Steve Nnorom

Project Manager - AKK at Oilserv Limited
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Nigeria, NG

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Howard John Cleave

Steve is a highly competent professional with broad experience managing both onshore and offshore oil and gas projects. He is both technically and commercially astute, and a strong leader and team player.

Tosin Jolaoye

Steve mentored me. He is a team player any day any day. Highly focused and result driven.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Nigeria
    • Oil and Gas
    • 200 - 300 Employee
    • Project Manager - AKK
      • Oct 2021 - Present

    • Nigeria
    • Oil and Gas
    • 1 - 100 Employee
    • Project Manager
      • Nov 2018 - Sep 2021

    • Nigeria
    • Oil and Gas
    • 200 - 300 Employee
    • Project Manager
      • Aug 2018 - Oct 2018

    • General Manager - Projects
      • Jan 2018 - Jul 2018

    • Project Manager
      • Aug 2017 - Jan 2018

    • Nigeria
    • Oil and Gas
    • 400 - 500 Employee
    • Project Manager
      • Jun 2016 - Jul 2017

    • Virgin Islands, British
    • Oil and Gas
    • 200 - 300 Employee
    • Project Manager
      • Feb 2011 - May 2016

      SPECIFIC FUNCTIONAL ACTIVITIES: • Effectively manages Contracts with Client to ensure compliance and execution, communicating effectively with appropriate internal departments (Legal/Contracts) to accomplish objectives. • Proactively plans for unpredictable scenarios (back-up plans in place); anticipates future challenges; engages legal, risk management departments when needed. • Develops and maintains productive Client relationships, responding to the Client in a timely manner and communicating realistic expectations to the Client for Project outcomes. • Develops Project work budget with estimate and scope. • Manages cash flow on weekly/monthly basis with Accounting Staff. • Creates and maintains a Project Schedule as a tool to determine critical path items. • Implements Client Safety and Quality Control System a first priority. • Manages Human resources involved in the Project to build a highly competent Project Team. • Manages costs so that the Project is performed at the minimum practical cost and within budget. Show less

    • Oil and Gas
    • 300 - 400 Employee
    • Assistant Project Manager
      • Jul 2010 - Jan 2011

      PRIMARY DUTIES AND RESPONSIBLITES:Assistance to Project Manager with Contract Administration.a. Ensures all project procedures are available on board the barge and that barge is familiar with these documents’ requirements.b. Monitors WAV’s performance vs. Contract and assists Project Manager in ensuring compliance.c. Monitors Client’s performance vs. contract and assists Project Manager in ensuring compliance.d. Supervises Field Engineers offshore and monitors Daily Job Report (DJR) to ensure that work times, WBS codes, material usage, and any activities affecting barge performance are being accurately recorded.e. Monitors the performance of construction activities vs. the project schedule, investigates deviations, and reports any sequence changes or observed discrepancies.f. Identifies technical changes to the project scope of work and advises and assists Project Manager with the preparation of change orders or deviation requests from the client. j. Conducts post job analysis and assists Project Manager with development of “lessons learned and project closeout reports. Show less

    • Senior Project Engineer
      • Jul 2009 - Jun 2010

      PRIMARY DUTIES AND RESPONSIBLITES: a. Prepares Engineering Requests, Technical Queries etc. b. Liaises with WAV engineering and Subcontractors to ensure timely delivery of reports, calculations, drawings and other required technical documents for the project.c. Reviews reports, calculations, drawings and other technical documents to ensure accuracy, completeness, and applicability to the project requirements and compatibility with the equipment to be utilized on the project.d. Provides technical liaison with the Client and supervises incorporation of Client comments into technical deliverables. e. Technical Lead For Project.f. Ensures errors and discrepancies in drawings and specifications are reported and resolved by the appropriate authority when discovered. g. Maintains familiarity with equipment operating capabilities to include cranes, davits, stinger, hammers, pipe handling faculties, welding equipment, coating equipment, testing instrumentation, anchor wire and pipeline tension monitoring devices, and ensures that procedures and technical requirements are within the capability of the equipment to be used.i. Coordinates development of quality plans, ITP’s, and other quality related documents with WAV’s QA/QC department.j. Monitors and ensures compliance with project drawings, specifications, and procedures during offshore activities.k. Supervises Field Engineers in the preparation of technical and operating documentation and procedures.l. Supervises Field Engineers in the preparation of load out lists, and the load out and transportation of materials, consumables, and fabricated components to the offshore work site.m. Supervises and coordinates activities of Field Engineers providing offshore support to construction personnel on the equipment spreads. n. Supervises preparation of “as-built” drawings and compilation of project data books. Show less

    • Project Engineer
      • Dec 2007 - Jun 2009

      PRIMARY DUTIES AND RESPONSIBLITES: (a) Preparation of Specific Work Procedures. (b) Preparation of Installation Procedures before mobilization to site. (c) Material Control on Site. (d) Contract Management on Site. (e) Barge mobilization. (f) Managing Sub-Contractors & Clients. (g) Generating As-Built Documentation. (h) Daily Work Progress Reporting & Documentation. (i) Preparation of Detailed Fabrication Drawings. (j) Allocation of resources (manpower, tools and materials) to site activities. (k) Material Take-Off Estimation. (l) Supervision of pipeline flushing and purging Activities. (m) Test Engineer during pipeline Hydrotesting. (n) Maintain liaison with Client throughout Project duration. (o) Company Representative on pipeline Pre-lay and post-lay survey activities. (p) Overall Work Site Administration. (q) Assists Project Manager in the planning, Mobilization, execution & planning of the Project. (r) Provides technical liaison with Clients & Supervises the incorporation of Client’s Comments into technical deliverables. (s) Reviews & approves plans & procedures For accuracy, appropriateness & Completeness. (t) Assists Project Manager in the development Of Project Budget and Manpower Requirements. (u) Reports to the Project Manager etc. Show less

    • Senior Structural/Pipeline CAD Engineer
      • Aug 2007 - Dec 2007

      PRIMARY DUTIES AND RESPONSIBLITES: (a) Team Leader – Co-ordinates Drafting. (b) Preparation of Detailed Design/CAD Procedures of Oceon/Acergy Standard Design for Construction and Operational Applications in the following areas : PIPELAYING PROCEDURES,PLATFORM METHODS/INSTALLATION PROCEDURES,LIFTING/DISMANTLING METHODS/PROCEDURES,JACKET/DECK FABRICATION PROCEDURES AND OTHER OIL FACILITIES IN AREAS OF PIPING,ELECTRICAL,MECHANICAL,CIVIL,STRUCTURAL AND ARCHITECTURAL DESIGNS. (c) Making Structural fabrication drawings. (d) Structural CAD Modelling using Autodesk Inventor Software. (e) Interpretes Drafting Work Specifications & Establishment of Drafting Work Execution Plan. (f) Reports to the Project Manager. (g) Ensure over-all supervision and proper application of Drafting Work Procedures. Show less

Education

  • Tekedia Institute
    Mini-MBA, Business Administration and Management, General
    2020 - 2020
  • University of Lagos
    Masters, Project Management
    2010 - 2012
  • Federal University of Technology Owerri
    Bachelor of Engineering, Civil Engineering
    1997 - 2002

Community

You need to have a working account to view this content. Click here to join now