SYED KAMRAN SHAH
Electrical Engineer at Fecto Group of Companies- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Pashto Professional working proficiency
-
English Professional working proficiency
-
Urdu Professional working proficiency
Topline Score
Bio
Credentials
-
ELECTRICAL CONTROL SYSTEM DESIGN IN BOILERS
Heavy Mechanical Complex (HMC)Nov, 2015- Oct, 2024 -
PROJECT MANAGEMENT
MDi PakistanJan, 2015- Oct, 2024 -
MICROCOLTROLLER 89c51
IEENov, 2009- Oct, 2024 -
CIVIL DEFENSE STREET RESCUE SERVICE
Civil DefenceApr, 2006- Oct, 2024 -
SPORTS CERTIFICATE IN CRICKET
Govt Post Graduate College Mandian AbbottabadJun, 2005- Oct, 2024 -
APPRCIATION CERTIFICATE ON SUCCESSFUL INSTALLATION OF 6MW WHRPP
Dalian East New Energy Development Co., Ltd.
Experience
-
Fecto Group of Companies
-
Wholesale Building Materials
-
1 - 100 Employee
-
Electrical Engineer
-
Jun 2023 - Present
-
-
-
RABIH TRADING LLC
-
Pakistan
-
PROJECT ENGINEER ELECTRICAL, INSTRUMENTATION & POWER GENERATION
-
Nov 2020 - Dec 2022
Erection & Commissioning of 12 MW Waste Heat Recovery Power Plant at Askari Cement Ltd. Nizampur (AVIC Chinese Project). Leading and managing a team of 9, including 2 Engineers & 7 technical staff for elimination of repetitive failures & improvement of reliability & capacity of electrical equipment and support systems for 132/6.3 kV/0.4kV Substations & Waste Heat Recovery Power Plant. Reporting to field manager, attending official meetings with top management, shaping strategic directions, controlling budget, planning. Responsible for preventive, predictive & corrective maintenance supervision at plant and its record as well. Fulfillment of all safety standards to ensure human and equipment safety. Responsible for maintaining critical inventory and spares for trouble free operation of plant. Handling & executing end-to-end management of short & long term engineering projects, including pre-feasibility studies, engineering design and safety reviews, finalization of drawings, execution, pre and post testing / inspection of machines and equipment. Controlling inventory management of electrical & Instruments related project; planning and scheduling, Generating/processing work order through module of ERP system. Operational In charge of 6.3kV MV & 0.4kV LV substations, Waste Heat Recovery Power Plant (12 MW) & control panels, VFD’s, Soft Starters, Switchgear & emergency Generator etc. Leading and contributing to Plant Root Cause Failure Analysis (RCFA) & Failure Modes Effects Analysis (FMEA) processes involving or related to electrical equipment and related systems to ensure corrective actions, repairs, and modifications & in time execution. LV & MV maintenance, supervision & record & responsible to provide smooth power supply to all equipment through LV station. Installation of various instruments as per P&ID’s at TG building AQC & SP boilers. Show less
-
-
-
Bestway Cement Limited
-
Construction
-
700 & Above Employee
-
Assistant Manager
-
Oct 2017 - Aug 2019
In-charge of Waste Heat Recovery Power Plant, E & I Department.
Leading and managing a team of 12, including 3 Engineers & 9 technical staff for elimination of repetitive failures & improvement of reliability & capacity of electrical equipment and support systems for 132/6.3 kV/0.4kV Substations & Waste Heat Recovery Power Plant.
Installation, testing & commissioning of 8 MV (6.3 KV) Switchgears of WHRP Substation, MCC’s LTMR & LTMCU based
Schneider make, distribution transformer 800 KVA, frequency drive ABB ACS 510.
Installation, testing & commissioning of TSI Bentley Nevada 3500 system, Turbine instrumentations like Casing expansion sensor, vibration sensors on bearings, Axial displacements sensor, differential Expansion sensor, thrust bearing temperature sensors, bearing metal temperatures, bearing oil return temperatures, pressure switches.
Installation, testing & commissioning of Field Instruments including thermocouple, RTD, pressure & temperature gauges,
magnetic float level gauge, material hopper level switch and rotation detector.
Outsource and witness testing & commissioning of Siemens protection Relay 7UM62, 7VE61 and 7SD61.
Responsible for troubleshooting of various electrical equipment & instruments for trouble-free operation.
Responsible for Root Cause Analysis (RCA) & its report preparing during any critical fault.
Worked on Enterprise Resource Planning (ERP) & SAP
Manages plans and provides inputs for CAPEX & OPEX budget preparations for the financial year for smooth operation of plant..
Purchase of spares & critical spare parts through coordination with procurement department for smooth operation of plant.
Make sure all safety precautions and proper measures to be taken to protect human life and equipment.
Documentation of complete calibration, Preventive, predictive & corrective maintenance records. Show less -
-
Junior Engineer
-
May 2014 - Sep 2017
In-charge of Waste Heat Recovery Power Plant, E & I Department.
Leading and managing a team of 12, including 3 Engineers & 9 technical staff for elimination of repetitive failures & improvement of reliability & capacity of electrical equipment and support systems for 132/6.3 kV/0.4kV Substations & Waste Heat Recovery Power Plant.
Installation, testing & commissioning of 8 MV (6.3 KV) Switchgears of WHRP Substation, MCC’s LTMR & LTMCU based
Schneider make, distribution transformer 800 KVA, frequency drive ABB ACS 510.
Installation, testing & commissioning of TSI Bentley Nevada 3500 system, Turbine instrumentations like Casing expansion sensor, vibration sensors on bearings, Axial displacements sensor, differential Expansion sensor, thrust bearing temperature sensors, bearing metal temperatures, bearing oil return temperatures, pressure switches.
Installation, testing & commissioning of Field Instruments including thermocouple, RTD, pressure & temperature gauges,
magnetic float level gauge, material hopper level switch and rotation detector.
Outsource and witness testing & commissioning of Siemens protection Relay 7UM62, 7VE61 and 7SD61.
Responsible for troubleshooting of various electrical equipment & instruments for trouble-free operation.
Responsible for Root Cause Analysis (RCA) & its report preparing during any critical fault.
Worked on Enterprise Resource Planning (ERP) & SAP
Manages plans and provides inputs for CAPEX & OPEX budget preparations for the financial year for smooth operation of plant..
Purchase of spares & critical spare parts through coordination with procurement department for smooth operation of plant.
Make sure all safety precautions and proper measures to be taken to protect human life and equipment.
Documentation of complete calibration, Preventive, predictive & corrective maintenance records. Show less -
-
-
Water and Power Development Authority
-
Pakistan
-
Civil Engineering
-
200 - 300 Employee
-
TREAINEE JUNIOR ENGINEER
-
Oct 2012 - May 2014
Prepare daily reading of all the energy meters of all hydro generators Prepare daily reading of temperature of transformers & winding temperature of hydro generators. Prepare daily ampere list of all motors. Monthly greasing of exciters & motors & Carbon brushes inspection & maintain record Hydro generators & Power transformers inspection maintenance on annual bases. Prepare daily reading of all the energy meters of all hydro generators Prepare daily reading of temperature of transformers & winding temperature of hydro generators. Prepare daily ampere list of all motors. Monthly greasing of exciters & motors & Carbon brushes inspection & maintain record Hydro generators & Power transformers inspection maintenance on annual bases.
-
-
Education
-
University of Peshawar
MASTERS OF SCIENCE IN ELECTRONICS, Electrical, Electronics and Communications Engineering -
Hazara University
BACHELOR OF SCIENCE IN ELECTRONICS, Electrical, Electronics and Communications Engineering -
PINE HILLS SCOOL & COLLEGE ABBOTTABAD
HSSC, Pre-Engineering