Sunan Nusanguan
Braided line & Slick line Field Specialist at Freelancer- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English -
-
fair of Malay language -
-
Thai -
Topline Score
Bio
Experience
-
Dilevery.Pk
-
Pakistan
-
Food and Beverage Services
-
1 - 100 Employee
-
Braided line & Slick line Field Specialist
-
Oct 2022 - Present
-
-
-
Freelance
-
Asian Countries,Africa,Middle East
-
Snr Wireline & Slickline Field /Fishing Specialist
-
Jan 2008 - Present
• Consultant for PETRO EQUIPS Ltd, Malaysia using ASEP with 5/16”braided line for fishing various and tool strings, wire and lost in hole equipment in 5-1/2” and 4-1/2”tubing.GLV Operation for TOTAL,OFON Field Port Harcourt in Nigeria.Consultant for Geoservices Luanda Angola,Working on Drill Ship Saipem10000,Pride Angola and Pride Africa for running SSP plus on FMC hanger Halliburton plug FBN & RPT. • Occasional assignments in other Asian countries, JVPC,CUULONG in Vietnam, Brunei BSP,CTOC & Talisman in Malaysia, PTTEP and Coastal in Songkhla & Myanmar and Almansoori Well Services (Thailand) Ltd. Show less
-
-
-
Weatherford
-
Ireland
-
Oil and Gas
-
700 & Above Employee
-
Wireline Chief Operator
-
Jan 2006 - Dec 2007
• Working offshore for RASGAS Field. Gulf of Qatar. • Rotation 5/5 weeks. Using all braided line GIH 3/16, 7/32” and 5/16”, set 7”, 9” BPV, support Schlumberger due to perforating. • Set Monolock plug and junk catcher to isolate perforation zone. Fishing job in 7”and 9”big bore. • Using ASEP multi split combined units with smart monitor. • Working offshore for RASGAS Field. Gulf of Qatar. • Rotation 5/5 weeks. Using all braided line GIH 3/16, 7/32” and 5/16”, set 7”, 9” BPV, support Schlumberger due to perforating. • Set Monolock plug and junk catcher to isolate perforation zone. Fishing job in 7”and 9”big bore. • Using ASEP multi split combined units with smart monitor.
-
-
-
Geoservices company
-
Oil and Gas
-
500 - 600 Employee
-
Wireline Chief Operator
-
Jan 1998 - Dec 2005
• Supervised two wireline assistants and training programme. • Using ASEP unit 125” Alloy wire and Otis, Baker, PCE, Petroline downhole equipment’s. • High deviation gas and oil wells. • Multi-zone and Monobore well completions. • Wireline support for CTU and Hydraulic workovers. • Memory pressure gauge surveys (MQG-X) and reports. • Scale, sand problems and fishing operations. • Supervised two wireline assistants and training programme. • Using ASEP unit 125” Alloy wire and Otis, Baker, PCE, Petroline downhole equipment’s. • High deviation gas and oil wells. • Multi-zone and Monobore well completions. • Wireline support for CTU and Hydraulic workovers. • Memory pressure gauge surveys (MQG-X) and reports. • Scale, sand problems and fishing operations.
-
-
-
Amarit & Associates Thailand Ltd.
-
Unocal Field Gulf of Thailand
-
Wire Line Assistant
-
Jan 1994 - Dec 1997
• Assist wireline in production wireline routine job and well completion on the rig floor • Assist wireline in production wireline routine job and well completion on the rig floor
-
-
-
Otis Engineering Inc
-
Unocal Field Gulf Of Thaialand
-
Roughneck & Jack Operator
-
Jan 1990 - Dec 1993
• Snubbing operations and light workovers with 150-340K units. • Tubing change out, fishing, cementing and circulating etc. • Snubbing operations and light workovers with 150-340K units. • Tubing change out, fishing, cementing and circulating etc.
-
-
-
Amarit & Associates Thailand Ltd.
-
Eastern Queen,Sea Crest,RT-7 & RT-4 Unocal Field Gulf Of Thailand
-
Roustabout & Roughneck
-
Jan 1985 - Dec 1989
• Working on drilling rig Robray-4 as routing month on and off as Roughneck. • Working on drilling rig Robray-4 as routing month on and off as Roughneck.
-
-
Education
-
Satun Technical College
Certificate, Automobile/Automotive Mechanics Technology/Technician