Steve Rossetta

Senior Project Manager at AT-PD | Advanced Technology Project Delivery
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
San Jose, California, United States, US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Business Consulting and Services
    • 1 - 100 Employee
    • Senior Project Manager
      • Jul 2008 - Present

      • Seagate Technology, LLC – California - Provided project management and oversight of design, construction, and tool fit-up of the LEED Gold Fremont media R&D site. The facility utilizes state of the art water reclamation, lighting control and harvesting system, 1.0 megawatt PV, and new BAS. This 450,000 SF facility includes offices, labs, warehouse, prototype manufacturing, and includes classified clean rooms on a custom raised floor. • Apple Inc., California - Design and project/ construction management services for a 21,000 SF central plant, and 33,000 SF utility yard to retrofit the live data center with the addition of six 2MW generators, 9,600-tons cooling, configured in N+1, with storage capacity for 48-hours; redundant controls, and integrated BacNet BMS Monitoring, energy reduction/ and water conservation features included passive water, non-chemical CHW treatment; single ply roofing, hot aisle containment, tiered temperature monitoring allowing load based fan loading/ shedding; LED lighting, ultra-high efficiency chillers. • VMware, Washington, Tier-3 Upgrade - Turnkey of $2.3 M upgrade of existing facility to Tier III, addition of UPS and 2.0 Mg generator to bring 5 MW to 20,0000 SF data center to Tier III reliability. • VMware, California Colocation Build Turnkey - Design and construction management for $1.4 M. tenant improvement of a 5,000 SF colocation facility. Included electrical distribution and technology infrastructure for 80 cabinets. High density deployment with design to 21 kW per rack. 1.2 MW total. • VMware, California - Preconstruction services for the for a Tier-3-compliant Data Center planned for 1,000 kW, in-row cooling solution, expected average PUE for this facility was 1.55. • Additional Projects: VMWare Pod 1 & 2; Preconstruction Services, WA.; Stion Corporation, CA Turnkey services for 4000A service upgrade; DataPipe, Power Utilization Study; CA.; Symantec, Phase 4; Preconstruction Services, AZ.; Advantest, CA.. Show less

Education

  • San Jose State University
    Certificate, Construction Management
    1997 - 2000

Community

You need to have a working account to view this content. Click here to join now