Stephen Brooks
Piping Supervisor at Dragon LNG Milford Haven , Wales- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Brian Allen
Stephen is goal orientated and good manager of people, his knowledge of Piping is excellent. Stephen has produced good results in maintaing shcedule and working to priorities. Has experience of Managing multiple nationalities and has gained a high amount of respect from his workers.
Brian Allen
Stephen is goal orientated and good manager of people, his knowledge of Piping is excellent. Stephen has produced good results in maintaing shcedule and working to priorities. Has experience of Managing multiple nationalities and has gained a high amount of respect from his workers.
Brian Allen
Stephen is goal orientated and good manager of people, his knowledge of Piping is excellent. Stephen has produced good results in maintaing shcedule and working to priorities. Has experience of Managing multiple nationalities and has gained a high amount of respect from his workers.
Brian Allen
Stephen is goal orientated and good manager of people, his knowledge of Piping is excellent. Stephen has produced good results in maintaing shcedule and working to priorities. Has experience of Managing multiple nationalities and has gained a high amount of respect from his workers.
Credentials
-
levels 1, 2 & 3 pipework engineering
city and guildsJan, 1981- Nov, 2024
Experience
-
Dragon LNG and Dragon Energy
-
United Kingdom
-
Oil and Gas
-
1 - 100 Employee
-
Piping Supervisor
-
Feb 2017 - Present
Dragon LNG is engineering and constructing a Boil Off Gas (‘BOG’) Reliquefaction Plant at its site in Waterston, Milford Haven, which will reliquefy BOG during long periods of zero send out and thus prevent stored LNG from maturing. Area Supervisors duties and responsibilities: Supporting the Construction Manager the Area Supervisors role is to ensure the project is delivered safely, efficiently to the required quality standards in accordance with the projects requirements. Accountable for the construction activities within his defined area the Supervisors responsibilities include: • Ensuring HSE, Quality and Progress objectives are met; • Managing the Supervisors within his area to ensure the project is delivered safely, efficiently to the required quality standards; • Serving as secondary representative between Dornan and the projects construction team; • Ensuring construction activities are performed under appropriate PTW’s, in accordance with the approved RAMS; • Intervening where necessary to prevent unsafe practices or behaviors; • Perform regular safety walk-downs within their area, defining any new hazards as the area develops; • Ensuring non-workers are aware of any risks and hazards prior to them entering their area; • Actively participating in TBT’s and safety discussions; and • Monitoring and reporting on construction progress. Show less
-
-
-
Wrightway Environmental
-
United Kingdom
-
Piping Supervisor
-
Nov 2016 - Jan 2017
Currently installing systems across the UK working on dust suppression systems within power generation sites. Currently installing systems across the UK working on dust suppression systems within power generation sites.
-
-
-
AHL
-
United States
-
Architecture and Planning
-
1 - 100 Employee
-
Piping Supervisor
-
Apr 2016 - Sep 2016
Installing Chiller Unit / ethanol lines / nitrogen lines and 4 skids at Proctor and Gamble. Currently coordinating piping, civil and electrical works. Piping / electrical / civil / construction manager / project manager Installing Chiller Unit / ethanol lines / nitrogen lines and 4 skids at Proctor and Gamble. Currently coordinating piping, civil and electrical works. Piping / electrical / civil / construction manager / project manager
-
-
-
M+W Group
-
Germany
-
Semiconductors
-
700 & Above Employee
-
Mechanical Construction Manager
-
Jan 2016 - Mar 2016
Working on a solar power plant, my role is to ensure the project meets deadlines whilst working with a range of skills. Turned the project around in the 3 months. Solar / Renewable / Power / Electricity / Project Manager / Piping Working on a solar power plant, my role is to ensure the project meets deadlines whilst working with a range of skills. Turned the project around in the 3 months. Solar / Renewable / Power / Electricity / Project Manager / Piping
-
-
-
AHL
-
United States
-
Architecture and Planning
-
1 - 100 Employee
-
Project Manager
-
Mar 2015 - Oct 2015
Duties; I am charge of ensuring their latest project in Leeming Bar is delivered on time. The project is a large Biogas, waste to energy project on behalf of the client – JFS. As can be seen by the press release - http://jfsassociates.co.uk/leeming-bar-plant-has-gone-live/. When I joined the project in March it looked unlikely to be delivered by this point, we have managed, as a team to turn the project in to a success. We recently flowed Bio-methane to the grid. Project successfully completed and delivered on time and within budget. BIOMASS / BIOGAS / Energy to waste / Convertible energy Show less
-
-
-
SBV Fabrication and Site Services Limited
-
United Kingdom
-
Construction
-
1 - 100 Employee
-
Lead Piping Manager
-
Oct 2014 - Dec 2014
I was in charge of looking after the projects across SBV, ensuring that progress was made on each site. Recently one of our clients, commended myself and the team for being able to turn around a project in such a short space of time. Piping / Pipeline / Pipe / Engineering I was in charge of looking after the projects across SBV, ensuring that progress was made on each site. Recently one of our clients, commended myself and the team for being able to turn around a project in such a short space of time. Piping / Pipeline / Pipe / Engineering
-
-
-
Babcock International Group
-
United Kingdom
-
Defense and Space Manufacturing
-
700 & Above Employee
-
Supervisor
-
Jul 2011 - Oct 2014
I worked for Doosan for over three years, working on a range of project around the refinery at Grangemouth. I worked for Doosan for over three years, working on a range of project around the refinery at Grangemouth.
-
-
-
-
project manager (Works)
-
Jul 2010 - Dec 2010
This was an Alstom project, created for Essent. The conversion of a gas power station that initially came online in 1977 to a ccgt plant, extending the power station I worked on the repowering of claus B and the construction of claus C. The project involved the replacement of the old gas fired boiler of Claus B by the three new GT26 gas turbines will increase the total output to 1,280 MW from the current 640 MW and reduce CO2 emissions by 40%. I looked over the work of a project team of around 40-50 men. I liaised with site managers, project managers and clients whilst on this project. Show less
-
-
-
-
project manager (Works)
-
Jun 2008 - Nov 2009
This was an Alstom project, designed for Centrica. The project was a CCGT project. The aim of the project was to allow the power station to go from 0 to 900 MW in less than an hour, featuring the largest ever-installed Integrated Cycle Solution (ICSTM) heat recovery steam generators in the UK, having emission levels among the lowest in the world for this type of facility. I was in charge of overseeing around 240 men on this project, often liaising with site managers, directors and clients, giving feed back on progression and potential problem solving. Show less
-
-
-
Tate & Lyle
-
United Kingdom
-
Food and Beverage Manufacturing
-
700 & Above Employee
-
piping engineer (supervisor)
-
Feb 2008 - Jun 2008
Project involved the upgrading of all pipework within the plant replacing existing pipework with new stainless steel pipes. The projects aim was to increase the capacity of the plant. Project involved the upgrading of all pipework within the plant replacing existing pipework with new stainless steel pipes. The projects aim was to increase the capacity of the plant.
-
-
-
British Sugar
-
United Kingdom
-
Food and Beverage Manufacturing
-
700 & Above Employee
-
piping engineer (supervisor)
-
Oct 2007 - Feb 2008
The upgrade of the old plant in Shrewsbury, involved the replacing of old pipe work and installing new pipe. The upgrade of the old plant in Shrewsbury, involved the replacing of old pipe work and installing new pipe.
-
-
-
Procter & Gamble
-
United States
-
Manufacturing
-
700 & Above Employee
-
piping engineer
-
Jan 2007 - Sep 2007
The plant was upgraded so that it could cope with the increasing range of products P&G produce in Northumberland. It incorporated working with a range of pipes in size and material. The plant was upgraded so that it could cope with the increasing range of products P&G produce in Northumberland. It incorporated working with a range of pipes in size and material.
-
-
-
Scottish and Newcastle
-
Food and Beverage Services
-
1 - 100 Employee
-
piping engineer (supervisor)
-
Apr 2005 - Nov 2006
A large scale upgrade of the brewery replacing pipe work that had become dated. A large scale upgrade of the brewery replacing pipe work that had become dated.
-
-
-
GSK
-
United Kingdom
-
Pharmaceutical Manufacturing
-
700 & Above Employee
-
piping engineer (supervisor)
-
Nov 2003 - Jan 2005
Worked on a refit of the Barnet plant. All pipework was fitted to spec. Worked on a refit of the Barnet plant. All pipework was fitted to spec.
-
-
-
Amec Foster Wheeler
-
United Kingdom
-
Oil and Gas
-
700 & Above Employee
-
piping engineer (supervisor)
-
Oct 2002 - Jul 2003
The overall aim of the project by Amec was to spend 10 months project managing the programme to turn the hull into one of the largest and most complex floating oil and gas production facilities ever built. The floating gas and oil production platform was fitted with 22,000 tonnes of processing equipment at the Amec shipyard, before being towed to the Nigerian Bonga oil field. I was involved with all pipe works within the Bonga and helped to install the new equipment. The overall aim of the project by Amec was to spend 10 months project managing the programme to turn the hull into one of the largest and most complex floating oil and gas production facilities ever built. The floating gas and oil production platform was fitted with 22,000 tonnes of processing equipment at the Amec shipyard, before being towed to the Nigerian Bonga oil field. I was involved with all pipe works within the Bonga and helped to install the new equipment.
-
-
-
-
piping engineer (supervisor), piping engineer, pipe fitter, project manager
-
Jan 1981 - Dec 2001
Worked across a range of projects; - British sugar (Shrewsbury) Commercial - Brew chem Ltd (Canary Wharf) Commercial - Enron Power plant (Teeside) Power - P&G (Seaton Delval) Pharmaceutical - S&N Breweries (Newcastle) Brewery - McNaultys (Newcastle) Ship repair - Amec (Newcastle) Offshore rigs - Ingersol RAND (Chicago) Commercial - Amec (St Fergus) Oil rig - P&L Engineering (Sedgefield) Chemical plant - Redpath engineering (Sellafield) nuclear - AP/AOC (Dorset) wytch farm Show less
-
-
Education
-
Walbottle High School