Talha Dinçel

Finishing Works Group Chief at ANTTEQ Construction/ООО "АНТТЕК"
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Russia, RU
Languages
  • Türkçe Native or bilingual proficiency
  • Rusca Professional working proficiency
  • Almanca Professional working proficiency
  • Ingilizce Full professional proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Osho30
    Caddell Construction
    Jul, 2011
    - Oct, 2024

Experience

    • Russian Federation
    • Construction
    • 100 - 200 Employee
    • Finishing Works Group Chief
      • Nov 2016 - Present

    • Türkiye
    • Construction
    • 700 & Above Employee
    • Tower Facade Design Manager
      • Feb 2016 - Oct 2016

      - Coordinated Facade Structure with the subcontractor (Gartner) with our design team according to Regulations , Norms in Russia (Snips and Gosts).- Solved interface details with relevant disciplines.- Coordinated BMU (Building Maintenance Unit) and its relevant disciplines.- Coordinated crane tie connections through the facade.- Prepared specifications and tender documents of the facade.- Prepared technical tasks.- Coordinated MAF (Material Application Forms) according to the BOQ to provide the materials be approved by the client. - Coordinated RFI s (Request for information) and Letters about conflicts during co-ordinations with other disciplines. - Coordinated COR s (Change Orders) for Repeat Design Works and additional requirements. - Controlled procurement of architectural materials according to the BOQ , Technical Specifications and Requirements. - Prepared transmittal lists for sub contractors and site engineers to provide distribution of “for construction” projects. Show less

    • Design Office Group Chief
      • Oct 2014 - Feb 2016

      RENAISSANCE CONSTRUCTION St Petersburg- Russian FederationElektrosila – Fort Tower (A Class Business Center)Design Office Chief- Coordinated Architectural , Structural , MEP Projects according to requirements of the Client and Regulations , Norms in Russia (Snips and Gosts).- Prepared MAF (Material Application Forms) according to the BOQ to provide the materials be approved by the client.- Prepared RFI s (Request for information) and Letters about conflicts during co-ordinations with other disciplines.- Prepared COR s (Change Orders) for Repeat Design Works and additional requirements.- Controlled procurement of architectural materials according to the BOQ , Technical Specifications and Requirements.- Coordinated and controlled detailed design drawings (especially details for different wall, floor covering materials and ceiling) in coordination with the site work.- Controlled shop drawings from different subcontractors.- Prepared mock-up projects for facade and offices.- Prepared specifications and tender documents (facade, interior materials, lifts , doors ,especially coverings, lighting, painting etc.)- Supplied images for material boards for shopping, office and retailed areas in coordination with the tenant supervisors.- Supplied detailed design drawings of interior spaces, especially for residence elevator halls; office, fitness , conference halls and VIP office entrances by providing application of these details on site work appropriately.- Prepared transmittal lists for sub contractors and site engineers to provide distribution of “for construction” projects. Show less

    • Design Office Group Chief
      • Jul 2013 - Oct 2014

      RENAISSANCE CONSTRUCTION St Petersburg- Russian FederationSmolyochkovo – Business Park (A Class Business Center)Design Office Chief- Coordinated Architectural , Structural , MEP Projects according to requirements of the Client and Regulations , Norms in Russia (Snips and Gosts).- Prepared MAF (Material Application Forms) according to the BOQ to provide the materials be approved by the client.- Prepared RFI s (Request for information) and Letters about conflicts during co-ordinations with other disciplines.- Prepared COR s (Change Orders) for Repeat Design Works and additional requirements.- Controlled procurement of architectural materials according to the BOQ , Technical Specifications and Requirements.- Coordinated and controlled detailed design drawings (especially details for different wall, floor covering materials and ceiling) in coordination with the site work.- Controlled shop drawings from different subcontractors.- Prepared mock-up projects for facade and offices.- Prepared specifications and tender documents (facade, interior materials, lifts , doors ,especially coverings, lighting, painting etc.)- Supplied images for material boards for shopping, office and retailed areas in coordination with the tenant supervisors.- Supplied detailed design drawings of interior spaces, especially for residence elevator halls; office, fitness , conference halls and VIP office entrances by providing application of these details on site work appropriately.- Coordinated and controlled as-built drawings for the project- Prepared transmittal lists for sub contractors and site engineers to provide distribution of “for construction” projects. Show less

    • Construction
    • 700 & Above Employee
    • Finishing Works Architect
      • Jul 2012 - May 2013

      IC IÇTAŞ - ASTALDI St Petersburg- Russian Federation Pulkovo Airport Terminal Finishing Works Lead Architect - Responsible of Structural and Architectural Works on Construction Site - Coordinated and controlled the application of Sub Contractors. - Provided aplications according to the projects , working schedule , MOS Method of Statements and Technical Specifications. - Reported daily , weekly and monthly progress to the technical office manager. Show less

Education

  • Yıldız Teknik Üniversitesi / Yildiz Technical University
    Mimarlik Fakultesi
    1998 - 2004
  • Cağaloğlu anadolu lisesi

Community

You need to have a working account to view this content. Click here to join now