Syarif Dwi Priyanto

Assitant Unit Controller (AUC) CFPP 2x1000MW Tanjung Jati B Unit 5&6 at PT. Bhumi Jepara Service
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Central Java, Indonesia, ID

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Indonesia
    • Oil and Gas
    • 100 - 200 Employee
    • Assitant Unit Controller (AUC) CFPP 2x1000MW Tanjung Jati B Unit 5&6
      • Nov 2021 - Present

    • Shift Staff Operation(Plant OPR) CFPP 2x1000MW Tanjung Jati B Unit 5&6
      • Nov 2019 - Oct 2021

      As Shift Staff Operation (Plant OPR), during contruction & Commissioning :1.Support several commissioning activities of TJB 56 project, on turbine & generator system, boiler system, also water & waste water treatment plant system and electrical.2. Conducting daily checksheet and monitoring of water treatment plant, GIS 500 KV, diesel and electric fire system etc.3. Learn and discuss all realted document of each system with operation and commissioning team.4. Join Commisioning Activity: as example,Generator Stator Cooling Water FlushingSolo Runtest Motor NaClo Dosing PumpLoopcheck signal for GT Unit 6Filling oil gearbox at traveling screenFilling oil gearbox at trashrackModification Deaerator vent line at start up boilerAdd bird screen on FD Fan inlet (Startup boiler)Solo runtest travelling screen wash pumpDiesel and elextric fire pump weekly testCPP regen: motor runtest for acid&casutic metering pumpChange over HE CCCWChange filter at GSCW filter AElectrochlorination loop checkPreservation at Main lube oil, EHC and BFPT Lube oilCT Individual test at CWP Show less

    • Mech Engineering and Marketing (Sales Engineering)
      • Apr 2019 - Nov 2019

      As mechanical Engineering: 1. I have made some EPC project proposal for -for power Plant: a,PT PJB UBJOM Tanjung Awar-Awar b.IP Semarang c. etc -Sugar Factory: a. PT Kebon Agung b. PT Madubaru c. PT IGN d. PT Laju Perdana Indah e. PT Candi Baru f. Etc other industrial factory: a. PT Dua Kelinci b. PT Garuda c. PT Superindo d. etc 2. As Mechanical engineer at as example in Madubaru Project (PT. Madubaru Yogyakarta), I have designed Steam drum to improving plant performance and efficiency. I use ASME Sec I PG 27 to do a to analyze the plat thickness of Steam drum. So, of course, I must often make coordination with process engineer to discuss what steps to improve will be taken next. besides that, I also developed a datasheet and revamping procedure. and other project for estimated calculation for example, Repair of pump, Valve, and another problems in client. 3. As Mechanical engineer at as example in Superindo Project ), I have designed modify boiler gas to boiler fuel palm shells to improving plant performance and efficiency. 4. Meeting for Anwijzing some project and discuss with client about project. Show less

    • Indonesia
    • Higher Education
    • 100 - 200 Employee
    • Bachelor Degree of Mechanical Engineering
      • Aug 2015 - Feb 2019

      Bachelor Degree of Mechanical Engineering

    • Fresh Graduated
      • Aug 2015 - Feb 2019

    • Head Of Division Badan Eksekutif Mahasiswa Universitas Diponegoro
      • Jan 2017 - Jan 2018

      • Responsible for the management of activities across the board for one year of division.• Implement the general policies regarding the affairs of the organization of division.• Responsible for cooperation and communication with the other student councils at Diponegoro University.

    • Vice Chairman Keluarga Mahsiswa Jepara Semarang (KMJS) Diponegoro University
      • Jan 2016 - Jan 2017

      • Lead Organizational founding•Responsible person to bureaucracy •Implement the general policies regarding the affairs of the organization KMJS Diponegoro University• Establish and / or decide all policies relating to KMJS Diponegoro University•Plan all of work programs in 1 year with head departments, and control them

    • Indonesia
    • Appliances, Electrical, and Electronics Manufacturing
    • 1 - 100 Employee
    • Researcher (Peneliti Tugas Akhir)
      • Mar 2018 - Jan 2019

      Analisis energi dan eksergi keseluruhan pada PLTU tersebut. guna mengetahui kerusakan eksergi dan kontrol mekakukan perbaikan komponen.

    • Internship Trainee
      • Jan 2018 - Feb 2018

      • Energy Analysis of Turbine Steam Power Plant Unit 2 PT PLN (Persero) Unit Induk Pembangkitan Tanjung jati B jepara.• Learned how to use code and standard SQL software analysis.•Inspection of performance component

Education

  • Diponegoro University
    Bachelor's degree, Mechanical Engineering
    2015 - 2019

Community

You need to have a working account to view this content. Click here to join now