Steve Ellaby

Senior Field Engineer at DOT GROUP INTERNATIONAL LIMITED
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Manchester, United Kingdom, GB

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Kingdom
    • Oil and Gas
    • 1 - 100 Employee
    • Senior Field Engineer
      • Jan 2021 - Present

    • Senior Field Engineer
      • Jan 2021 - Mar 2021

      Short contract working on the project South Rookery Energy from Waste. Milton Keynes. OPEN FOR OTHER WORK ...Supervising the installation of a new Asset tagging system, Tagging on all pipe-work & equipment throughout the Energy from Waste plant, tracing the multitude of pipe lines for directional flow and "Ie reading P &ID's and ISO's making sure the correct equipment is being tagged and keeping detailed records of assets tagged also attending daily co-ordination meeting and keeping a check on the men.

    • Field Engineer
      • Nov 2018 - Jan 2021

      MASHCo Ltd.Working on the New Manchester Airport Transformation project. Installing new fuel lines and Fuel/hydrants on the taxi ways and apron.

    • Snr Construction Supervisor
      • Apr 2015 - Jul 2018

      Working in a multi-national team for B WV on a new prototype EFW Power Plant, Daily duties included monitoring progress, permit signing, organizing and planning of the various sub-contractors scope of works attending daily safety, planning, and co-ordination meetings, leading to key project mile stones through to construction completion, Including detailed monitoring of the steel-work build, Boiler and FGT build, also in charge of all the insulation on the boiler and FGT area’s, resolving the various build issue from the unloading of 27m long boiler walls to installation of 55 ton steam drum and all heavy equipment, supervising of the building of the FGT silos on site!. Daily walk downs, hydro testing, completing punch lists, inspections, commissioning & final sign offs for mechanical completion. The Peterborough project was completed on time and budget; I transferred to the Rotherham Biomass plant to carry out the same duties

    • Piping and Mech Superintendant
      • Feb 2014 - Dec 2014

      My role involved overseeing construction on an EPCM contract with emphasis on quality leading to completion of mile stones and MC, also managing the Tie-in identification co-ordination and Schedule for the upcoming shutdown on the site, The shutdown and Tie-Ins where completed on time and on budget, A successful completion of the contract on a tight timetable and budget

    • Pre-Comm Piping Supervisor
      • Mar 2013 - Aug 2013

      Working on behalf of Total."Client" building a major new Gas Terminal “Laggan-Tormore Gas fields” on the Shetland Isles, supervision of the principle contractors reviewing RAMS, and monitoring progress in the field emphasis on Strong HSE requirements and quality, attending daily Co ordination meeting with various contractors ect.Weekly safety walk rounds and report backs.

    • Piping and Mech Superintendant
      • Jan 2012 - Dec 2012

      Working on behalf of Borealis reporting to the construction manager, overseeing installation of process pipe work and fire systems, co-ordinating and controlling the everyday activities between various sub contractors on site, working as part of a team supervising the final inspections and sign off’s , Hydro-testing , Re-instatement, final walk a round’s leading to MC, Also involvement in Commissioning and Pre-Commissioning plant and equipment; Driving HSE initiatives and maintaining high safety levels, Whilst achieving milestones targets, and bringing the contract in before the estimated end date and significantly under budget.

    • Piping and Mech Superintendant
      • Jan 2011 - Nov 2011

      Constructing the Ambatovey Power Plant in Madagascar, Working on behalf of the client on an EPC contract, Co-ordinating and controlling the activities of the sub-contractors and supervisory staff, overseeing the construction methods procedures and practices, particular those relating to quality assurance, punch listing, Hydro-testing, Pre-Commissioning and Commissioning and plant and equipment.

    • Piping Superintendant
      • Oct 2009 - Aug 2010

      My role involved overseeing construction on an EPCM contract with emphasis on quality leading to punch listing, Hydro-testing and re-instatement, whilst maintaining safety levels and HSE requirements. Involvement in reviewing method statements and risk assessments, leading sub-contractors into achieving milestone targets within project requirements and within budgets.

    • Oil and Gas
    • 700 & Above Employee
    • Piping and Mech Supervisor
      • Jan 2009 - Oct 2009

      Carrying out major remedial work on proto type degasification rig off the coast of Italy,monitoring new construction, fabrication and installation leading to punch listing, Hydro-testing and re-instatement,maintaining safety levels and HSE requirements. Involvement in reviewing method statements and risk assessments, leading sub-contractors into achieving milestone targets within project requirements and within budgets.

    • Construction Area Superintendant
      • Apr 2008 - Dec 2008

      Working on behalf of the client on an EPCM contract Overseeing Construction with emphasis on quality leading to punch listing, Hydro-testing and re-instatement, whilst maintaining safety levels and HSE requirements. Involvement in reviewing method statements and risk assessments, leading sub-contractors into achieving milestone targets within project requirements and within budgets.

    • Senior Piping and Mech Supervisor
      • Jan 2007 - Mar 2008

      Reporting to the construction manager, Overseeing Construction of a Petro-chem refinery, emphasis on quality, leading to punch listing, Hydro-testing and re-instatement, whilst maintaining safety levels and HSE requirements. Involvement in reviewing method statements and risk assessments, leading sub-contractors into achieving milestone targets within project requirements and budgets.

    • Piping Supervisor
      • Jul 2005 - Oct 2006

      Supervision of subcontractors, Supervision of process pipe work fabrication at the sub-contractors fabrication facilities, monitoring fabrication progress with specific input to ensuring that planned production levels are maintained to meet project completion schedules /milestones.Field Piping Engineer BHP Billiton ROD Integrated development Project

    • Field Piping Supervisor
      • Sep 2004 - Jun 2005

      Reporting to the construction manager working on behalf of the client on an EPC contract Co-ordinate and control the activities of the sub-contractors and supervisory staff, overseeing the construction methods procedures and practices particular those relating to quality assurance, punch listing, Hydro-testing and commissioning plant and equipment.

    • Field Piping Engineer
      • Feb 2003 - Jun 2004

      Major Up-Grade Cat-Cracker and overseeing quality of construction fabrication, installation and re-instatement, Hydro-testing and commissioning of process pipe work and equipment on existing installation, always maintaining safety levels and HSE mandates.

    • Piping Supervisor
      • Mar 2001 - Dec 2002

      Duties included the supervision of manpower and monitoring of daily work in progress of top-side facilities, Platforms, Pipe-work Pipelines, Vessels, Exchangers, Initial punch listing and resolving of punch items, Hydro Testing and Reinstatement of pipe work final inspection to Document completion and sign off.

    • Offshore Superintendent
      • Jan 1999 - Nov 2000

      Installation of new gas Separator, Flow and gas lift lines to the well heads on the EBUGHU Platform, Upgrade for the ADDAX Petroleum. Duties included material take-offs, expediting and ordering of specialist materials, associated method statements, co-ordination, mobilisation

    • Field Piping Supervisor
      • Jan 1997 - Oct 1998

      I inspected the pipe work to make sure it was installed correctly and fell within the specifications, ie materials, welding, testing, cleaning, insulation, ect Also final walk down of systems, final sign offs and handover.

    • Piping Supervisor
      • Feb 1996 - Oct 1997

      contracts throughout the North Sea

    • United Kingdom
    • Oil and Gas
    • 1 - 100 Employee
    • General Forman
      • Apr 1993 - Oct 1995

      Various Contracts/Shutdowns throughout the North Sea/Orkney Islands ect

    • Piping Supervisor
      • Feb 1992 - Jan 1993

      Strip out and Re-instatement of Cat-Cracker and all that it entailed.

    • Piping Forman
      • Mar 1991 - Nov 1991

      Contracts/Shutdowns throughout the North Sea.

    • Piping Forman
      • Aug 1990 - Jan 1991

      Tie-in work on Morecambe Bay Gas Field

    • Piping Forman
      • Jan 1988 - Jan 1990

      Tie-in work on Morecambe bay

    • Piping Forman
      • May 1986 - Jan 1988

      Re-fits on Vild-Cat & Sun Oil Balmoral platforms.

    • Pipe fitter
      • Feb 1983 - Jan 1985

      piping construction work on the New Gas Terminal

    • Pipe fitter
      • Jan 1982 - Jan 1983

      Various piping construction work on the Coal to Oil refinery

    • Pipe fitter
      • Jan 1979 - Jan 1981

      piping construction work on the Oil Terminal

    • Apprentice Fitter
      • Feb 1972 - Jan 1979

      Working on various types of installations & construction projects From Schools, Hospitals, Petro-Chem and Oil refineries, Steelworks And power stations, being offered work in Poland but refused then Made redundant, I then started work in the Oil industry.

Education

  • Advanced City Guilds
    Openshaw, Technical college, HVAC..
    1972 - 1975
  • Tec National
    B, Mech
    1974 - 1976

Community

You need to have a working account to view this content. Click here to join now