Syed Khurram Zaidi
Control Room Operator at Rabigh Power Company (Formerly, Rabigh Arabian Water & Electricity Company)- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English -
-
Urdu -
Topline Score
Bio
Credentials
-
Change Management / Assertive Communication
PROFESSIONALS for Human Resources DevelopmentDec, 2016- Oct, 2024 -
Authorized Employee Certified by Management (HSE)
RAWEC - Rabigh Arabian Water & Electricity CompanyNov, 2015- Oct, 2024 -
Work Ownership and Values Formation
PROFESSIONALS for Human Resources DevelopmentSep, 2015- Oct, 2024
Experience
-
RAWEC - Rabigh Arabian Water & Electricity Company
-
Saudi Arabia
-
Utilities
-
1 - 100 Employee
-
Control Room Operator
-
Oct 2014 - Present
It is the world's first 3-stage Reverse Osmosis (RO) desalination plant which requires shorter construction period and uses less energy in desalination compared with multistage flash (MSF) evaporating method plants that have been widely used in the Middle East but require more energy for evaporationRO System,consisting of 16 RO Trains which could produce 8,000 tons of desalinated water per hour. Each RO Train consists of 3 banks, known as 1st pass, 2nd pass and 3rd pass, The first pass RO membrane units are used to reduce chloride in seawater to produce brine water with 550 mg/liter chloride ion concentration. The second and third pass RO membrane units further reduce the chloride ion concentration of brine water to 5 mg/liter (Desalinated Water). Look After the Commissioning Activities carrying out at phase 2. Also involved in the testing of transformers 13.8 KV to 0.4 Kv Ensuring safe and smooth operation of the plantStart up and shut down of Reverse Osmosis plant and balance of plant.Monitor and visually inspect plant equipment and equipment indicators to detect operating make adjustments or minor repairs as required from CCR through DCS/HMI and Field.Chemical cleaning of 1st pass 2nd & 3rd pass RO membrane. Isolation and recommissioning of individual equipment or the whole system.Complete and maintain station records, logs and reports from CCR and field. Arrange and perform fire fighting drills of various types of fire.
-
-
-
K-Electric
-
Pakistan
-
Oil and Gas
-
700 & Above Employee
-
Associate Engineer
-
Jan 2009 - Oct 2014
250MW Combine Cycle Power Plant Korangi of Karachi Electric Supply Company, Pakistan.The Plant consists of:• 4 x LM6000 PC Sprint Gas Turbines 48.5MWe each.(Woodward Micronet Controller,GE Fanuc PLC). • 1 x Heat Recovery Steam Generator 110 tons/hr.(Honeywell Experion C200 DCS Controlled).• 1 x GE Thermodyn 8-11MC9 Steam turbine 28 MWe, Air cooled generator.(Simplicity HMI, G.E. Fanuc P.L.C. Controlled).• 4 x Natural Gas Compressors GE Make Components, Flotech New Zealand Company (Compression Range 3.5 bar - 47.0 Bar with 26000N m3/h Flow).(Siemens S7-PLC Controlled.) • 1 x Gas Insulated Switchgear (Model: 8DN9) Double Bas Bar Double Breaker Series 220 KV.• 1 x 50m3/h Water Desalination Plant Reverse Osmosis type with Brackish Water Reverse Osmosis Water plant (BWRO) and Electrolytic De-Ionizer.(Allen Bradley SLC-5 PLC Controlled).
-
-
Sub Engineer
-
Sep 2004 - Jan 2009
From 2004 To 2009 Worked As A Sub_Engineer In 380 MW Korangi Thermal Power Plant.. .Core Responsibilities: Startup and shutdown of plant, Startup & shutdown of STEAM turbine and Boiler To operate the BOP from trouble shoot on critical situation Observation of main equipments. Isolation and re commissioning of an individual equipment and whole system. Coordination with other departments in maintenance jobs and process. Perform routine maintenance procedures and test. Perform PTW system. Implementation of EHSQ. Switching of 220kv through GIS.
-
-
Education
-
Newports Institute of Communications and Economics
Bachelor of Technology (B.Tech.) Hons., Mechanical Engineering -
Newports Institute of Communications and Economics
Bachelor of Technology (B.Tech.) Pass, Mechanical Engineering -
Pakistan Swedish Institute of Technology
Diploma of Associate Engineer, Mechanical Engineering