Steve WEILER

Project Manager at DeltaX
  • Claim this Profile
Online Presence
Contact Information
Location
Seoul Incheon Metropolitan Area, KR

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • South Korea
    • IT Services and IT Consulting
    • 1 - 100 Employee
    • Project Manager
      • Dec 2022 - Present
    • Operations Manager
      • Feb 2021 - Aug 2022
    • South Korea
    • Defense and Space Manufacturing
    • 1 - 100 Employee
    • Project Manager
      • Nov 2019 - Jan 2021

      Development of the LiFi Cabin System, the next generation of in-flight communication system. LiFi is a new technology that uses light-emitting diodes (LEDs) for data transmission, as opposed to WiFi, which uses radio waves. LiFi is fast: it enables a superior onboard connectivity experience in terms of bandwidth, latency and stability. LiFi is safe: it is electromagnetic interferences free so it doesn’t interfere with sensitive airplane instruments and doesn’t affect passengers’ health. LiFi is green: with his copperless architecture, it reduces the airplane's weight and fuel usage. + Project definition through scope of work, development schedule and budget estimation. + Business case analysis and forecast, + Coordination of resources from various functional departments to streamline project efficiency (with implementation of collaboration tool practices), + Close monitoring of the R&D and tasks assignment, + Analysis of project progress and, when necessary, adaptation of scope and timelines, + Reporting of project outcomes and flag of potential risks (with mitigation plan), + Customer relationships management, providing day-to-day contact on project status and changes. Show less

    • South Korea
    • Computers and Electronics Manufacturing
    • 700 & Above Employee
    • Project Manager
      • May 2017 - Jan 2019

      Development of the Multimedia and Navigation system of Renault cars, R-Link 2. System integrated on the 6 main vehicles of the manufacturer. Volume of 500,000 units/year (Wordwide). + Definition of specifications (software and hardware) - close follow up with engineering teams, + Schedule and monitoring of the project (and its 5 sub-projects), + Management of Tier 2 suppliers, + Communication and reporting to the OEM through regular meetings (webconf & face-to-face). Development of the Multimedia and Navigation system of Renault cars, R-Link 2. System integrated on the 6 main vehicles of the manufacturer. Volume of 500,000 units/year (Wordwide). + Definition of specifications (software and hardware) - close follow up with engineering teams, + Schedule and monitoring of the project (and its 5 sub-projects), + Management of Tier 2 suppliers, + Communication and reporting to the OEM through regular meetings (webconf & face-to-face).

    • Systems and Networks Engineer
      • May 2015 - May 2017

      Lead engineer in charge of high profile customers and foreign companies relocating to South Korea. + Remote and on-site support, + Installation and configuration of network equipment (switches, routers, AP...), + Design and implementation of architectures (LAN and WAN), + Management of complex projects (relocation of offices, coordination with teams abroad...). Lead engineer in charge of high profile customers and foreign companies relocating to South Korea. + Remote and on-site support, + Installation and configuration of network equipment (switches, routers, AP...), + Design and implementation of architectures (LAN and WAN), + Management of complex projects (relocation of offices, coordination with teams abroad...).

    • Telecommunications
    • 1 - 100 Employee
    • Project Manager
      • Nov 2011 - Aug 2012

      Main telecom contractor for the French government. Provider of over 180,000 devices. + Managed the production team and the delivery schedule with suppliers, + Created new processes to improve the processing speed of customers’ requests, + Supported sales and marketing teams (promoted new devices and company-made apps), + First point of contact for the French government throughout the project, + Prepared graphic presentations/reports for clients on a weekly basis, + Actively participated in client meetings. Show less

    • Germany
    • International Trade and Development
    • 1 - 100 Employee
      • Jul 2010 - Sep 2011

      Deployment of video conference technology over the whole company (150 locations throughout France and overseas departments and territories).+ Roadmap project to be compliant with the Time To Market planning,+ Applied ISO 9001 (Quality Management) best practices to improve processes,+ Monitored technical interventions (remotely & on-site),+ Coordinated all teams and lead meetings.

      • Sep 2009 - Jul 2010

      Security advisor in charge of reducing virus threats in the office.Expert in TACACS+ (CISCO access control system).+ Published “Security of web apps: the 10 most important threats” guide,+ Published “Security of networks: introduction to the main threats” guide,+ Trained technicians on the basics of TACACS+ (AAA, privilege levels, activity logging...).

    • France
    • Software Development
    • Engineer in High Availability Systems
      • Sep 2008 - Sep 2009

      Building experience in high-availability systems and designing their infrastructure. Technology watch and testing of new products. + Set up a fail over cluster based on open source solutions (Linux, DRBD, Heartbeat), + Created a test lab environment to develop R&D activities, + Test and review of new products (software, hardware and appliances), + Published articles for the magazine “L’Informaticien” (computer scientist) on a monthly basis. Building experience in high-availability systems and designing their infrastructure. Technology watch and testing of new products. + Set up a fail over cluster based on open source solutions (Linux, DRBD, Heartbeat), + Created a test lab environment to develop R&D activities, + Test and review of new products (software, hardware and appliances), + Published articles for the magazine “L’Informaticien” (computer scientist) on a monthly basis.

    • Russian Federation
    • Advertising Services
    • 1 - 100 Employee
    • Network Administrator
      • Jan 2007 - Sep 2008

      Management of more than 70 workstations and servers network. In charge of bridging the network of the new office with the headquarters. + Managed the Active Directory (new accounts and groups, security policies), + Maintained, repaired and upgraded users workstations, + Installed a proxy to control, filter and secure Internet access as well as reduce virus threats, + Bridged both offices with a site-to-site VPN connection, encrypted to secure communications. Management of more than 70 workstations and servers network. In charge of bridging the network of the new office with the headquarters. + Managed the Active Directory (new accounts and groups, security policies), + Maintained, repaired and upgraded users workstations, + Installed a proxy to control, filter and secure Internet access as well as reduce virus threats, + Bridged both offices with a site-to-site VPN connection, encrypted to secure communications.

Education

  • Sogang University
    Korean Language - level 1
    2012 - 2012
  • CCI Val d'Oise - Yvelines (ITIN) et CCI Seine et Marne (UTEC)
    Master M2IRT, Manager in Engineering of IT, Networks and Telecoms
    2008 - 2011
  • Université Paris-Est Marne-la-Vallée (IFIS)
    Master MQSE, Management of Quality Security and Environment (option: provision of IT services)
    2008 - 2011
  • ITIC Paris
    BTS IG, Data Processing applied to Management (option: Network Administrator)
    2007 - 2008

Community

You need to have a working account to view this content. Click here to join now