Sunil Vedula

Founder & CEO at NanoPrecise Sci Corp
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Edmonton, CA
Languages
  • Hindi -
  • Telugu -
  • French -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Omid Shahsavari, P.Eng.

I am writing to recommend Sunil Vedula for Mechanical Engineer position specializing in piping stress analysis via CAESAR II. I had the opportunity of working with Sunil at Sherritt International Corporation since Dec.2014 up to Oct.2015. His dominance over international codes and standards such as ASME B31.3 & etc was undeniably valuable to our team and could be helpful to his assigned capital projects in several critical situations. Sunil was a valuable member of the team and an asset to the company. He has excellent communication skills. In addition, he is a very good team player and extremely organized and reliable. Sunil can work independently and is able to follow through to ensure that the job gets done. I am strongly recommending for him.

Himansu Sekhar Jena

Sunil is a hard working & result oriented manager with a very positive attitude. I wish him success in all his endeavours. Good luck!!!

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • P.Eng
    The Association of Professional Engineers and Geoscientists of Alberta (APEGA)
    Feb, 2014
    - Nov, 2024

Experience

    • Canada
    • Software Development
    • 1 - 100 Employee
    • Founder & CEO
      • Dec 2017 - Present

      Applying cutting edge data science knowledge and creating new data science models in following fields for multiple clients: - Signal Processing - Image Processing - Natural Language Processing Applying cutting edge data science knowledge and creating new data science models in following fields for multiple clients: - Signal Processing - Image Processing - Natural Language Processing

    • Canada
    • Mining
    • 700 & Above Employee
    • Mechanical Engineer
      • Dec 2014 - Oct 2015

       Worked as a Lead Mechanical Engineer on various maintenance & integrity projects. Coordinated with various disciplines on a team of 5-10 employees on a portfolio of 10-15 expense and capital projects at a time. Every project was completed within the budget & schedule.  Designed a storage tank & worked on the repair or replacement decision for the existing tank resulting in taking an important decision which helped avoid the tank to go to the failure stage.  Undergone training for CRN… Show more  Worked as a Lead Mechanical Engineer on various maintenance & integrity projects. Coordinated with various disciplines on a team of 5-10 employees on a portfolio of 10-15 expense and capital projects at a time. Every project was completed within the budget & schedule.  Designed a storage tank & worked on the repair or replacement decision for the existing tank resulting in taking an important decision which helped avoid the tank to go to the failure stage.  Undergone training for CRN & ABSA Registration process & applied the same which helped in project planning and completing projects on time as the regulatory process was always the critical path.  Advancement of the company’s standards such as Piping Specification, Tank Standard etc. to meet with the current technology & regulatory requirements meeting the corporate vision.  Designed the Safety Shower system & recommended various cost saving options.  Conducted an audit to figure out the possible causes of ammonia leakage and redesigned the ammonia vent system based on the plenum design to enable a safe working design for all the worker workings on the Ammonia unit.  Designed a critical 900# to 160# Steam Letdown station where high steam pressure was an issue. This required a lot of attention to detail and was successfully designed. Show less  Worked as a Lead Mechanical Engineer on various maintenance & integrity projects. Coordinated with various disciplines on a team of 5-10 employees on a portfolio of 10-15 expense and capital projects at a time. Every project was completed within the budget & schedule.  Designed a storage tank & worked on the repair or replacement decision for the existing tank resulting in taking an important decision which helped avoid the tank to go to the failure stage.  Undergone training for CRN… Show more  Worked as a Lead Mechanical Engineer on various maintenance & integrity projects. Coordinated with various disciplines on a team of 5-10 employees on a portfolio of 10-15 expense and capital projects at a time. Every project was completed within the budget & schedule.  Designed a storage tank & worked on the repair or replacement decision for the existing tank resulting in taking an important decision which helped avoid the tank to go to the failure stage.  Undergone training for CRN & ABSA Registration process & applied the same which helped in project planning and completing projects on time as the regulatory process was always the critical path.  Advancement of the company’s standards such as Piping Specification, Tank Standard etc. to meet with the current technology & regulatory requirements meeting the corporate vision.  Designed the Safety Shower system & recommended various cost saving options.  Conducted an audit to figure out the possible causes of ammonia leakage and redesigned the ammonia vent system based on the plenum design to enable a safe working design for all the worker workings on the Ammonia unit.  Designed a critical 900# to 160# Steam Letdown station where high steam pressure was an issue. This required a lot of attention to detail and was successfully designed. Show less

    • Canada
    • Oil, Gas, and Mining
    • 1 - 100 Employee
    • Lead Mechanical Engineer
      • Oct 2014 - Dec 2014

    • Canada
    • Oil and Gas
    • 100 - 200 Employee
    • Project Engineer/Senior Mechanical Engineer
      • Apr 2014 - Oct 2014

       Coordinated & led a team of multi-discipline engineering leads to successfully execute & close out several capital & expense projects. On one of the project, saved more than $15 million.  Prepared cost estimates and detailed project schedule, managed project change notices.  Coordinated & led a team of multi-discipline engineering leads to successfully execute & close out several capital & expense projects. On one of the project, saved more than $15 million.  Prepared cost estimates and detailed project schedule, managed project change notices.

    • Australia
    • Professional Services
    • 700 & Above Employee
    • Mechanical Engineer & Coordinator
      • Jul 2013 - Apr 2014

       Assisted in the preparation of Material Requisition of a $4 million Boiler and mechanical equipment such as Knock-Out Drum, Urea Stripper Column etc.  Coordinated the stress analysis work between Worley Parsons Canada & Worley Parsons India and led a team of 3 design engineers.

    • Mechanical Engineer
      • Nov 2011 - Jun 2013

       Calculated the reaction forces for both open discharge and closed discharge systems. Designed supports as per the pop-up force created by Pressure Suction Valve opening.  Calculated the loads on the pump nozzles by employing superior Fluid Mechanics principles & concepts and compared them to the twice of API 610 allowable nozzle loads and moments.  Worked on conducting stress analysis of the piping components for Suncor’s Forthills project ($14 billion), which is one of the biggest… Show more  Calculated the reaction forces for both open discharge and closed discharge systems. Designed supports as per the pop-up force created by Pressure Suction Valve opening.  Calculated the loads on the pump nozzles by employing superior Fluid Mechanics principles & concepts and compared them to the twice of API 610 allowable nozzle loads and moments.  Worked on conducting stress analysis of the piping components for Suncor’s Forthills project ($14 billion), which is one of the biggest projects in Alberta till date.  Performed stress analysis on firewater pipe and modelled special supports in Finite Element Analysis software. Excelled under stringent deadlines and strenuous schedules.

    • Machinery Manufacturing
    • 700 & Above Employee
    • Procurement Administrative Assistant
      • Aug 2011 - Nov 2011

    • India
    • Banking
    • 700 & Above Employee
    • Summer Intern
      • May 2010 - Aug 2010

    • South Korea
    • Construction
    • 700 & Above Employee
    • Pipeline Engineer
      • Jul 2007 - Jul 2009

       On-the-job training at Seoul, S. Korea. Was quick to adapt to new working culture while performing well in the day to day activities.  Preparation of engineering design critical items to be dealt in a more detailed way for various proposal projects.  Pump design based on fluid mechanics & hydraulics calculations.  Stress analysis of piping connected to pumps, columns, heat exchangers, filters, PSV.  Equipment nozzle qualification using Welding Research Council calculations… Show more  On-the-job training at Seoul, S. Korea. Was quick to adapt to new working culture while performing well in the day to day activities.  Preparation of engineering design critical items to be dealt in a more detailed way for various proposal projects.  Pump design based on fluid mechanics & hydraulics calculations.  Stress analysis of piping connected to pumps, columns, heat exchangers, filters, PSV.  Equipment nozzle qualification using Welding Research Council calculations, Flange leakage check, Dummy adequacy check etc.  With the help of Process & Instrumentation diagrams and 3D models of individual units, designed the new piping layout for the whole unit and prepared Approved for Construction drawings outlining the Bill of Material.  Reviewed the vendor documentations to assure compliance with the design and technical requirements. Show less  On-the-job training at Seoul, S. Korea. Was quick to adapt to new working culture while performing well in the day to day activities.  Preparation of engineering design critical items to be dealt in a more detailed way for various proposal projects.  Pump design based on fluid mechanics & hydraulics calculations.  Stress analysis of piping connected to pumps, columns, heat exchangers, filters, PSV.  Equipment nozzle qualification using Welding Research Council calculations… Show more  On-the-job training at Seoul, S. Korea. Was quick to adapt to new working culture while performing well in the day to day activities.  Preparation of engineering design critical items to be dealt in a more detailed way for various proposal projects.  Pump design based on fluid mechanics & hydraulics calculations.  Stress analysis of piping connected to pumps, columns, heat exchangers, filters, PSV.  Equipment nozzle qualification using Welding Research Council calculations, Flange leakage check, Dummy adequacy check etc.  With the help of Process & Instrumentation diagrams and 3D models of individual units, designed the new piping layout for the whole unit and prepared Approved for Construction drawings outlining the Bill of Material.  Reviewed the vendor documentations to assure compliance with the design and technical requirements. Show less

Education

  • University of Alberta
    MBA, Finance and Natural Resources
    2009 - 2011
  • Delhi College of Engineering
    BE, Mechanical Engineering
    2003 - 2007
  • Delhi Technological University (Formerly DCE)
    Bachelor of Engineering - BE, Mechanical Engineering
    2003 - 2007
  • Kendriya Vidyalaya
    High School, Maths & Science
    1992 - 2003

Community

You need to have a working account to view this content. Click here to join now