Syed Muazzam Sherazi

Site Engineer at Al-Tariq Constructors
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
PK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Pakistan
    • Construction
    • 1 - 100 Employee
    • Site Engineer
      • Jun 2022 - Present

      Visited the site before mobilization & submitted the Office & Workshop Arrangement Plan for Client approval.Responsible for supervision of store keeper & making Required & Available material list as per job requirement prior to mobilization from TS-4- to TS-3.Assisted the Site IN charge during mobilization & made arrangements of electricity water etc. on site.Reviewed the Scope of Work & discussed with the client on points of concern.Analyzed the Project Blueprints, assisted the Draftsman for revised drawings as per site & Pump Data Sheet requirements & sent them to client for Approval.Reviewed the Pump Data Sheet & Assisted the Site In charge in meeting with Client for Revised BOQ as per PUMP Data Sheet & Reference Drawings.Reviewed all the Procedures & Method Statements & Incorporated Client's comments.Responsible for making Material Demand to Warehouse in accordance with BOQ.Calculated the Paint & Wrapping Tape requirement for AG/UG Piping.Responsible for contacting different Inspection & Calibration Companies for their quotations.Made Quotation Comparison list for Instruments Inspection & Calibration & sent it to Head Office for Approval.Contacted with different Civil sub contractors for their Quotations & sent it to Head office for Approval & award of contract.Responsible for coordinating with HSE Supervisor to develop HSE Documents (e.g. JSAs for different jobs, HSE Control Plan, HSE Requirements etc.) as per job specifications.Working knowledge of Mechanical Engineering documents/drawings such as P&IDs, Isometric, Data Sheets, General Arrangements, Method Statements, Procedures, PQRs, QIPs, WPSs.Responsible for Maintaining Site Expenditures Record.Responsible for Gate Pass approval & maintaining record.

    • Engineering Trainee
      • Jul 2021 - May 2022

      Supervised water flushing of pipelines in order to removal of mud & any debris before commissioning.Responsible for pneumatic leak test of all piping of plants to ensure there is no leakage.Made loops for leak test according to client requirement.Supervised making of assemblies with high pressure fitting for filling points during leak test.Supervised maintenance & leak tests of tank skin valves to avoid any leakage during operations.Removal of all punch points observed inside the tanks & signing tank Box-up reports from client.Supervised changings in suction strainers of MOGAS & TRANSIX for better working which results less wear & tear in pump bearings & impellers.Supervised fabricating & available area calculation for temporary strainers at pump suction.Supervised commissioning of water sprinkles, hydrants & fire monitors.Responsible for maintenance of water sprinkles, hydrants & fire monitors.Calculated the liquid N2 requirement for nitrogen purging of piping & tanks.Calculated the time period required for nitrogen purging of pipelines & tanks.Made Loops for nitrogen purging according to client requirement & safe access of liquid nitrogen bowser.Supervised nitrogen purging of pipeline & successfully achieved the desired conditions within specified time.Supervised the pipeline maintenance during introduction of product and removed any leakage or seepage.Supervised the night shift during tanks nitrogen purging, successfully nitrogen purged 2 tanks of 15500 cubic meter capacity & safely introduced the product in the tanks.Supervised the Internal Floating Roof (IFR) movement during increase in tank level.Supervised the priming of pipeline before pump commissioning & made sure there is no air in pipeline & its properly filled with product.Coordinated with pump vendor during pump's commissioning & made sure hat pumps are working properly & giving optimal results.Responsible of killing all the post commissioning punch list points given by the client.

    • Pakistan
    • Appliances, Electrical, and Electronics Manufacturing
    • 700 & Above Employee
    • Intern
      • Jul 2019 - Aug 2019

    • Pakistan
    • Motor Vehicle Manufacturing
    • 400 - 500 Employee
    • Project Intern
      • Jun 2019 - Jul 2019

    • Pakistan
    • Automotive
    • 300 - 400 Employee
    • Intern
      • Jul 2018 - Aug 2018

    • Transportation/Trucking/Railroad
    • 500 - 600 Employee
    • Intern
      • Jun 2018 - Jul 2018

      - Worked in Spring, Electric and Locomotive shop - Observed the manufacturing of Spring Suspension System for Bogies - Analysed 1600 H.P and 2200 H.P Locomotive Diesel Engine with turbo charger under the supervision of experienced shop engineers - Worked in Spring, Electric and Locomotive shop - Observed the manufacturing of Spring Suspension System for Bogies - Analysed 1600 H.P and 2200 H.P Locomotive Diesel Engine with turbo charger under the supervision of experienced shop engineers

    • Intern
      • Jun 2017 - Jul 2017

      - Did a Course on Quality Control and Assurance in Industrial Manufacturing - Studied Metrology and observed different tools and methods to ensure Quality Control - Did a Course on Quality Control and Assurance in Industrial Manufacturing - Studied Metrology and observed different tools and methods to ensure Quality Control

Education

  • University of Engineering and Technology, Lahore
    Bachelor of Science - BS, Mechanical Engineering
    2016 - 2020
  • Ideal Group of Colleges
    Intermediate, Science
    2014 - 2016
  • Muslim Public Model High School Sheikhupura
    Matric, Science
    2011 - 2013

Community

You need to have a working account to view this content. Click here to join now