Steve Han

Rack and Cable Installer at UniTek Global Services
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Cupertino, California, United States, US
Languages
  • English -
  • Korean -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Telecommunications
    • 1 - 100 Employee
    • Rack and Cable Installer
      • Jan 2015 - Present

      Install cables (AC & DC Power, Optic Fiber and etc) and Lacing - Assemble and install Rack and other hardware Install cables (AC & DC Power, Optic Fiber and etc) and Lacing - Assemble and install Rack and other hardware

    • HVAC Install Technician
      • Jun 2014 - Aug 2014

    • Warehouse Technician
      • Jul 2013 - May 2014

    • Wholesale Building Materials
    • 1 - 100 Employee
    • Owner
      • Dec 2011 - Jun 2013

      Participate in Energy Saving Program of Sensor Switch from PG&E Participate in Energy Saving Program of Sensor Switch from PG&E

    • United States
    • Software Development
    • 1 - 100 Employee
    • Equipment Technician
      • Jun 2010 - Oct 2011

      Assembled CVD, PVD Chambers and Semiconductor Process Equipments. - Cooperated with Equipment Engineers to build Equipment “Endura” - Performed Inspection and Calibration of assembled parts. - Set up Power Generation Racks, Main AC, Gas Box and Others. - Performed Leak Check with RGA. - Performed Tier Zero at Customer’s Fab. Assembled CVD, PVD Chambers and Semiconductor Process Equipments. - Cooperated with Equipment Engineers to build Equipment “Endura” - Performed Inspection and Calibration of assembled parts. - Set up Power Generation Racks, Main AC, Gas Box and Others. - Performed Leak Check with RGA. - Performed Tier Zero at Customer’s Fab.

    • Application Engineer
      • Feb 2007 - Feb 2010

      Supported Sales Team for LCD Products on Engineering Issues. - Reviewed Customer Requirements and Product specifications for Design Solution. - Pre-analyzed Returned LCD Products and performed Troubleshooting. - Interfaced with Customers and Factories in Asia on Engineering Issues. - Maintained Web site. Supported Sales Team for LCD Products on Engineering Issues. - Reviewed Customer Requirements and Product specifications for Design Solution. - Pre-analyzed Returned LCD Products and performed Troubleshooting. - Interfaced with Customers and Factories in Asia on Engineering Issues. - Maintained Web site.

    • Application Engineer
      • Apr 2006 - Jan 2007

      Supported Sales Team for LCD Products on Engineering Issues. - Reviewed Customer Requirements and Product specifications. - Pre-analyzed Returned LCD Products and performed Troubleshooting. Supported Sales Team for LCD Products on Engineering Issues. - Reviewed Customer Requirements and Product specifications. - Pre-analyzed Returned LCD Products and performed Troubleshooting.

    • Application Engineer
      • Dec 2001 - Jun 2005

      2/2 - Interfaced with Customers and Factories in Asia on Engineering Issues.; Dispatched to USA Office to support Sales Team on Engineering Issues. - Reviewed Customer Requirements. - Pre-analyzed Returned LCD Products and performed Pre-Troubleshooting for timely Support. - Interfaced with Customers and Hyundai LCD Inc. in Korea. - Maintained and Updated Web site. * HEI became HYNIX Semiconductor, Inc. And LCD Division of HEI was spun off and became “Hyundai LCD, Inc.” (Jan 2002). Show less

    • LCM Senior Engineer
      • Jan 1990 - Nov 2001

      Cooperated with Sales Team and Production Team. - Researched and Evaluated Row Materials include Controller and Driver ICs. - Built BOM (Bills Of Materials). - Reviewed Customer Requirements and Finalized LCM Design Spec. - Participated Task Force Team to improve Production Yields.. - Developed Monochrome and Color LCMs for the various Applications like Cellular Phones, Hand Held Units, Medical Devices, Automotives, Office Supplies, and Others. - Created Component Designs for PCB, FPC, Backlight (LED, EL, CCFL), Touch Screen, LCD Panel, Cables, and Others and Evaluated. - Built and Evaluated LCM Proto-Engineering Samples. - Evaluated Raw Materials. - Integrated ICs with various packages like QFP, TCP, COG, and BGA. - Analyzed Returned LCM and Created Failure Analysis Reports. - Participated Task Force Team to improve Production Yields. - Created LCM Product Specification. - Trained Engineers and Technicians - Received Training of LCD Process, Machines, CAD, and Test Equipments. Show less

Education

  • HANYANG University
    B.S, Electronic Engineering

Community

You need to have a working account to view this content. Click here to join now