Tanguy GBAKRE

Mining Project Engineer at SODEMI
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
CI
Languages
  • French Native or bilingual proficiency
  • English Professional working proficiency
  • German Limited working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Côte d'Ivoire
    • Government Administration
    • 1 - 100 Employee
    • Mining Project Engineer
      • Dec 2012 - Present

      - Final estimation of resources of the economic geological model; - Geostatistic modeling; - Optimization and design of open pit mines; - Short-term and long-term planning; - Different reconciliation in the mining industry: needs, systems and benefits; - Economic evaluation of mining projects; - Analysis and financial simulation; - Feasibility studies and financing a mining project. - Final estimation of resources of the economic geological model; - Geostatistic modeling; - Optimization and design of open pit mines; - Short-term and long-term planning; - Different reconciliation in the mining industry: needs, systems and benefits; - Economic evaluation of mining projects; - Analysis and financial simulation; - Feasibility studies and financing a mining project.

    • France
    • Oil and Gas
    • 700 & Above Employee
    • Business and Management Controller
      • Sep 2012 - Dec 2012

      - Participate in the dashboard comments by reviewing the fixed costs to net income in order to justify the significant differences; - Analyze by analytic fixed costs per period for better monitoring of the operating budget; - Prepare the working capital table to determine the needs of society and comment it; - Participate in budget preparation; - Update price structures (Lubs-Decades-Jet-Bitumen) to allow customers billing; - Establish statistical sales report for better monitoring of monthly budget.

    • Applied Hydraulic Lecturer
      • Oct 2010 - Sep 2012

      - Realize courses in accordance with the program of year ; - Perform tutorials and coaching students. - Realize courses in accordance with the program of year ; - Perform tutorials and coaching students.

    • Côte d'Ivoire
    • Oil and Gas
    • 300 - 400 Employee
    • Trainee, Petroleum Geostatistician Engineer
      • Apr 2010 - Sep 2010

      Project: Petroleum geostatistical study of block CI-40. - Exploratory and variographic analysis of seismic data; - Time to depth conversion by External Drift Kringing (EDK) ; - Volumetrics calculations of rocks and oil in reservoir zone ; - Implementation of the statistical analysis for PETROCI. Project: Petroleum geostatistical study of block CI-40. - Exploratory and variographic analysis of seismic data; - Time to depth conversion by External Drift Kringing (EDK) ; - Volumetrics calculations of rocks and oil in reservoir zone ; - Implementation of the statistical analysis for PETROCI.

    • France
    • Environmental Services
    • 700 & Above Employee
    • Trainee, Mining Geostatistician Engineer
      • Apr 2008 - Jul 2008

      Project: Mining geostatistical study of supergene goldmine. - Exploratory data analysis and variograms modeling; - Resources estimation and simulation of gold content ; Project: Mining geostatistical study of supergene goldmine. - Exploratory data analysis and variograms modeling; - Resources estimation and simulation of gold content ;

    • Côte d'Ivoire
    • Oil and Gas
    • 300 - 400 Employee
    • Graduate Engineering Trainee, Geochimist Engineer
      • Sep 2006 - Jan 2007

      Project: Geochimical study of block CI-27 (Foxtrot) and geostatistical modeling of basic Rock Eval parameters (S2, Tmax, IH). - Rock Eval pyrolysis and identification of source rock potential; - Characterization of source rock potential and estimation of hydrocarbon expulsion potential inside block CI-27 ; - Identification of interest zones for new drilling. Project: Geochimical study of block CI-27 (Foxtrot) and geostatistical modeling of basic Rock Eval parameters (S2, Tmax, IH). - Rock Eval pyrolysis and identification of source rock potential; - Characterization of source rock potential and estimation of hydrocarbon expulsion potential inside block CI-27 ; - Identification of interest zones for new drilling.

    • Trainee, Process Engineer
      • Sep 2005 - Dec 2005

      Project: Optimisation of the operation for hydrogen purification system (Unit 91) of hydrocracking complex. - Study of unit operation and redimensioning equipments ; - Increasing productivity from 0.86 t/h to 1.2t/h. Project: Optimisation of the operation for hydrogen purification system (Unit 91) of hydrocracking complex. - Study of unit operation and redimensioning equipments ; - Increasing productivity from 0.86 t/h to 1.2t/h.

Education

  • ESCP Europe
    Specialized Masters, Management Control and Business Performance
    2008 - 2009
  • MINES ParisTech
    Post Master Degree, Geostatistics
    2007 - 2008
  • National Polytechnique Institute « Félix Houphouët Boigny »
    Master's Degree, Petroleum Engineering
    2001 - 2007
  • Classic High senior Secondary School of Abidjan
    High School, Maths & Physics
    2000 - 2001

Community

You need to have a working account to view this content. Click here to join now