Sunil Sharma

QC Supervisor at Mulk Holdings FZC
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
United Arab Emirates, AE

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Arab Emirates
    • Wholesale Building Materials
    • 1 - 100 Employee
    • QC Supervisor
      • Nov 2014 - Present

      Work according to inspection and test plan. •Inspection of incoming material to comply to T&C requirements and also to carry out visual inspection for any damage •Review of Test Certificate as per applicable codes •Inspection of all Internal and External coating at site and shop •Stage by Stage Inspection as per check list (including fire property) •Ensure all activities takes place according to approved documents from customer, • Preparation of Inspection Report standards against the requirements. •Attend weekly meetings for progress and quality delivered. •Surface condition checking before delivered, •Visual check for paint color and appearance. •Adhesion test for each painting system on test panels •Visual, coating thickness checking with elcometer of primer, Intermediate coat, Finish coat, DFT check . •Review if valid Calibration certificates. •Checked pill off strength on every lot off production, as per standard, •Preparation of quality related documents, Ensure safe work environment, with personal safety equipment •Reporting to Qc Show less

    • India
    • Packaging and Containers Manufacturing
    • 200 - 300 Employee
    • Quality Control Executive
      • Mar 2014 - Oct 2014

      Optimizing man &machine utilization to achieve per -set production targets, •Process monitoring & Quality Controlling, •Close monitoring of each and every production plan and follow up to maintain zero discrepancies. •Attend weekly meetings for progress and quality delivered. •Visual check, surface profile, surface cleanliness, degree of roughness. •Reporting to plant head, Optimizing man &machine utilization to achieve per -set production targets, •Process monitoring & Quality Controlling, •Close monitoring of each and every production plan and follow up to maintain zero discrepancies. •Attend weekly meetings for progress and quality delivered. •Visual check, surface profile, surface cleanliness, degree of roughness. •Reporting to plant head,

    • United States
    • Machinery Manufacturing
    • 700 & Above Employee
    • Quality Control Associate
      • Aug 2012 - Feb 2014

      Preparation of all daily production report, process monitoring report, weight Control •Extrusion machine operating •Optimizing man &machine utilization to achieve per -set production targets •Process monitoring & Quality Controlling • Look forward for housekeeping.(Through 5s Act ivies) •Training to operator about process, •Handling man power in Shift, • Checked on line quality, & prepare rejection note on shift, Preparation of all daily production report, process monitoring report, weight Control •Extrusion machine operating •Optimizing man &machine utilization to achieve per -set production targets •Process monitoring & Quality Controlling • Look forward for housekeeping.(Through 5s Act ivies) •Training to operator about process, •Handling man power in Shift, • Checked on line quality, & prepare rejection note on shift,

    • Belgium
    • Glass, Ceramics and Concrete Manufacturing
    • Quality Control Supervisor
      • Oct 2008 - Apr 2012

      • Prepare Qc on line qc report, • Prepare shift wise production & rejection note. •checked all incoming raw material, • Approx 20 man power handling in a shift, • Reporting to production manager, • Prepare Qc on line qc report, • Prepare shift wise production & rejection note. •checked all incoming raw material, • Approx 20 man power handling in a shift, • Reporting to production manager,

Education

  • Central Institute of Plastic Engineering and Technology (CIPET), Bhubaneswar
    Diploma, Polymer/Plastics Engineering

Community

You need to have a working account to view this content. Click here to join now