Subham Phakre
Student Coordinator at Cultural committee at National Institute of Industrial Engineering- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Elementary proficiency
-
Hindi Elementary proficiency
Topline Score
Bio
Credentials
-
Excel Supply Chain Analysis: Solving Inventory Problems
LinkedInJun, 2021- Oct, 2024 -
Power BI: Dashboards for Beginners
LinkedInJun, 2021- Oct, 2024 -
Introduction to Programming Using Python
CourseraDec, 2020- Oct, 2024 -
MS Excel
CourseraOct, 2020- Oct, 2024 -
Solid Works
Indo-German Tool RoomApr, 2016- Oct, 2024 -
Lean Six Sigma Green Belt Certification
Udemy
Experience
-
Indian Institute of Management Mumbai
-
India
-
Higher Education
-
200 - 300 Employee
-
Student Coordinator at Cultural committee
-
Nov 2020 - Present
-
-
-
Vedanta Resources Limited
-
United Kingdom
-
Mining
-
700 & Above Employee
-
Procurement Manager
-
Jun 2021 - Jul 2021
[] Identified the various Qualitative and Quantitative parameters considered for the selection of vendors[] Recommended New additional Selection Criteria for the effective and efficient vendor selection process[] Successful vendor selection using Fuzzy AHP & Fuzzy TOPSIS models based on all the chosen criteria[] Goal Programming Model to strategically decide the quantities to be procured from the selected vendor [] Identified the various Qualitative and Quantitative parameters considered for the selection of vendors[] Recommended New additional Selection Criteria for the effective and efficient vendor selection process[] Successful vendor selection using Fuzzy AHP & Fuzzy TOPSIS models based on all the chosen criteria[] Goal Programming Model to strategically decide the quantities to be procured from the selected vendor
-
-
-
Outlook Publishing (India) Pvt. Ltd.
-
Media Production
-
700 & Above Employee
-
Supply Chain Management Intern
-
Apr 2021 - Jun 2021
[] Employed ARIMA ML Algorithm using python to forecast the regional demand of 5 different SKU's[] Conducted ABC-XYZ analysis to classify 400+ SKUs to optimize stock levels and better asset utilization[] Developed a Dynamic lot-sizing model for defining optimum ordering qty to decrease the total inventory cost[] Collaborate closely with sales manager & demand planners for solution design, development, and deployment[] Built a Dashboard on Power BI to facilitate Real-time Inventory visibility & Decision support tools.
-
-
-
CUBE LOGISTICS LIMITED
-
United Kingdom
-
1 - 100 Employee
-
Logistics Intern
-
Dec 2020 - Jan 2021
[] Observed the business process re-engineering with the implementation of SAP TMS with Telematic program[] Benchmarked various forecasting models to estimate actual customer demand and predicted the accuracy[] Identified demand deviation between hub and prepared adherence graph to find out business opportunities[] Developed the Excel-based model for identifying the route deviation of the 52 trucks, scheduled for MPOs [] Observed the business process re-engineering with the implementation of SAP TMS with Telematic program[] Benchmarked various forecasting models to estimate actual customer demand and predicted the accuracy[] Identified demand deviation between hub and prepared adherence graph to find out business opportunities[] Developed the Excel-based model for identifying the route deviation of the 52 trucks, scheduled for MPOs
-
-
-
CNH Industrial
-
Machinery Manufacturing
-
700 & Above Employee
-
Quality Assurance Intern
-
Apr 2017 - Jun 2017
[] Worked on Quality assurance and Quality control techniques. [] Applied Quality Gates at the entrance of materials and Ensured Tracking of defects.[] Tracked the plant's Performance in six spheres of Safety, Quality, Delivery, Cost, Morale, and Environment.[] Used PRR system to resolve various issues concerning the components supplied by third-party vendors.[] Implemented dimensional inspection for hose pipe connector and ensured timely updation of Quality gates.[] Demonstrated the use of Kaizen for Increasing productivity and reducing waste on the work floor. [] Proposed the application of Poka-Yoke to limit the existing work floor mistakes and inefficient practices.
-
-
-
Vehicle Factory Jabalpur
-
1 - 100 Employee
-
Summer Trainee
-
May 2016 - Jun 2016
[] Worked on the Production line.[] Understand the different aspects of the Production plant. [] Worked on the Production line.[] Understand the different aspects of the Production plant.
-
-
-
BAJA SAEINDIA
-
India
-
Industrial Machinery Manufacturing
-
1 - 100 Employee
-
Team Transmission
-
Mar 2015 - Jun 2016
[] Transmission team lead, managed the working of the team on the shop floor.[] Built drive train compatible with a CVT and has lighter weight.[] Customized gearbox along with the Mahindra alpha differential to the output of CVT. [] Transmission team lead, managed the working of the team on the shop floor.[] Built drive train compatible with a CVT and has lighter weight.[] Customized gearbox along with the Mahindra alpha differential to the output of CVT.
-
-
Education
-
National Institute of Industrial Engineering
Master of Business Administration - MBA, Operations and Supply chain management -
Institute of Engineering & Technology DAVV, Indore
Bachelor of Engineering, Mechanical Engineering -
Kendriya Vidyalaya
HIGHER SECONDARY EDUCATION