    • Saudi Arabia
    • Oil and Gas
    • 100 - 200 Employee
    • Project Engineer
      • Jul 2020 - Present

    • Project Engineer
      • Aug 2016 - Jun 2020

      To execute the Project scope of work within a target dates. To execute the Project scope of work within a target dates.

    • Qatar
    • Capital Markets
    • 1 - 100 Employee
    • Project Engineer
      • Feb 2014 - Dec 2015

      • Managing construction activities carried out, ensuring the scope of work is achieved in accordance with contract requirement and time frame, and compliance with specifications and standard established of GRE/FRP piping for sea water and cooling water connection with equipments like sea water back up pump, heat exchanger, and filter. • Arrangement of tie end connection with existing lines of sea water and cooling water supply. Coordinating the activities of subordinated supervisors ensuring that the project steps are respected. Ensuring that contractor’s duties are performed by competent and experienced personnel and in sufficient number to achieve objectives. • Schedule monitoring for manpower mobilization welding Dia-inch, No. of spools and Pipe Supports. Piping internal inspection witness for large bore piping. Check if the latest construction drawings are used. Consult Engineering problems. Check and consult spools delivery in site. Check work front and coordinate with other disciplines. Request for scaffolding constructions. Ensure work permits (confined space entry, welding, grinding, erection, work for high level, etc). Follow Up of punch work. Prepare daily and weekly reports. Show less

    • Mechanical Engineer piping/project engineer
      • Sep 2008 - Dec 2015

      To supervise and organize the mechanical construction activies regarding piping. To supervise and organize the mechanical construction activies regarding piping.

    • Saudi Arabia
    • Construction
    • 100 - 200 Employee
    • Mechanical Engineer
      • Oct 2011 - Sep 2013

      • Monitor and analyze various aspects of progress of all activities of underground piping GRE, FRP, PVC, UPVC, CPVC on daily basis with the implementation of daily schedule. • Prepare daily and weekly reports for ongoing progress. • Analyze the projects status and set the corrective action needed. • Raising Material Take off for all materials required to additional materials for hydro test etc. • Coordinating and liaise with the Client on detail engineering requirements. • Responsible for Piping erection operations and pipe support installation in accordance with schedule, Procedures, Specifications, Priorities and Availability of Construction Drawings. • Ensure the Productivity and Quality is maintained by subordinates. Coordinate with other Disciplines in site. • Assist Design Department in solving Piping Modification and Technical Problems in the Field. • Responsible for counter checking by Isometric/Piping plan for the spools erected in the correct location, orientation, alignment. • Preparation of “AS BUILT” drawings. • Preparation of field piping system test packages. • Responsible for Conducting Hydro tests, fulfilling commissioning and Pre-Commissioning requirements for the project. • Responsible for line checking after hydro test to complete the post punch list prior to sign-off the test packages before signing the completion of piping / mechanical. • Ensure that hydro test reinstatement is to be done as per procedure. • Ensure that all punch list items are resolved, client handover is satisfactorily concluded and that there is no prolongation of project. Show less

    • Saudi Arabia
    • Legal Services
    • 1 - 100 Employee
    • Mechanical Engineer (Site)
      • Jun 2010 - Sep 2011

      • In-charge for the construction, installation and pipe laying of Fiberglass Reinforced Thermosetting Pipes (RTR) for firewater, oily water, service water, lines including all of its metallic connections and fittings as per detailed drawing. • Supervises and monitors the scope of work in accordance with the project schedule, specifications and requirements. • Prepares daily progress report and documents to assist project monitoring, highlights any delays due to unavailability of manpower, materials, drawings or technical documents. • Assigns pipefitters and technicians on a specific work to meet construction work load Prepares materials takeoff as per installation details. • Conducts Hydro test and Gravity Leak Test of pipeline for the final approval of Quality Control and Saudi Aramco. Show less

    • Mechanical Engineer (Site)
      • Sep 2008 - Feb 2010

      • Managing underground GRE, FRP piping activities carried, ensuring the scope of work is achieved in accordance with contract requirement and time frame, and compliance with specifications and standard established. • Coordinating the activities of subordinated supervisors ensuring that the project steps are respected. • Ensuring that contractor’s duties are performed by competent and experienced personnel and in sufficient number to achieve objectives. • Ensuring that the Quality of carried out complies with QA/QC standards. • Reviewing and commenting on documentation produced (technical reports, specifications, procedures, method of statement, Site instruction etc.) ensuring implementation of established procedures and good engineering practice. • Ensure work permits (confined space welding, grinding, erection, work for high level, etc). Prepare daily and weekly reports. • Daily participation to the progress meetings in order to establish the priority operations. • Demanding workers to provide a good quality work and checking that all workers have the complete safety work equipment (overalls, gloves, glasses, helmets, safety harness and adequate tools). • Daily progress in quality conditions with the required standards. Show less

    • Maintenance Engineer
      • Nov 2006 - Sep 2008

      • Primarily responsible for planning, organizing, supervising and Hands-on Repair, Corrective and Preventive Maintenance of Centrifugal, Rotary, and Positive-Displacement Pumps and Compressors, and other rotating and mechanical equipments ensuring continuous operation. • Suggests and performs temporary and permanent countermeasures in machines to improve machine productivity. • Monitors machine performance, improvement and evaluate machine efficiency and yield. • Conducting mainly breakdown maintenance to ensure continuous production, prevent stagnant and delay outputs specifically “very urgent” deliveries and maintain “zero” flow out of defective products. • Prepare the daily preventive maintenance and corrective action report. • Supervised the condition monitoring team. • Coordination with shift supervisors. • Enforces safety regulation, good housekeeping, and provides technical education to all subordinate staffs making sure they are familiar with relevant work policies, procedures and safety guidelines. Show less

Education

  • UET Lahore Pakistan
    Bachelor's degree, Mechanical Engineering
    2002 - 2006
  • University of Engineering & Technology
    Bachelor of Engineering (BE), Mechanical Engineering
    2002 - 2006

Community

You need to have a working account to view this content. Click here to join now