sushant singh

Inspection Engineer and Coordinator. at APS Group
  • Claim this Profile
Contact Information
Location
IN

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • Brazil
    • Computers and Electronics Manufacturing
    • 1 - 100 Employee
    • Inspection Engineer and Coordinator.
      • Oct 2022 - Present
    • Inspection Engineer
      • Jul 2020 - Oct 2022
    • Egypt
    • Construction
    • 700 & Above Employee
    • QA/QC Engineer
      • Mar 2019 - Jun 2020
    • Inspection Engineer
      • Jul 2018 - Feb 2019
    • QA/Qc
      • Mar 2014 - Mar 2018

       Preparing the ITP, MS, Inspection Reports, MAR, Procedure, WPS&PQR & Receiving Inspection and get approval from client (GASCO).  Witnessing the Welder’s Qualification Test and got approval by the client & Third Party Inspector.  Evaluated the test certificates, calibration certificates of oven, consumables, Instrument, equipments, etc.  Performing all QC related activities.  Witnessing the Hydro Test & Pneumatic Tests.  Assessing the: • Incoming materials as per the MTR. • Documents like WPS, Welder Qualification. Show less

    • United States
    • Insurance
    • 1 - 100 Employee
    • QC Engineer
      • Dec 2012 - Feb 2014

       Developing and implementing project quality plans, inspection, test plans, manage clients, IMS procedures, internal and external audits, carry out QC inspections, maintain NCR logs, support compilation of quality records, etc.  Witnessing the Procedure & Welder’s Qualification Test and got approval by the client & Third Party Inspector.  Carried out the Calibration& renewal of Instruments, Furnace & Electrical oven.  Arranging to carry out the inspection of the incoming materials as per the project recruitments to Client.  Conducting the following: • Review of the drawings and assessing the dimensions in fabrications. • Review of Fit-up inspection of fabricated spools involving, material identity, Traceability, dimensional accuracy and ensuring use of latest revision of approved drawings.  Conducting a verification of: • The correct use of WPS, Welders, Preheat and Electrode drying ovens at field Line inspection after the construction activities.  Performed a follow-up of the welding operation & final weld profiles inspection.  Clearing the NDE requirements as per the project specifications. Show less

Education

  • APJ Abdul Kalam Technological University
    Bachelor's degree, Mechanical Engineering
  • don bosco high school vadodara
    1998 - 2006

Community

You need to have a working account to view this content. Click here to join now