Stephen Harber

Account Engineer at ENVIROGEN WATER TECHNOLOGIES LIMITED
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Woodham, England, United Kingdom, UK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Low Voltage Authorised Person Electrical - Industrial
    Schneider Electric
    Jan, 2015
    - Nov, 2024
  • Thames Water Construction Skills Passport
    Thames Water
    Sep, 2008
    - Nov, 2024
  • The Frontline Skills Framework - Utilities (5831) - Water Distribution
    City & Guilds
    Aug, 2017
    - Nov, 2024
  • CSCS Card
    CITB
    May, 2014
    - Nov, 2024
  • Construction Site Manager's Safety Certificate
    CITB
    Mar, 2014
    - Nov, 2024
  • Entry into Confined Spaces with Escape Breating Apperatus
    Citrus Training
    Jan, 2015
    - Nov, 2024
  • First Aid at Work
    St Johns Ambulance
    Oct, 2014
    - Nov, 2024
  • Confined Spaces Module 1
    Morgan Sindall
    Oct, 2008
    - Nov, 2024
  • National Water Hygiene Card
    Energy & Utility Skills
    Nov, 2008
    - Nov, 2024

Experience

    • United Kingdom
    • Utilities
    • 1 - 100 Employee
    • Account Engineer
      • Jul 2016 - Present

      Responsible for Operation & Servicing of multiple Effluent Treatment Plants (ETPs) Responsible for Operation & Servicing of multiple Effluent Treatment Plants (ETPs)

    • Project Engineer (M&E) - Installation / Commissioning
      • Mar 2016 - Jun 2016

      Surplus to company requirements, seeking new direction Surplus to company requirements, seeking new direction

    • United Kingdom
    • Construction
    • 700 & Above Employee
    • Project Engineer (M&E) - Installation/Commissioning
      • Apr 2013 - Feb 2016

      Site based M&E Installation/Commissioning Project Engineer brought in to complete Bio-Mass Boiler installation & plant commissioningResponsibilities:Provide M&E input to complete installationDesign review and implementaion of up-gradesLiaising & supervision of sub-contractorsPlant CommissioningSite AP for LV Switching

    • Project Engineer (M&E) - Installation/Commissioning
      • Sep 2008 - Apr 2013

      Site base Project Engineer working on the Thames Water Ring Main Extension - Brixton to Honor Oak (AMP4)Responsibilities:Liaising with client & sub-contractorsManagement of sub-contractors (Design & Installation)Providing on site M&E design assistancePlant CommissioningSite AP for LV Switching

    • United Kingdom
    • Design Services
    • 700 & Above Employee
    • 'Embedded' Project Engineer
      • Jun 2007 - Sep 2008

      Part of the 'Project Alliance Group' based at Lonza Biologics, Slough, Berks. Responsibilities: Liaising with clients & contractors Management of contractors Management of Project budget Project planning & scheduling Part of the 'Project Alliance Group' based at Lonza Biologics, Slough, Berks. Responsibilities: Liaising with clients & contractors Management of contractors Management of Project budget Project planning & scheduling

    • United States
    • Pharmaceutical Manufacturing
    • 700 & Above Employee
    • Senior Project Engineer [Utilities]
      • Aug 2003 - Jun 2007

      Projects related to site & building utilities for both divisions. Also included are facility and site expansions. Responsibilities: Liaising with clients & contractors Management of contractors Management of Project budget Project planning & scheduling Raising & controlling of Change Controls Up-dating of drawings & SOP's as required Controlling changes to site electrical distribution system Projects related to site & building utilities for both divisions. Also included are facility and site expansions. Responsibilities: Liaising with clients & contractors Management of contractors Management of Project budget Project planning & scheduling Raising & controlling of Change Controls Up-dating of drawings & SOP's as required Controlling changes to site electrical distribution system

    • Project Engineer
      • Jul 1987 - Aug 2003

      Projects relating to new equipment and facility installations. Originally only encompassing Health & Nutritional division but later expanding to include Pharmaceutical division. Responsibilities: Liaising with clients & contactors Management of contractors Management of project budget Project planning & scheduling Up-dating of drawings & SOP's as required Projects relating to new equipment and facility installations. Originally only encompassing Health & Nutritional division but later expanding to include Pharmaceutical division. Responsibilities: Liaising with clients & contactors Management of contractors Management of project budget Project planning & scheduling Up-dating of drawings & SOP's as required

    • Junior Project Engineer
      • Apr 1984 - Jul 1987

      Projects relating to new equipment and facility installations for Health & Nutritional division.Responsibilities:Assisting Project manager in progressing projectsProducing new and revising existing drawingsControl of drawing register

    • Process Development Engineer
      • Mar 1982 - Apr 1984

      Projects relating to new equipment and facility installations for Health & Nutritional division. Involved with the plant relocation from Slough to Swindon.Responsibilities:Improving manufacturing processes & equipmentProducing new and revising existing drawingsIssuing and copying of drawingsControl of drawing register

    • Draughtsman
      • Jul 1979 - Mar 1982

      Projects relating to new equipment and facility installations for Health & Nutritional division.Responsibilities:Producing new and revising existing drawingsIssuing and copying of drawingsControl of drawing register

Education

  • Slough College of Technology
    Supplementary Certificate, HND Mechanical Engineering; Industrial Administration

Community

You need to have a working account to view this content. Click here to join now