HNC Electrical Engineering
Newport UniversityJan, 2011- Sep, 2024 -
City & Guild 236 Parts 1 and 2, Achievement Measurement 1 and 2, NVQ in Electrical Installations Level 3
City & Guilds -
City & Guilds 17th Edition Wiring and Regulations BS7671
City & Guilds -
CompEX National Certificate of Core Competence for working on electrical apparatus for use in potentially explosive atmospheres EX01-04 Gases
JTL -
CompEX National Certificate of Core Competence for working on electrical apparatus for use in potentially explosive atmospheres EX05-06 Dust
JTL -
IOSH Managing Safely
IOSH -
Medium Risk Confined Space T
MRS Training and Rescue (the new name for Mines Rescue Service)
Experience
-
BRC Reinforcement (UK) Ltd.
-
United Kingdom
-
Construction
-
1 - 100 Employee
-
Engineering Manager
-
Jan 2020 - Present
-
-
-
RWE Generation UK plc
-
United Kingdom
-
1 - 100 Employee
-
E, C & I Engineer
-
Apr 2019 - Jan 2020
- Providing Electrical assistance for both Aberthaw Coal fired Power Station & Markinch Biomass Combined Heat & Power Station as part of the solid fuel cluster. - DSEAR design and inspection - LV and HV Switchgear specification and contract initiation maintenance, overhaul and testing - LV and HV Motor Specification and contract initiation for maintenance and overhaul.- Project and Outage planning at both Aberthaw and Markinch Power Station.- Took an active role in managing, training and mentoring junior/graduate engineers through the outage period.- Completed The Inspire Programme (Leading self, team & organisation). Show less
-
-
Lead Material Handling Engineer (SECONDMENT)
-
Nov 2017 - Apr 2019
- Worked on material handling projects including rail infrastructure - managed budgets and contracts as well as specification writing for multiple contracts.- Planned major rail outage and created preservation document for the plant during ‘Summer cold period’.- Ensured coal is provided to the station and the removal of PFA and FBA by working closely with material handlings staff.- Oversaw the maintenance of the plant and machinery - liaised with both station and contractor maintenance teams to carry out preventative and corrective works.- Reviewed preventative maintenance schedules for business requirements. Show less
-
-
E,C & I ENGINEER
-
May 2012 - Nov 2017
- Managed and planned major and minor plant shutdowns for overhaul and upgrades.- Controlled budgets, including contracts for both maintenance and insurance inspections. - Managed maintenance policies and creating preventative maintenance routines from local procedures. - Provided support for both Engineering & Maintenance departments in diagnosing and solving plant issues.- Designed, installed and commissioned U9 LoNox Boiler conversion and the implementation continuous emissions monitoring equipment for both air and water, including maintenance. Show less
-
-
-
RSD Technology Ltd
-
United Kingdom
-
Industrial Automation
-
1 - 100 Employee
-
E, C & I ENGINEER
-
Nov 2007 - May 2012
-
-
-
INSTENG PROCESS AUTOMATION LIMITED
-
United Kingdom
-
E C & I ENGINEER
-
Jun 2007 - Nov 2007
-
-
-
-
Electrical Supervisor
-
2004 - 2007
-
-
-
PB Gelatins GmbH
-
Pharmaceutical Manufacturing
-
1 - 100 Employee
-
Maintenance Supervisor
-
1998 - 2004
-
-
-
-
Electrical Site Supervisor
-
1994 - 1998
-
-
-
-
Approved Electrician
-
1987 - 1993
-
-
Education
-