Suresh Kumar

Electronic Engineer at Regal Technologies
  • Claim this Profile
Contact Information
Location
Dubai, Dubai, United Arab Emirates, AE

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • United Arab Emirates
    • Telecommunications
    • 1 - 100 Employee
    • Electronic Engineer
      • Jun 2022 - Present
    • Electrical Engineer
      • Nov 2019 - Mar 2022

      • Site assessment for solar power project / water heater. • Preparation of site visit report and submit to management for quotation and other process. • Check technical parameter of products and confirm to management for purchase. • Underground and aboveground cable laying and the Installation of JB’s, trays, Cables etc. • WTI & OTI Calibration of transformer. • Alarm & Trip test carried out for transformer different protective device like WTI, OTI, and Buchholz relay, PRD. • Site assessment for solar power project / water heater. • Preparation of site visit report and submit to management for quotation and other process. • Check technical parameter of products and confirm to management for purchase. • Underground and aboveground cable laying and the Installation of JB’s, trays, Cables etc. • WTI & OTI Calibration of transformer. • Alarm & Trip test carried out for transformer different protective device like WTI, OTI, and Buchholz relay, PRD.

    • Electrical Engineer
      • Feb 2020 - Mar 2021

      Manufacturing of Lt Panels Like ACB, VCB ~Calculation of Bus Bar Size CU and AL ~Low voltage cable insulation testing by using megger. ~Manufacturing of Variable Frequency drive panel. ~ Final Test Report Manufacturing of Lt Panels Like ACB, VCB ~Calculation of Bus Bar Size CU and AL ~Low voltage cable insulation testing by using megger. ~Manufacturing of Variable Frequency drive panel. ~ Final Test Report

    • Kuwait
    • Oil and Gas
    • 700 & Above Employee
    • Electrical Foreman
      • Sep 2018 - Sep 2019

      ~High voltage cable assessment and safety measure. ~ Electrical Breaker, Electrical gliding ~High voltage check point and safety measure ~Execution of the project engineering involving Installation, commissioning & testing of electrical equipment’s. Including substation, electrical panel ~boards, indoor electrical distribution, Earthing ~High voltage cable assessment and safety measure. ~ Electrical Breaker, Electrical gliding ~High voltage check point and safety measure ~Execution of the project engineering involving Installation, commissioning & testing of electrical equipment’s. Including substation, electrical panel ~boards, indoor electrical distribution, Earthing

    • India
    • Appliances, Electrical, and Electronics Manufacturing
    • Electrical Engineer
      • Mar 2016 - Oct 2017

      • Site supervising of ground cable wiring and safety of work. • Report preparation in terms of safety measure and working progress. • Overhead cable termination supervising and support in technical matters. • High voltage cable assessment and safety measure. • Have done all aspects from initial sale to system design, to actual installation. • Project work included site surveys, quote generation, and working with other engineers in system design. • Marketing and Sales Executive, Sales negotiating skills Show less

Education

  • Corporate Institute of Science & Technology, Nagar, Raisen Road, Bhopal
    Electrical and Electronic engineering, Electrical and Electronics Engineering
    2011 - 2015

Community

You need to have a working account to view this content. Click here to join now