syaiful ichsan

RF Engineer at PT Intisel Prodaktifakom
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Indonesia, ID

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Telecommunications
    • 100 - 200 Employee
    • RF Engineer
      • Jan 2019 - Present

    • Indonesia
    • Telecommunications
    • 200 - 300 Employee
    • Initial Tuning 3G XL Network Optimization Engineer
      • Jan 2014 - Jan 2015

      For 3G XL- HUAWEI Initial Tuning New Sites January 2014-December 2015 1.Create Neighbours List (soft HO,Softer HO,IRAT and FirstCarrier HO to 2nd Carrier HO) 2.Propose recommendation Change parameter and audit DEL or ADD Adjacent Request to OSS team 3.Propose recommendation to change Audit physical antenna tilting, re-orientation based CDR to meet KPI and layering proposal 4.Troubleshooting of poor network based on drive test data, monitoring daily statistic and Review Acceptance Document Show less

    • Telecommunications
    • 1 - 100 Employee
    • 2G/3G RF Engineer
      • Jan 2011 - Dec 2013

      # As 3G RF Engineer Rool Out ERICSSON-Telkomsel Project East Java-Indonesia, 1. Single Node B verification : Coverage, Voice, Video, PS R99, HSDPA. Verify CSSR, Video Call Setup, DCR, PDP Activation Success rate, SGSN Attachment success rate, HOSR and ISHO. 2. Analyze the Coverage Area such as RSCP,EcIo ,Pilot Polution etc. 3. Analyze radio network problem such as swap feeder, interference, overshooting. 4. Site Audit, to Check the antenna orientation, compare with the design 5. Neighbor Plan Optimization. 6. Monitoring Performance Assessment. 7. Troubleshooting of poor network based on drive test data, daily statistics and customer complaint. 8. Prepare FA Report to customer. Show less

    • Indonesia
    • Telecommunications
    • 200 - 300 Employee
    • 2G RF Optimization Network Performance
      • Jun 2009 - Jan 2011

      # As 2G RF Optimization Engineer Initial Tuning ERICSSON-Telkomsel Mars Project South Sumatera-Indonesia, Indonesia. 1. Analysing and monitoring Newsite Performance in terms of 3 agreed KPI: SDSR, HOSR and Drop Call Rate, then propose a solution for each problem. 2. Analysing the performance of trial Colocated Site multivendor (GSM by Siemens and DCS by Ericsson). 3. Analyze radio network problem such as swap feeder, interference, overshooting. 4. Making proposals for the solution to all of the problems found during drive test to Telkomsel. Proposals including: modify the antenna parameter (tilt, orientation, height, position, type) and modify BSS parameter (HO parameter, BTS power, etc. 5. Improve and maintain KPI of new sites into acceptance target. Manage resources and load distribution. Compile data for team support, customer request and complaint, presentation and reporting. Show less

    • United States
    • Think Tanks
    • 100 - 200 Employee
    • 2G-3G DriveTest Analysis
      • Apr 2008 - Apr 2009

    • Indonesia
    • Telecommunications
    • 200 - 300 Employee
    • 2G-3G-CDMA Drive Tester Engineer
      • Jul 2007 - Apr 2009

      # PT. HUAWEI Investment-PT. NTS Manage Service 2G-3G West Java,Indonesia # PT. Huawei Investment - PT.TELKOM FLEXI Manage Service LAMPUNG,North Sumatra and NAD, Indonesia. # PT. Huawei Investment - PT.INDOSAT-StarOne CDMA for Indosat Network in Sulsel-Sultra Indonesia. # PT ERICSSON - PT. Natrindo Telecom Sellular (AXIS) NPI in Jabodetabek, Indonesia # PT ERICSSON - PT. Telkomsel Rool Out Telkomsel 3G East java, Indonesia # PT ERICSSON - PT. Telkomsel Rool Out Telkomsel 3G Sumbagut, Indonesia 1 Drive Test to collect data such as coverage, soft hand over, softer hand over, Voice call, Video call,FTP, Performing Data test, Including : GPRS, EDGE, UMTS R99 and HSDPA and Analyze problem such as swap feeder, interference, overshooting. 2 Performing Benchmark (comparation network all operator or SWAP Project) 3 Site Audit, to Check the antenna orientation, compare with the design or recommendation from RNO engineer 4 Analyses drive test result and Post processing to get data statistic, such as Call setup successful rate (CSSR), Handover success rate (HOSR), dropped call rate,Blocked call Rate and Performing data Test etc 5 Submit Report to Customer Show less

Education

  • Electronic Engineering Polytechnic Institute of Surabaya-ITS (EEPIS-ITS)
    Electrical engineering
    2003 - 2006

Community

You need to have a working account to view this content. Click here to join now