suliman mohd kamal
Senior Technician at Pengerang Terminals (Two) Sdn Bhd- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English -
-
Malay -
Topline Score
Bio
Credentials
-
Orang Yang Kompeten Enjin Pembakaran Dalam (Gred 2)
DOSHNov, 2019- Nov, 2024 -
AUTHORIZED ENTRANT AND STANDBY PERSON FOR CONFINE SPACE
NIOSH (EAST COAST)Jan, 2017- Nov, 2024 -
MIS-BOSET( minimum industrial standard for basic offshore safety and emergency training
TSTC ICT & Security TrainingenJun, 2014- Nov, 2024 -
AUTHORIZED GAS TESTER AND ENTRY SUPERVISOR (AGTES)
NIOSH (EAST COAST)
Experience
-
Pengerang Terminals (Two) Sdn Bhd
-
Malaysia
-
Transportation, Logistics, Supply Chain and Storage
-
1 - 100 Employee
-
Senior Technician
-
Nov 2016 - Present
BERTH OPERATION AND TERMINAL ACTIVITY.GASOLINE, JET FUEL, SLURRY OIL, HOT OIL, DIESELUTILITIES NITROGEN, FIRE WATER, PLANT AIR, INSTRUMENT AIR COMMISIONING AND PSSR FOR UTILITY CRUDE , DCS AND PETROLEUM COMMISSIONING PROCEDURE BERTH OPERATION AND TERMINAL ACTIVITY.GASOLINE, JET FUEL, SLURRY OIL, HOT OIL, DIESELUTILITIES NITROGEN, FIRE WATER, PLANT AIR, INSTRUMENT AIR COMMISIONING AND PSSR FOR UTILITY CRUDE , DCS AND PETROLEUM COMMISSIONING PROCEDURE
-
-
-
ExxonMobil
-
Oil and Gas
-
700 & Above Employee
-
start up production specialist
-
Jun 2014 - Jun 2015
Involved and familiar with :• Oil / Gas Wellhead, Christmas Trees, Choke Valves and Flowlines• Oil / Gas Well Testing, Wet Gas Meter and Oil Test Separator• Wellhead Control Panel• Pigging Activities• Water & Gas Injection, Gas Lift System• Oil / Gas Separators• Glycol Dehydration Unit• Degasser Skimmer• Gas Turbines & Compressors (SOLAR TURBINE)• Open & Closed Drain System• Heat Exchangers• Water Makers• Chemical Injection System• e-ptw permit system, equipment isolation for mtce LOTO,
-
-
-
-
Operation Technician
-
Sep 2010 - Feb 2014
Operates safely all process equipment1. brine treatment2. Incinerator EDC waste3. Flare system4. Emergency neutralization5. Hydrochloric Acid6. Effluence handling 7. Cooling tower Operates safely all process equipment1. brine treatment2. Incinerator EDC waste3. Flare system4. Emergency neutralization5. Hydrochloric Acid6. Effluence handling 7. Cooling tower
-
-
-
-
Supervisor Process (chlor - Alkaline Plant) Chlorine, NaOH, HCL, NaOCL
-
Sep 2007 - May 2010
operate the plant mainly through computerized distributed control system 1. Electrolizer control2. chlor alkaline plan3. chlorine liquifaction4. caustic plan5. Sodium Hypochloric6. Hydrochloric acid7. Issuing work permit to contractors, electrical, mechanical or instruments for maintenance job. operate the plant mainly through computerized distributed control system 1. Electrolizer control2. chlor alkaline plan3. chlorine liquifaction4. caustic plan5. Sodium Hypochloric6. Hydrochloric acid7. Issuing work permit to contractors, electrical, mechanical or instruments for maintenance job.
-
-
-
-
Supervisor Process Ammonia (Nitric Acid Plant)
-
Jan 2005 - Sep 2007
Operate safely1. Nitric Acid Plant process, 2. Routine plant check and readings 3. troubleshoot for rectifications.4. Ammonia storage. 5. refrigeration system 6. Panel operation. 7. plant startup cold state, procedures, planned and emergency shutdown.8. Steam turbine startup, shutdown, cooling runs and blows through.9. Absorption and tail gas system. 10.Cooling water system plant air and other services. Operate safely1. Nitric Acid Plant process, 2. Routine plant check and readings 3. troubleshoot for rectifications.4. Ammonia storage. 5. refrigeration system 6. Panel operation. 7. plant startup cold state, procedures, planned and emergency shutdown.8. Steam turbine startup, shutdown, cooling runs and blows through.9. Absorption and tail gas system. 10.Cooling water system plant air and other services.
-
-
-
-
Plant Technician
-
May 2003 - Dec 2004
1. Hydrogenated batch plant process2. control all parameter as the procedures 3. Switch over product as per plan production and tank preparation.4. trouble shooting and rectifications any problem raises 5. preparation on nickle catalyst for reaction 6. monitoring all equipment’s in good conditions and inform supervisor for any abnormality. 1. Hydrogenated batch plant process2. control all parameter as the procedures 3. Switch over product as per plan production and tank preparation.4. trouble shooting and rectifications any problem raises 5. preparation on nickle catalyst for reaction 6. monitoring all equipment’s in good conditions and inform supervisor for any abnormality.
-
-
-
-
Plant Technician
-
Aug 2001 - Apr 2003
plan operation area of1. Propylene 2. debutanizer3. methanator for hydrogen plant 4. hydrogen pyrolisis gasoline HPG unit5. Routine process parameter monitoring and reading 6. Trouble shooting on process area problem and assist technical executive.7. As a first line crew during an emergency such as fire, gas leak etc.8. Do preparation for confine space entry. Gas test before working in confine space etc. plan operation area of1. Propylene 2. debutanizer3. methanator for hydrogen plant 4. hydrogen pyrolisis gasoline HPG unit5. Routine process parameter monitoring and reading 6. Trouble shooting on process area problem and assist technical executive.7. As a first line crew during an emergency such as fire, gas leak etc.8. Do preparation for confine space entry. Gas test before working in confine space etc.
-
-
Education
-
University Technology of Malaysia (UTM), BATC Sepang
Executive Diploma In Occupational Safety And Health, Occupational Safety and Health Technology/Technician -
Universiti Teknologi Malaysia (UTM),Kuala Lumpur
Diploma in Mechanical Engineering, Mechanical Engineering