Subramanian Krishnan

Mechanical Project Manager at Al Suwaidi Industrial Services Company
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Jeddah, Makkah, Saudi Arabia, SA

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Saudi Arabia
    • Oil and Gas
    • 200 - 300 Employee
    • Mechanical Project Manager
      • Jan 2020 - Present

      Maintenance contract as Project manager. Bidding for various Maintenance Turn Around/ Shut down projects. Execution of the projects efficiently with good profitability. Hot tapping of the existing live steam condensate line. Cold cutting of existing fuel gas line, crude oil line & provided the tie in & continued the line to the terminal point Preparation for 2022 shut down in PRC Job Maps, arrangement of resources, Manpower, tools. Installation of chemical dosing container, Transformer, related piping, electrical cabling, etc. Handled the GRE piping project for 1.7 kmPROPYLENE OXIDE 2019 TURN AROUND as Project manager. Worked in the execution team as POX shut down in PRC Column trays opening, cleaning, replacement, damaged trays repair box up de blinding. Fin Fan Coolers Hydro jet cleaning, opening of plug, box up Hydro test de blinding. Demister removal /cleaning repair box up de blinding in Drums(inhibitor, surge, Knock out, storage drums) Vessels Blinding, cleaning, inspection, box up/ de blinding Sample coolers 14 nos / filters/ purifiers cleaning inspection / box up. Exchangers Blinding, opening cover head, inspection, Hydro jetting cleaning , inspection, Hydro test, Box up , Deblinding Show less

    • Mechanical Project Manager
      • Nov 2019 - Jan 2020

       Worked in the execution team as crude area leader & got an award from the Saudi Aramco director for outstanding performance. Crude column trays opening, cleaning, replacement, distributor pipe repair box up de blinding. Kerosene column/HDO column trays cleaning, opening, repair box up de blinding. Demister removal /cleaning repair box up de blinding in Drums(inhibitor, surge, Knock out, storage drums) Vessels Blinding, cleaning, inspection, box up/ de blinding (stabilizer, splitter receivers,). Strippers / filters/ purifiers cleaning inspection / box up. Show less

    • Project Manager

    • Saudi Arabia
    • Oil and Gas
    • 200 - 300 Employee
    • Mechanical Project Manager
      • Jan 2017 - Jan 2019

       Preparation of polymer shut down projects, Method of the statement, Job safety analysis.  Modification of 36” cooling water line, replacement of valves  Modification of flare line to header & related pipelines  Replacement of control valves in an old refinery, & modification of pipelines  Replacement of burner tips in an old refinery, & reassembling of the burner assembly.  Troubleshooting of pumps and repairing rectifying the issues.  Fabrications, modification, erection of new platforms, walkways & access ladders.  Negotiation with Subcontractors for the job finalization @ an optimum time & minimum cost.  Floating Head Exchanger bundle pulling jetting & cleaning, reinstatement, box up.  Maintaining cooling tower fans, pumps  Commissioning of liquid Nitrogen compressors Show less

    • Mechanical Project Engineer
      • Jul 2013 - Dec 2016

       To review the job in the notifications. To arrange required, materials, resources, drawings, schedule, execute and complete the job within the specified time. Daily run & maintain activities, short shut down jobs, Evergreen jobs, T/A preparation. To review the equipment drawing, to prepare the stock code for the required materials, To follow up with inventory planner, Buyer, Material expediter, and warehouse until the correct material reaches the warehouse/ plant. During turn around worked as a cell team planning engineer to execute the job with the available resources. Jobs executed during the T/A replacement of seals for MHI centrifugal compressor for CO2 services 160bar. In arranging spares/services/ for overhauling of Flow serve high-pressure centrifugal pump Ammonia services -225 bar. Stripper manway machining /testing/& replacement of internal spares. Reactor internal nozzle modification/exchangers/vessels/cleaning/ hydro jetting/ testing / box up Show less

    • Mechanical Project Engineer
      • Jul 2013 - Dec 2016

       To review the job in the notifications. To arrange required, materials, resources, drawings, schedule, execute and complete the job within the specified time. Daily run & maintain activities, short shut down jobs, Evergreen jobs, T/A preparation. To review the equipment drawing, to prepare the stock code for the required materials, To follow up with inventory planner, Buyer, Material expediter, and warehouse until the correct material reaches the warehouse/ plant. During turn around worked as a cell team planning engineer to execute the job with the available resources. Jobs executed during the T/A replacement of seals for MHI centrifugal compressor for CO2 services 160bar. In arranging spares/services/ for overhauling of Flow serve high-pressure centrifugal pump Ammonia services -225 bar. Stripper manway machining /testing/& replacement of internal spares. Reactor internal nozzle modification/exchangers/vessels/cleaning/ hydro jetting/ testing / box up Show less

    • Saudi Arabia
    • Oil and Gas
    • 200 - 300 Employee
    • Mechanical Project Engineer
      • Nov 2006 - Jul 2013

       Daily Run & Maintain activities in the central maintenance department.  Overhauling of rotating & stationary equipment, and safety valves.  Fabrication of pipe spools of all kinds of materials like cs, ss, monel nickel, Inconel & Hast alloy, Titanium & combination of the above said by using GTAW/MIG/SMAW.  Involved in MTBE T/A 2010. Fabrication & repair of reactor internals.  Repair & maintenance of all kinds of pipe line2  Repair & maintenance of compressors, pumps & safety valves.  Involved in styrene T/A 2011  Repair & maintenance of pipes, vessels, columns, exchangers  Replacement of heater tubes  Involved in ethylene furnace repair replacement of tubes  Repair of the furnace shell  Involved in EDC T/A 2011  Involved in the repair of incinerators, exchangers, centrifuges, and pumps.  Involved in all kinds of materials cs, ss, monel nickel, Inconel & Hast alloy, Titanium in this T/A.  Involved in the repair of several tanks.  Involved in MTBE T/A 2012, Fabrication of grids & Supports for reactor/ regenerator.  Involved in EDC T/A 2013 T/A. Show less

    • India
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Mechanical Project Engineer
      • Nov 1997 - Nov 2006

       CLIENT: Neyveli Lignite Corporation, First Thermal Expansion 2x210 MW.  Involved in Structural Erections for various plants and Industries.  Involved in Erection, Commissioning, and maintenance of Rotary Equipment like high-pressure positive displacements Pumps, Screw pumps, etc.  Involved in various kinds of rotary Equipment alignments.  Low pressure and high-pressure heaters in both the units.  Chemical cleaning, steam flushing & purging of the systems.  Hydraulic pressure test for the above said units. Show less

    • Singapore
    • Construction
    • 500 - 600 Employee
    • Mechanical Project Engineer
      • Mar 1997 - Sep 1997

       Main Contractor: MITSUBISHI HEAVY INDUSTRIES (NAGASAKI), CLIENT: Electricity Generating Authority of Thailand (Wang Noi 707 MW combined Cycle power plant stage II contract ). In stack insulation, erection, and welding of the whole system. In hydraulic flushing, and pressure test for the related piping to the exhaust system. In the erection of HRSG (heat recovery steam generator, boiler piping, fit-up, Inspection, and welding. In the erection of IP drum and LP drum collectors and their related pipes. In the erection of HP, IP, LP, feedwater pipes, and condensate feed water pipes Show less

    • Mechanical Engineer
      • Jun 1995 - Mar 1997

       Station Stage III Development (3X250 MW Reheat Steam Turbine Generators & Auxiliary Equipment’s Contract). Monitoring and Resolving Mechanical Parameters like Vibration, Expansion & Eccentricity of various Rotating Equipment like Condensate Booster Plumps, Boiler Feed Pumps and various other Drives and Safety & Relief Valves. Comprehensive Maintenance and Servicing of all types of Valves like Safety Valves. Non-Return Valves, Intercept Valves, Emergency Stop Valves, and Relief Valves of both the High Pressure (480 bar) and Low Pressure (less than 200 bar ) Types with Gate Sizes up to 830mm for Various Applications. Periodic Overhauling of High Capacity, High-Pressure Positive Displacement, and other Types of Pumps used in Power Plant Applications to Specific Requirements, and Failure Analysis and preventive Action follow up. Preparation of Maintenance Procedures, Time Schedules, and Work Allocation Schedules in live With PERT & CPM Methods for Effective Utilization of Machine and Manpower. Show less

    • India
    • Electrical Equipment Manufacturing
    • 1 - 100 Employee
    • Mechanical Engineer
      • Aug 1994 - Jun 1995

       Involved in the Erection of Reactor Vessels (Stainless Steel, Carbon Steel, Rubber lined).  Heat Exchangers, Centrifugal Pumps Various Types of Valves, Vacuum pumps, Blowers and Pipelines (MS, SS, Rubber lined, PVC, HPD), etc.,  Erection of the Utilities Plant consisting of 20 t/hr Oil Fired, Water Tube Package Boiler, Air Compressor, Chilled Water Plant, Water Treatment Plant, Diesel Generator Set, Nitrogen Plant, Cooling, Tower, etc  Involved in the Erection of Reactor Vessels (Stainless Steel, Carbon Steel, Rubber lined).  Heat Exchangers, Centrifugal Pumps Various Types of Valves, Vacuum pumps, Blowers and Pipelines (MS, SS, Rubber lined, PVC, HPD), etc.,  Erection of the Utilities Plant consisting of 20 t/hr Oil Fired, Water Tube Package Boiler, Air Compressor, Chilled Water Plant, Water Treatment Plant, Diesel Generator Set, Nitrogen Plant, Cooling, Tower, etc

  • Safy International riyadh
    • Riyadh, Saudi Arabia
    • Mechanical Engineer
      • Jan 1992 - Jul 1994

       Commissioning and maintenance of 2 units of Package Boilers for Steam Generation up to 15 tons/hour at 200ɨ C for Degreasing, Pickling, and Drying Application of Tannery Products- Modification of Igniters Systems for Steam Atomized Oil Firing (HSD).  Erection, Commissioning and Maintenance of Automated Effluent Plant-Metito make, used with a capacity of 1.00 lakh liters a day for Reduction of Tannery Effluents to Non-Toxic levels – Modification of Dosing units for Constant/Specified levels of Acid/Alkali Blends to  Achieve Cost-Effective and Faster Operation.  Interfacing Erection and Commissioning between the Above Two Systems which  Includes Water Pipe Lines, Steam Pipe Lines, and Purge Systems. Show less

    • Mechanical Engineer
      • Dec 1989 - Jan 1992

       Procurement of Materials like pipes, Castings, Shafts, Motors, Pulleys, V-Belts, Bearings, Gear Box, Sprocket, Chains, Bolts, Fasteners, Structural Materials like ‘I’ Beam Channels, Tubular Pipes, Angles, etc.,  Effective Utilization of Manpower and Machinery.  Maintenance of the above Machinery and Supply of Spares as per Customers Request.  Marketing Sales, Promotion, and Accounting Activities with Respect to the Above  Manufactured products.  Procurement of Materials like pipes, Castings, Shafts, Motors, Pulleys, V-Belts, Bearings, Gear Box, Sprocket, Chains, Bolts, Fasteners, Structural Materials like ‘I’ Beam Channels, Tubular Pipes, Angles, etc.,  Effective Utilization of Manpower and Machinery.  Maintenance of the above Machinery and Supply of Spares as per Customers Request.  Marketing Sales, Promotion, and Accounting Activities with Respect to the Above  Manufactured products.

Education

  • Annamalai University
    Master of Business Administration - MBA, Business Administration and Management, General
    2003 - 2005
  • Annamalai University
    Bachelor's degree, Mechanical Engineering
    1998 - 2001

Community

You need to have a working account to view this content. Click here to join now