Steve Han
Rack and Cable Installer at UniTek Global Services- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English -
-
Korean -
Topline Score
Bio
Experience
-
UniTek Global Services
-
United States
-
Telecommunications
-
1 - 100 Employee
-
Rack and Cable Installer
-
Jan 2015 - Present
Install cables (AC & DC Power, Optic Fiber and etc) and Lacing - Assemble and install Rack and other hardware Install cables (AC & DC Power, Optic Fiber and etc) and Lacing - Assemble and install Rack and other hardware
-
-
-
-
HVAC Install Technician
-
Jun 2014 - Aug 2014
-
-
-
-
Warehouse Technician
-
Jul 2013 - May 2014
-
-
-
Stuart Paint & Supply dba SPS The Builder's Store
-
Wholesale Building Materials
-
1 - 100 Employee
-
Owner
-
Dec 2011 - Jun 2013
Participate in Energy Saving Program of Sensor Switch from PG&E Participate in Energy Saving Program of Sensor Switch from PG&E
-
-
-
Semicat Inc
-
United States
-
Software Development
-
1 - 100 Employee
-
Equipment Technician
-
Jun 2010 - Oct 2011
Assembled CVD, PVD Chambers and Semiconductor Process Equipments. - Cooperated with Equipment Engineers to build Equipment “Endura” - Performed Inspection and Calibration of assembled parts. - Set up Power Generation Racks, Main AC, Gas Box and Others. - Performed Leak Check with RGA. - Performed Tier Zero at Customer’s Fab. Assembled CVD, PVD Chambers and Semiconductor Process Equipments. - Cooperated with Equipment Engineers to build Equipment “Endura” - Performed Inspection and Calibration of assembled parts. - Set up Power Generation Racks, Main AC, Gas Box and Others. - Performed Leak Check with RGA. - Performed Tier Zero at Customer’s Fab.
-
-
-
-
Application Engineer
-
Feb 2007 - Feb 2010
Supported Sales Team for LCD Products on Engineering Issues. - Reviewed Customer Requirements and Product specifications for Design Solution. - Pre-analyzed Returned LCD Products and performed Troubleshooting. - Interfaced with Customers and Factories in Asia on Engineering Issues. - Maintained Web site. Supported Sales Team for LCD Products on Engineering Issues. - Reviewed Customer Requirements and Product specifications for Design Solution. - Pre-analyzed Returned LCD Products and performed Troubleshooting. - Interfaced with Customers and Factories in Asia on Engineering Issues. - Maintained Web site.
-
-
-
-
Application Engineer
-
Apr 2006 - Jan 2007
Supported Sales Team for LCD Products on Engineering Issues. - Reviewed Customer Requirements and Product specifications. - Pre-analyzed Returned LCD Products and performed Troubleshooting. Supported Sales Team for LCD Products on Engineering Issues. - Reviewed Customer Requirements and Product specifications. - Pre-analyzed Returned LCD Products and performed Troubleshooting.
-
-
-
-
Application Engineer
-
Dec 2001 - Jun 2005
2/2 - Interfaced with Customers and Factories in Asia on Engineering Issues.; Dispatched to USA Office to support Sales Team on Engineering Issues. - Reviewed Customer Requirements. - Pre-analyzed Returned LCD Products and performed Pre-Troubleshooting for timely Support. - Interfaced with Customers and Hyundai LCD Inc. in Korea. - Maintained and Updated Web site. * HEI became HYNIX Semiconductor, Inc. And LCD Division of HEI was spun off and became “Hyundai LCD, Inc.” (Jan 2002). Show less
-
-
-
-
LCM Senior Engineer
-
Jan 1990 - Nov 2001
Cooperated with Sales Team and Production Team. - Researched and Evaluated Row Materials include Controller and Driver ICs. - Built BOM (Bills Of Materials). - Reviewed Customer Requirements and Finalized LCM Design Spec. - Participated Task Force Team to improve Production Yields.. - Developed Monochrome and Color LCMs for the various Applications like Cellular Phones, Hand Held Units, Medical Devices, Automotives, Office Supplies, and Others. - Created Component Designs for PCB, FPC, Backlight (LED, EL, CCFL), Touch Screen, LCD Panel, Cables, and Others and Evaluated. - Built and Evaluated LCM Proto-Engineering Samples. - Evaluated Raw Materials. - Integrated ICs with various packages like QFP, TCP, COG, and BGA. - Analyzed Returned LCM and Created Failure Analysis Reports. - Participated Task Force Team to improve Production Yields. - Created LCM Product Specification. - Trained Engineers and Technicians - Received Training of LCD Process, Machines, CAD, and Test Equipments. Show less
-
-
Education
-
HANYANG University
B.S, Electronic Engineering