Steven Howie

Technical Supervisor and Quality Control at SMart Projex & SMart Build
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Greater Preston Area, UK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Kingdom
    • Electric Power Transmission, Control, and Distribution
    • 1 - 100 Employee
    • Technical Supervisor and Quality Control
      • Sep 2021 - Present

      Hornsea 2, Hywind Tampen and Arcadis Ost 1 Hornsea 2, Hywind Tampen and Arcadis Ost 1

    • United Kingdom
    • Renewable Energy Semiconductor Manufacturing
    • 100 - 200 Employee
    • HV Jointer/Tester and Team Lead, Kincardine Floating OWF
      • Jul 2021 - Aug 2021

    • Test and Termination Supervisor
      • Mar 2021 - Jun 2021

      Greater Changhua OSS 1 & 2

    • United Kingdom
    • Oil and Gas
    • 300 - 400 Employee
    • Technical Supervisor and DOIM
      • Nov 2016 - Feb 2021

      Projects I have completed with JDR are, Veja Mate, Racebank, Beatrice, Hornsea 1, Seamade and Moray East. My role has progressed from a working supervisor, where I would run my own termination team and carry out the day to day running of projects and welfare of technicians, to full time supervision as Deputy Offshore Installation Manager. The position of DOIM involves me with all aspects of the project from pre-mobilisation planning, mock-ups, procedure review and alterations, equipment requirements, daily planning meetings and organising of teams, daily reporting of activities and preparing of as built documentation for the client. Show less

    • Sweden
    • Utilities
    • 700 & Above Employee
    • Test and Termination Supervisor/Client Representative
      • Aug 2020 - Oct 2020

    • Test and Termination Client Representative
      • Oct 2019 - Jan 2020

    • Sweden
    • Utilities
    • 700 & Above Employee
    • Client Respresentative
      • Mar 2018 - May 2018

      I acted as Client Representative for Vatenfall on the Aberdeen Bay Wind Farm overseeing the test and termination scope of the project. My duties included witnessing initial post lay testing of fibre optic cables and power cores, reconstruction of containment, routing and cleating of cables, termination activities, witnessing final testing and QC walk downs in preparation for hand over to client. I produced daily progress reports and sent them to Vattenfalls Project Management along with relevant photographs taken of all the critical elements of the installation. Show less

    • United Kingdom
    • Appliances, Electrical, and Electronics Manufacturing
    • 1 - 100 Employee
    • HV Cable Jointer/Team Leader
      • Jan 2016 - Nov 2016

    • United Kingdom
    • Electric Power Generation
    • 1 - 100 Employee
    • Electrical Field Engineer
      • Jun 2015 - Dec 2015

    • Norway
    • Renewable Energy Power Generation
    • 700 & Above Employee
    • Electrical Field Engineer
      • May 2014 - Apr 2015

      The Electrical Field Engineer coordinates the daily operations executed by and onboard the Installation Support Vessel (ISV). The team onboard the ISV manages the operations of electrical installation of cables at the wind turbines. Main areas of responsibilities as field engineer Offshore Prepare project specific drawings, procedures (e.g. installation procedures, task risk assessment, work methods, etc.); for the projects and tenders; Warrant that the engineering procedures / plans comply with contractual- industry- and local requirements; Responsible for the coordination of the pull-in, testing and termination of power cables executed on the wind turbines liaising with the (Ass.)Offshore Manager; Responsible for the co-ordination and execution of project site activities liaising with the (Ass) Offshore Manager and subcontractors on site; Ensure compliance with relevant project procedures; Coordinate mobilization and use of project specific third party hired equipment onboard; Conduct tool box talks and as applicable Job Safety Analysis in accordance with project plans, maintaining communication with all parties in the event that any procedures or operating conditions change, endorsing pre-work checklists and site Prepare and arrange for all administrative tasks on project base, as required. Participate in onshore jobs as part of the operations and engineering team in the function of Project Engineer; Show less

    • HV Cable Jointer/Team Leader
      • Oct 2010 - May 2014

      Working on Greater Gabbard, Sheringham Shoal, Lincs, GT1 and Gwynt Y Mor wind farms as a 33kV Jointer and team leader. Completing full tower and sub station installs, including array terminations, transformer tail terminations, all aspects of HV testing, containment and QC walkdowns. I also worked on the export cable for Rhyl flats wind farm to repair a fault and was part of a jointing team that completed sub sea 132kV joints for Gywynt Y Mor. Working on Greater Gabbard, Sheringham Shoal, Lincs, GT1 and Gwynt Y Mor wind farms as a 33kV Jointer and team leader. Completing full tower and sub station installs, including array terminations, transformer tail terminations, all aspects of HV testing, containment and QC walkdowns. I also worked on the export cable for Rhyl flats wind farm to repair a fault and was part of a jointing team that completed sub sea 132kV joints for Gywynt Y Mor.

    • HV Jointer/ Team leader
      • Oct 2009 - Oct 2010

      Working on private networks installing HV and LV electrical systems. Working on private networks installing HV and LV electrical systems.

    • HV Jointer/Team leader
      • Feb 2007 - Oct 2009

      Installation of complete electricity networks on new sites, including substations, domestic and commercial services, street lighting and site supplies. LV and HV. Installation of complete electricity networks on new sites, including substations, domestic and commercial services, street lighting and site supplies. LV and HV.

    • HV Cable Jointer at Morrison Utilities, Scottish Power and Core Utilities.
      • Jan 2004 - Feb 2007

    • HV Cable Jointer/ Overhead Linesman
      • Oct 2002 - Jan 2004

    • Apprentice cable jointer/ overhead linesman
      • Sep 1998 - Sep 2002

Education

  • Cardinal Newman College
    A-levels, Mathematics, Physics, Biology
    1995 - 1997
  • Kirkham Grammar School
    GCSE's
    1990 - 1995

Community

You need to have a working account to view this content. Click here to join now