Syed Noman

Biomedical Equipment Technician at Shifa International Hospitals Ltd. Faisalabad
  • Claim this Profile
Contact Information
Location
Lahore District, Punjab, Pakistan, PK

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • Pakistan
    • Hospitals and Health Care
    • 1 - 100 Employee
    • Biomedical Equipment Technician
      • Jan 2021 - Present

    • Vietnam
    • Retail Apparel and Fashion
    • Electrical Foreman
      • Aug 2011 - Aug 2018

      I work huta higerfield located Jeddah Saudi Arabia at various locations such as makka, madina and jeddah KAIA airport.Job Responsibilities:•Responsible for Installing, maintaining, repairing electrical wiring, equipment.• Using test equipment & hand tools to diagnose, locate & fix electrical problems in generator, machine, circuit and pumps.• Create control circuit with using magnet-contractor such as star-delta control circuit , automatic control and time control circuit.• Checking & testing circuit breakers and replacing them where required.• Accountable for all electrical and general tasks relating to maintenance.

    • Technician
      • Apr 2009 - Jun 2011

      • Install ETON home textile system.http://www.etonsystems.com/applications/home-textile/• Electrical Mechanical maintenance of A.C & D.C Motors assembling and overhauling.• synchronisation of ELC (Entry Level Certificate) switchboard with digital input output switch Maintenance.• Maintain the ETON home fabric system.• Over look air pressure and solenoid valve. • Install ETON home textile system.http://www.etonsystems.com/applications/home-textile/• Electrical Mechanical maintenance of A.C & D.C Motors assembling and overhauling.• synchronisation of ELC (Entry Level Certificate) switchboard with digital input output switch Maintenance.• Maintain the ETON home fabric system.• Over look air pressure and solenoid valve.

    • Internee
      • Aug 2007 - Aug 2007

      Internship about introduction of:• Gas Turbine Power Station.• Steam Power Station.• Central Gas Turbine Maintenance Workshop.• Synchronization of alternating current Turbine.• Cooling control section.• Direct current (Dc) backup unit Internship about introduction of:• Gas Turbine Power Station.• Steam Power Station.• Central Gas Turbine Maintenance Workshop.• Synchronization of alternating current Turbine.• Cooling control section.• Direct current (Dc) backup unit

Education

  • Government Technical Teachers Training College, Peoples Colony No-1, Faisalabad, Pakistan.
    Diploma associate engeering (DAE), Electrical technology
    2005 - 2008
  • wapda boys high school Steem Power Station Faislabad Pakistan
    Metric, physics, chemistry, biology, mathematics
    1994 - 2004

Community

You need to have a working account to view this content. Click here to join now