Steve Emmett
Electrical Trade Tutor, EIT Hawkes Bay at Eastern Institute of Technology- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Credentials
-
Diploma of Project Management
TAFE NSWOct, 2009- Oct, 2024 -
Registered Electrical Inspector
NZ Electrical Registration Board
Experience
-
Eastern Institute of Technology
-
New Zealand
-
Higher Education
-
300 - 400 Employee
-
Electrical Trade Tutor, EIT Hawkes Bay
-
Oct 2020 - Present
-
-
-
PTODG Indonesia
-
Indonesia
-
Construction
-
1 - 100 Employee
-
General Superintendent
-
May 2019 - Oct 2020
-
-
-
-
MEP Station Manager
-
Apr 2017 - May 2019
Responsible for the MEP installation works self-performed as part of the Heads works contractor joint venture team for the Goldline. Coordination with other stakeholders such as Mitsubishi for the signaling and track works Responsible for the MEP installation works self-performed as part of the Heads works contractor joint venture team for the Goldline. Coordination with other stakeholders such as Mitsubishi for the signaling and track works
-
-
-
Realys
-
United Kingdom
-
Construction
-
1 - 100 Employee
-
MEP Project Manager
-
Jun 2015 - Dec 2016
MEP Manager for the client's project management consultants on the new Australian Embassy in Bangkok MEP Manager for the client's project management consultants on the new Australian Embassy in Bangkok
-
-
-
-
MEP Division Manager
-
2012 - 2015
Established and managed the MEP division for Leighton Contracting Indonesia.' • Cost estimation and tendering in conjunction with the central hub team in Malaysia • Overview BOQ development and procurement. • Scheduling • Budget control for cash flow positive and profit • Interface with the design consultants • Overview all submissions • Overall project management on multiple projects • Tender reviews for projects without sourced MEP contractors • Overview of all claims preparations Show less
-
-
-
PT ODG Indonesia
-
Indonesia
-
Construction
-
1 - 100 Employee
-
Project amanger
-
2011 - 2012
Project manager for the E&I installation on the Martabe gold processing, Sumartra, Indonesia. Project manager for the E&I installation on the Martabe gold processing, Sumartra, Indonesia.
-
-
-
-
Project Manager
-
Jun 2010 - Jun 2011
REclaim oil form clean out of 500,000 Barrel Storage tank and sludge pits, and provide product recovery including clean water, and cleaned solids for bio remediation REclaim oil form clean out of 500,000 Barrel Storage tank and sludge pits, and provide product recovery including clean water, and cleaned solids for bio remediation
-
-
-
-
MEP manager,
-
2008 - 2009
Seconded to Leighton’s sister company, Al Habtoor Atco to manage the MEP works 20,000 Man Saadiyat Island Construction Village and providing modular building solutions throughout the UAE. • Detailed MEP designs • Provide tender evaluations from subcontractors. • On site management of the MEP works carried out by Al Habtoor Specon • I ended up estimating the complete projects including all civil structural works Seconded to Leighton’s sister company, Al Habtoor Atco to manage the MEP works 20,000 Man Saadiyat Island Construction Village and providing modular building solutions throughout the UAE. • Detailed MEP designs • Provide tender evaluations from subcontractors. • On site management of the MEP works carried out by Al Habtoor Specon • I ended up estimating the complete projects including all civil structural works
-
-
-
-
MEP Electrical Construction Manager
-
2007 - 2008
Al Shaqab Equestrian Academy 200 hectare multiple package construction project, complete with Emirs facilities, equestrian eventing centre with high end stabling, breeding centre, and facilities including a full vetenary hospital. Set up crew to self-perform the installation works, including Superintendents with 600 plus multinational trades. Responsibilities: • Assist to build a full MEP site workforce to self-perform the MEP installation • Identify and Source tools and plant requirements for the MEP works • Set up the MEP site facilities • Manage, develop and monitor all of the individual MEP teams • Manage the BOQ and procurement schedule • Manage the electrical budget • Manage the manpower and personal appraisals Show less
-
-
-
-
Project Manager
-
2005 - 2007
Mechanical and Electrical services for construction and installation projects. • Accommodation camps for Tangguh LNG project in Papua, Indonesia which had a peak occupancy in excess of 8000 • Bata Hijau Coal fired power station, Indonesia: - Fire protection for the coal handling conveyors - Installation of new sub mains for the condenser water pumping system Mechanical and Electrical services for construction and installation projects. • Accommodation camps for Tangguh LNG project in Papua, Indonesia which had a peak occupancy in excess of 8000 • Bata Hijau Coal fired power station, Indonesia: - Fire protection for the coal handling conveyors - Installation of new sub mains for the condenser water pumping system
-
-
-
-
Project Electrical Engineer
-
Mar 2005 - Aug 2005
Induction Furnace & High Voltage reticulation upgrade •60MW 110kV incomers •110kV-33kV 60MW transformer •33kV double bus switch room •Static VAR compensation •New 45MW furnace transformer Induction Furnace & High Voltage reticulation upgrade •60MW 110kV incomers •110kV-33kV 60MW transformer •33kV double bus switch room •Static VAR compensation •New 45MW furnace transformer
-
-
-
-
Contract Project Electrical Engineer
-
2005 - 2005
Engineering for a 35MW Induction Furnace upgrade & to evaluate the associated High Voltage reticulation upgrade. This included: • Rectification and reconfiguration of the 11kV power factor control capacitor bank for the existing 35MW furnace to achieve balanced capacitance on the 3 phase star configured capacitor bank. • Work through the requirements to facilitate installation of a 45MW furnace transformer to replace the existing 35MW unit Set up the tender for the following: • New 110kV incomers, via new submarine cable direct from Otahuhu power station • New 110kV-33kV 60MW transformer • 33kV double bus switch room • Static VAR compensation Show less
-
-
-
Downer MBL Limited
-
New Zealand
-
Chemical Manufacturing
-
Contract Project Electrical Engineer
-
2004 - 2005
Engaged to carry out E&I works for the following: • Clandyboy Milk Powder plant and Powder Handling, • Trouble shoot and solve Clandyboy butter process problems • Cadbury Chocolate Sweetened Condensed Milk, & Butter • Designs and pricing for and Edible oils & fat Plant in Australia Engaged to carry out E&I works for the following: • Clandyboy Milk Powder plant and Powder Handling, • Trouble shoot and solve Clandyboy butter process problems • Cadbury Chocolate Sweetened Condensed Milk, & Butter • Designs and pricing for and Edible oils & fat Plant in Australia
-
-
-
-
Project Electrical Engineer
-
2004 - 2004
Requested to join Tera Pak in NZ upon completion of projects with Tetra Pak Indonesia to carry out E&I designs and pricing for a new AMF Plant, Tatua Co-operative Dairy Factory Requested to join Tera Pak in NZ upon completion of projects with Tetra Pak Indonesia to carry out E&I designs and pricing for a new AMF Plant, Tatua Co-operative Dairy Factory
-
-
-
-
Project Manager, Electrical Engineer
-
2002 - 2004
Electrical /instrumentation superintendent for construction of a new sweetened condensed milk Factory for Nestlé at Kejayan, East Java. • Relocation of plant from Waru in Surabaya • Wet process end • Bulk Powder Handling for Milk powder, Sugar, & other ingredients, • Tipping stations, Dust extraction, Explosion proofing & venting. • Hot Oil for Process, & some involvement with upgrade of 4MW of Gen-sets. E & I Technical & Site Supervision for plant extensions and upgrades for Greenfields Milk in Malang, East Java. Electrical Project Engineer for the following: • Heinz ABC Soy Line, Dan Mogot, Jakarta • PT Foremost CIP upgrade, Jakarta • Indo-lacto UHT Plant • Buana Tirta. Project Manager for Frisian Flag Factory upgrade, Pasar-Rabo, Jakarta, Indonesia. (5 million USD Project) • Utilities Rebuild, new 200m pipe Gallery / bridge. • Two new wet process lines, 7000kg / hr each line to Spray dryer, • Electrical Rebuild of both Spray Dryers • Supervision of up to 150 staff. • Site Safety overview • Mechanical upgrades on both Spray dryers & Powder Handling systems • Re-automation of both spray dryers, • New air handling & ducting for both spray dryer Air Inlets • New air handling & ducting for the dryer building air. Show less
-
-
-
-
Electrical Project Engineer
-
2001 - 2001
Review & Initiate upgrade of site infra-structure and plant to achieve uniformity throughout and resolve plant reliability including the following; • 11kV distribution & Protection • 400V Distribution, Switchboards & Power Factor Correction • Detailed power analysis including harmonic Distortion Analysis • Power factor control with harmonic filtering and power conditioning • Chilled water, • Process cooling water system • Compressed Air reticulation • Power factor control with harmonic filtering and power conditioning • Set up site Electrical Design & Installation Standards. • Electrical Documentation. • Set up Electrical Cad system etc. • Review of Electrical Safety procedures • Installation of new 160kW granulator for reclaiming and reuse of scrap product • Rebuild existing process machinery including upgrade of control systems to standardized PLC and scada format • Factory lighting & emergency lighting upgrade Show less
-
-
-
-
Electrical Technician / Engineer
-
2000 - 2001
Site evaluations and electrical designs for Nokia’s first 3G pilot cell phone network. Commercial building services including the following: • Whangerei Hospital designs and site inspections • Mercy Hospital in Auckland post surgery recovery wing • Tauranga Mental Health Unit • Tamaki College Gymnasium • Clover Park Library • Baradene College auditorium • Eden Park Auckland Rugby Union Football Office Fit-out • Westfield St Lukes Shopping Mall Rebuild • Wireless internet infrastructure NZ wide Show less
-
-
Education
-
Wangaui Polytech NZ
Electrical Trade Certicate -
NZ EWRB
NZ Registered Electrical Inspector -
TAFE NSW
Diploma in Project Management -
NZ Wood Pulp, Paper& Board Manufacturers
Trade Certificate, Pulp & Paper Technology -
New Plymouth Polytech, NZ
Electrical Advanced Trades