Installed as per Drgs andSchedules- Additional Supports may be Required Refer to Standard Drg.Check that any Temporary Pipe Supports required have been InstalledCheck that Gags on Springs Supports are in PositionCheck that all Chain Wheels Required for Specified Valve have been InstalledCheck that all Pipe Seals have been InstalledCheck that all Orifice Taps have been Seal Welded and unused tapped holeshave been plugged and seal weldedCheck test Medium for conformity to requirements Show less

      • Feb 2009 - Apr 2009

      Fab 2009 to apr 2009 Descon Engineering Abu Dhbai UMMLNAR REFINERERY Major Overhaul. AREA ENGINEER All area valve macincal valve psv control valve refurbish Refurbish & new valve install.

      • Aug 2008 - Apr 2009

      my most of duties included Ease & grease of Static Equipments, Hot bolting & Spading of Base scope.Tagging as per Spading List. Complete Preparation for Shutdown Jobs.  Piping section replacements of Process plants & Equipments on repair & recommendations of inspection department and Piping Integrity Management. De-spading after completion of Shutdown. Scope of work and procedures, sequence of activities to be performed with operation and safety of plants. Commissioning and startup Warranty preyed one month after startup Show less

      • Feb 2008 - Jun 2008

      Fab 2008 to jun 2008 Descon Engineering Abu Dhbai ADGAS ADGAS Train 1&2 STAIRCASE & GREETING RAPLES Project SITE ENGINEER Boilers = 1 2 3 4Lng jetty Sulphur jetty HP LP TANK STAIRCASE GREETING REPLASE IN LIFE AREA

      • Jul 2007 - Jan 2008

      In my most of duties included Ease & grease of Static Equipments, Hot bolting & Spading of Base scope.Tagging as per Spading List. Complete Preparation for Shutdown Jobs.  Piping section replacements of Process plants & Equipments on repair & recommendations of inspection department and Piping Integrity Management. De-spading after completion of Shutdown. Scope of work and procedures, sequence of activities to be performed with operation and safety of plants. Commissioning and startup Warranty preyed one month after startup Show less

      • Mar 2007 - May 2007

      Complete Piping modification of Ammonia Plant pertained to upgrading. New Benefield & Modification Benefield Area, Ammonia compressor, Air Booster Unit & Fabrication Shop.Site installation and commissioning of Above Mention Areas. Being the lead person my job included extensive coordination with the client. My area of responsibility included:  Installation of new Pipelines. Fabrication and Erection of compressor related piping also including Cement lined Piping. Tie-in of existing compressors with the plant.  Equipment Modification Hydro Testing & Pre-commissioning Show less

      • Feb 2007 - Mar 2007

      Lead a group of mechanical technicians and ensure timely, quality and safe installation, maintenance, repair and testing of mechanical stationary and rotating equipment in the plant. Discuss the maintenance schedule and the daily plan with production team and plan to ensure optimum utilization of resources such as time, material and manpower. Ensure observance of HSE regulations and guidelines by team under supervision and promotion of safe work practices.

    • United States
    • Oil and Gas
    • 700 & Above Employee
    • supervisor piping
      • Aug 2005 - Jan 2007

  • J.Ray McDermott Caspian contractors
    • ACG FULL FIELD DEVELOPMENT PHASE I, II, III AND BP SHAH DENIZ PROJECTS OFF SHORE
    • PIPING Supervisor
      • Aug 2005 - Jan 2007

      August, 2005 to January 2007 J.Ray McDermott Caspian contractors inc Baku Azerbaijan BP BRITISH PETROLEUM AIOC ACG FULL FIELD DEVELOPMENT PHASE I, II, III AND BP SHAH DENIZ PROJECTS OFF SHORE PLATFORM EAST AZERI IN BAKU AZERBAIJAN . PIPING SUPERVISOR  Plat form east azrei piping erection  Plat form central azrei piping erection August, 2005 to January 2007 J.Ray McDermott Caspian contractors inc Baku Azerbaijan BP BRITISH PETROLEUM AIOC ACG FULL FIELD DEVELOPMENT PHASE I, II, III AND BP SHAH DENIZ PROJECTS OFF SHORE PLATFORM EAST AZERI IN BAKU AZERBAIJAN . PIPING SUPERVISOR  Plat form east azrei piping erection  Plat form central azrei piping erection

  • J.Ray McDermott
    • DOLLPHIN ENEGY DOLLPHIN ENEGY GAS OFF SHORE P LATE FAROM DOL# 2 jabel ali du
    • PIPING Supervisor
      • Jul 2005 - Aug 2005

      20july 2005 to 23aug 2005 J.Ray McDermott jabel ali dubhi UAE DOLLPHIN ENEGY DOLLPHIN ENEGY GAS OFF SHORE PLATE FAROM DOL# 2 PIPING SUPERVISOR  Plat form dol # 2 piping erection 20july 2005 to 23aug 2005 J.Ray McDermott jabel ali dubhi UAE DOLLPHIN ENEGY DOLLPHIN ENEGY GAS OFF SHORE PLATE FAROM DOL# 2 PIPING SUPERVISOR  Plat form dol # 2 piping erection

  • Descon Engineering
    • QATAR GAS LNG DE-BATTLENECKING PROJECT QATAR
    • Supervisor
      • Feb 2005 - Apr 2005

      21FAB 2005 TO 24APR 2005 DESCON LTD CHIYODA CORPORATION JV TECHNIP QATAR GAS LNG DE-BATTLENECKING PROJECT QATAR Supervisor  Piping erection  shutdown time spading de-spading .  Tie-in piping 21FAB 2005 TO 24APR 2005 DESCON LTD CHIYODA CORPORATION JV TECHNIP QATAR GAS LNG DE-BATTLENECKING PROJECT QATAR Supervisor  Piping erection  shutdown time spading de-spading .  Tie-in piping

      • May 2002 - Oct 2004

      28 MAY 2002 TO 24 OCT 2004 CONSOLIDATED CONTRACTORS COMPANY CHIYODA CORPORATION JV SNAMPROGETI RASLAFFAN ONSHORE EXPANSION PROJECT QATAR LNG PIPING FORMAN  Piping fabrication and erecation. Steam tresing  Gre piping fabrication and erecation Pre-commission. Train 3 # 4

      • Sep 2001 - May 2002

      30SEP 2001 TO 27 MAY 2002 CONSOLIDATED CONTRACTORS COMPANY KELLOG BRON AND ROOT JV TECHNIP Q-CHEM QATAR PETRO CHEMICAL COMPLEX PROJECT QATAR PIPING CHARGE HAND  Piping fabrication and erection .

  • Descon Engineering
    • GASCO RUWAIS FACILITIES UP GRADING ABU-DHBAI UAE
    • LEAD MAN
      • Dec 2000 - Jul 2001

      23DEC 2000 TO 05JULY 2001 DESCON LTD TECHNIP GASCO RUWAIS FACILITIES UP GRADING ABU-DHBAI UAE LEAD MAN  for Piping Fabrication and erection.  Tanks erection  Sutdone colum internal job 23DEC 2000 TO 05JULY 2001 DESCON LTD TECHNIP GASCO RUWAIS FACILITIES UP GRADING ABU-DHBAI UAE LEAD MAN  for Piping Fabrication and erection.  Tanks erection  Sutdone colum internal job

  • SIEMENES ENGINEERING LTD
    • 10000 BPD PARCO MID COUNTRY OIL REFINERY PROJECT PAKISTAN
    • LEAD MAN
      • Sep 1999 - Jun 2000

      22SEP1999 TO 12JUN 2000 SIEMENES ENGINEERING LTD JGC JAPAN GAS COMPANY JV MAROBINI 10000 BPD PARCO MID COUNTRY OIL REFINERY PROJECT PAKISTAN LEAD MAN  Piping Fabrication and erection. 22SEP1999 TO 12JUN 2000 SIEMENES ENGINEERING LTD JGC JAPAN GAS COMPANY JV MAROBINI 10000 BPD PARCO MID COUNTRY OIL REFINERY PROJECT PAKISTAN LEAD MAN  Piping Fabrication and erection.

  • HABIB RAFIQ PVT LTD
    • NOV ALIESINA ITALY DEWAN SALMAN FIBER LTD UNIT 3 PAKISTAN
    • Supervisor
      • Mar 1999 - Aug 1999

      05MAR 1999 TO 23AUG 1999 HABIB RAFIQ PVT LTD NOV ALIESINA ITALY DEWAN SALMAN FIBER LTD UNIT 3 PAKISTAN Supervisor Piping Fabrication and erection. 05MAR 1999 TO 23AUG 1999 HABIB RAFIQ PVT LTD NOV ALIESINA ITALY DEWAN SALMAN FIBER LTD UNIT 3 PAKISTAN Supervisor Piping Fabrication and erection.

  • Petocon pvt ltd
    • Attock oil refinery oil pump station movdivcaion PAKISTAN
    • Supervisor
      • Jul 1998 - Aug 1999

      20july 1998 to 01aug 1999 Petocon pvt ltd Attock oil refinery pakistan Attock oil refinery oil pump station movdivcaion Supervisor  Supervision for Piping Fabrication and erection.  oil pump station 20july 1998 to 01aug 1999 Petocon pvt ltd Attock oil refinery pakistan Attock oil refinery oil pump station movdivcaion Supervisor  Supervision for Piping Fabrication and erection.  oil pump station

  • DESCON LTD
    • Fauji Jordan complex project pakistan
    • LEAD MAN
      • Dec 1997 - Jun 1998

      01dec 1997 to07jun 1998 DESCON LTD Fauji Jordan complex project pakistan Fauji Jordan complex project pakistan LEAD MAN for Piping Fabrication and erection. 01dec 1997 to07jun 1998 DESCON LTD Fauji Jordan complex project pakistan Fauji Jordan complex project pakistan LEAD MAN for Piping Fabrication and erection.

  • Zaman energy diesel engine plant project
    • Zaman energy diesel engine plant project pakistan
    • Supervision
      • Mar 1997 - Nov 1997

      22MAR1997 to 28NOV 1997 Zaman energy diesel engine plant project pakistan Zaman energy diesel engine plant project pakistan Zaman energy diesel engine plant project pakistan Supervisor  Supervision for Piping Fabrication and erection.  Pre-commission /commissioning and startup. 22MAR1997 to 28NOV 1997 Zaman energy diesel engine plant project pakistan Zaman energy diesel engine plant project pakistan Zaman energy diesel engine plant project pakistan Supervisor  Supervision for Piping Fabrication and erection.  Pre-commission /commissioning and startup.

  • International fabrication company
    • Pak American fertilizer complex pakistan
    • Pipe fabricator
      • Dec 1996 - Mar 1997

      10dec1996 to 22 mar 1997 International fabrication company Pak American fertilizer complex pakistan Pak American fertilizer complex pakistan Pipe fabricatorCC  for Piping Fabrication and erection. 10dec1996 to 22 mar 1997 International fabrication company Pak American fertilizer complex pakistan Pak American fertilizer complex pakistan Pipe fabricatorCC  for Piping Fabrication and erection.

      • May 1996 - Dec 1996

      20 may 1996 to 04dec1996 DESCON LTD ici polyester fiber company ici polyester fiber project pakistan Pipe fitter  for Piping Fabrication and erection.

      • Jun 1995 - May 1996

      19 jun 1995 to08 may 1996 DESCON LTD Ihi 4x323 mw hubco power project ltd pakistan Pipe fitter for Piping erection. And rotary equipment installation

Education

  • lahore
    diploma of associate engineer, Mechanical Engineering
    1994 - 1996
  • shiekhupura
    matric, Science
    1992 - 1992

Community

You need to have a working account to view this content. Click here to join now