Stephen Knell

Engineering Department at Exeros Technologies
  • Claim this Profile
Contact Information
Location
London, England, United Kingdom, GB
Skills

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Credentials

  • NVQ level 3 electrical installation
    -
    Jun, 2014
    - Sep, 2024

Experience

    • United Kingdom
    • Motor Vehicle Manufacturing
    • 1 - 100 Employee
    • Engineering Department
      • Aug 2017 - Present

    • United Kingdom
    • Retail Office Equipment
    • Lift Engineers Mate
      • Apr 2016 - Jun 2016

    • United Kingdom
    • Facilities Services
    • 100 - 200 Employee
    • Trainee lift engineer
      • Oct 2015 - Feb 2016

      • Assisted Engineer in the maintenance and repair of various lift components including: Installing new Safety Detector Edges, Re-roping of Stannah Microlifts and a complete Controller change• Assisted Engineers in the servicing of lifts by helping clean the Shaft and Pit areas• Assisted Engineers on call outs to various lifts with varying issues • Assisted Engineer in the maintenance and repair of various lift components including: Installing new Safety Detector Edges, Re-roping of Stannah Microlifts and a complete Controller change• Assisted Engineers in the servicing of lifts by helping clean the Shaft and Pit areas• Assisted Engineers on call outs to various lifts with varying issues

    • United Kingdom
    • Construction
    • 1 - 100 Employee
    • Site fiters mate
      • Dec 2014 - Feb 2015

      • Assisted Fitter in installing a range of metal products in a variety of locations.• Assisted engineers in factory with the fabrication of products using a selection of hand tools and machinery.• Aided lift engineers with removal of old lift components in preparation for a new lift to be fitted • Assisted Fitter in installing a range of metal products in a variety of locations.• Assisted engineers in factory with the fabrication of products using a selection of hand tools and machinery.• Aided lift engineers with removal of old lift components in preparation for a new lift to be fitted

Education

  • LeSoCo
    electrical installation
    2011 - 2014
  • Lewisham College
    Performing Engineering Operatons
    2011 - 2014

Community

You need to have a working account to view this content. Click here to join now