Syamiza Jamian
QA/QC Assistant at Dominant Energy Sdn Bhd- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Dominant Energy Sdn Bhd
-
Malaysia
-
Oil and Gas
-
1 - 100 Employee
-
QA/QC Assistant
-
May 2021 - Present
✔ Have Oil & Gas Safety Passport (OGSP) valid until 18/08/2024 ✔ Responsible to the QAQC Engineer/Supervisor on all secretarial, projects ; such as reports (Fit Up, Visual, Mrir, Painting) ✔ Responsible to record tracking of all in and out documents. ✔ Manage submission of in and out requests such as Request For Inspection (RFI). ✔ Ensure all project correspondences are properly filed for ease of retrieval at desired times. ✔ Work Control Sheet (WCS) and Testpack runner during Shutdown 2022 PROJECT INVOLVE: 1. REFINARY ASSET REJUVANATION TIGA (RESET) PROJECT (WP20A) - 2021-2023 2. SUPPLY, DELIVERY, INSTALLATION OF PIPE (TA 2022) RESET PROJECT WP20B (SHUTDOWN 2022 - MELAKA) 3.PROVISION OF PIPING REPLACEMENT WORKS AT MARINE TRESTLE (MT) - BERTH TRESTLE (BT) FOR RESET 2.0 PROJECT FOR MRCSB (WORK PACKAGE 121) Show less
-
-
-
Dominant Energy Sdn Bhd
-
Malaysia
-
Oil and Gas
-
1 - 100 Employee
-
Document Controller
-
Aug 2019 - Aug 2020
✔Responsible in clerical job such as prepare the letter, send faxes, and make transmittal sheet to transmit to client accordingly their job. ✔ Control in and out of documents for PCDM projects such as procedure and engineering drawing. ✔ Liasise with consultant for Engineering Drawing by accept and transmit the document to client. ✔ Arrange the drawing by project and by part such as piping isometric drawing, p&id drawing, structure drawing, electrical and instrumentation drawing. ✔ Liaise with the QA/QC department and update to them about the status of the transmit document and trace the documents that are pending approval from client. ✔ Prepare Work Progress Certificate for claim purpose by project with complete supporting documents and transmit to the client. ✔ Prepare final documentation when the project is done. ✔ Assist manager to prepare the tender submission. PROJECT INVOLVE: 1. New Jumperline Installation at T-7554 and Unit 18 MG3 to Enable T-7554 Shutdown for Maintenance 2. EPCC for MG3 HTHA Replacement Project for PSR-2 Turnaround (TA) 2019 3. EPCC for Replacement of P-30250 A/B ARV to Conventional Spillback 4. EPCC for to Reroute Excess H2 from HCDS PSA to PSR-1 Fuel Gas System 5. EPCC for Replacement of 1st Three Row of Convection Coil, Skin Thermocouple and Peep Hole Installation for F-390021 Furnace 6. PCC for the Tie-In Work for New Hydrocracker Automatic Counter-Washing Rotary (ACR) Feed Filter Skid at MRCSB during TA PSR-2 2019 Show less
-
-
-
UTeM
-
Higher Education
-
500 - 600 Employee
-
Graduate Research Assistant
-
Sep 2017 - Aug 2019
✔ Do a research on a new technique to improve tracking performance of a pneumatic actuator system. ✔ Attend conference/seminar/program that prepared by the university. ✔ Prepare progress report and submit to the researcher to monitor the progress of the project. ✔ Write a paper/journal/book chapter and send for publication (Scopus/Springer/Google Scholar) ✔ Do a research on a new technique to improve tracking performance of a pneumatic actuator system. ✔ Attend conference/seminar/program that prepared by the university. ✔ Prepare progress report and submit to the researcher to monitor the progress of the project. ✔ Write a paper/journal/book chapter and send for publication (Scopus/Springer/Google Scholar)
-
-
Education
-
Universiti Teknikal Malaysia Melaka
Bachelor in Electrical (Control, Instrumentation & Automation), Electrical Engineering