Steve Hammond

Chief Engineering Officer at Dillistone Group Plc
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
UK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Ramin Zarghany

In my role as a Software Developer at ISV, I've been working alongside Steve whose responsibilities included leading projects through the whole project life cycle including; requirements gathering, design, development and testing. I learned and still learning a lot from him, he is very technical and knowledgeable with what he does in both Programing/Networking and Management side of things.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Kingdom
    • Software Development
    • 1 - 100 Employee
    • Chief Engineering Officer
      • Jan 2021 - Present
    • United Kingdom
    • Software Development
    • 1 - 100 Employee
    • Director Of Information Technology
      • Jan 2020 - Present
    • Director Of Software Development
      • Jan 2017 - Jan 2020

      Directly responsible for DevOps and Development teams. Required significant process changes throughout the whole organisation transitioning from a waterfall approach to an agile approach with more visibility and transparency. I also drove significant optimisation throughout the whole development and transformational deployment processes from several stand-alone applications to Azure hosted SaaS solutions. Directly responsible for DevOps and Development teams. Required significant process changes throughout the whole organisation transitioning from a waterfall approach to an agile approach with more visibility and transparency. I also drove significant optimisation throughout the whole development and transformational deployment processes from several stand-alone applications to Azure hosted SaaS solutions.

    • United Kingdom
    • Software Development
    • 1 - 100 Employee
    • Director Of Technology
      • Apr 2006 - Jan 2020

      This is a continuation (of sorts) of my previous role, after the business expanded though venture capitalist backed investments failed, I was part of a bid to buy the business as a going concern from Administrators. After successfully achieving, this my role changed from a hands-on senior software architect to a director responsible for all technology – software, infrastructure, product, and support. I successfully lead the business from a technical aspect and in 2014 was instrumental to a… Show more This is a continuation (of sorts) of my previous role, after the business expanded though venture capitalist backed investments failed, I was part of a bid to buy the business as a going concern from Administrators. After successfully achieving, this my role changed from a hands-on senior software architect to a director responsible for all technology – software, infrastructure, product, and support. I successfully lead the business from a technical aspect and in 2014 was instrumental to a achieving acquisition by an AIM listed PLC

    • Senior Software Architect
      • Jul 2001 - Apr 2006

    • Software Engineer
      • Jun 1999 - Jul 2001

      I joined the development team in 1999 as a developer working on Windows development, multimedia development and eventually was a key in a transition converting older applications to the web

    • Network Engineer
      • Jun 1998 - Dec 1999

      A network engineer providing remote and on-site support, setup and configuration of existing and new installations A network engineer providing remote and on-site support, setup and configuration of existing and new installations

    • Netherlands
    • Chemical Manufacturing
    • 700 & Above Employee
    • IT Contractor
      • Jan 1999 - Jun 1999

      A 6-month contract to design and implement network topology transition from Novel Netware and token ring to Windows Server and Ethernet. During the process I was liaising with both internal IT and external IT support providers A 6-month contract to design and implement network topology transition from Novel Netware and token ring to Windows Server and Ethernet. During the process I was liaising with both internal IT and external IT support providers

Community

You need to have a working account to view this content. Click here to join now