Stefano Biasotti
Project Manager at Amico & Co Srl- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Italiano Native or bilingual proficiency
-
Inglese Full professional proficiency
Topline Score
Bio
Credentials
-
Installation Calculations for Subsea Pipelines
Jee LimitedNov, 2016- Nov, 2024 -
Construction of Subsea Pipelines
Jee LimitedOct, 2014- Nov, 2024 -
BOSIET (Basic Offshore Safety Induction and Emergency Training) including OLF supplement
STC-KNRM Offshore-Safety BVApr, 2013- Nov, 2024 -
HUET (Helicopter Underwater Escape Training) including EBS (Emergency Breathing System)
STC-KNRM Offshore-Safety BVApr, 2013- Nov, 2024 -
Saudi Aramco Work Permit Receiver – (Hot/Cold Work; Confined Space Entry; Releases)
Saudi AramcoApr, 2015- Nov, 2024
Experience
-
Amico & Co S.p.A.
-
Italy
-
Shipbuilding
-
1 - 100 Employee
-
Project Manager
-
Aug 2017 - Present
-
-
-
Saipem
-
Italy
-
Engineering Services
-
700 & Above Employee
-
Offshore Field Engineer
-
Apr 2013 - Aug 2017
From Jul-15 to Present, Caspian Sea, Azerbaijan Onboard of PLBH, Pipe Lay Barge “Israfil Huseynov” Shah Deniz Project Stage 2 (Client: BP) Shore Pull and S-Lay Installation of Two 32” Gas Export Pipelines and One 16” Condensate Pipeline with 6” Piggyback MEG Import Pipeline. From Feb-15 to Jul-15, Arabian Gulf, Saudi Arabia Onboard of Castoro 8, Derrick/Lay Vessel (Heavy Lift) - AL WASIT Project (Saudi Aramco) Installation of Three WHPs on Arbi 5,6,7 (960MT) Riser Installation, Spool wet storage, Hook-up Activities, Flare Boom Installation (153MT) - Marjan & Zuluf Project (Saudi Aramco) Lifting upending and Installation of MRJN 460/469 (736MT) and ZULF 510/519 (750MT) Jackets. - LTA Project Abu Safah Riser demolition and replacement and installation of ABSF1 51/160 WHP (780MT). From Jul-14 to Feb-15, Arabian Gulf, Saudi Arabia Onboard of D.L.B. Castoro II AL WASIT Project (Saudi Aramco) S-Lay installation of One 36”OD CLAD Trunkline w/ 4”OD Solvent Piggyback; One 36”OD CLAD Trunkline; Seven 12”OD High Pressure Gas CLAD Flowlines Recovery demolition and repair of One 10" OD MEG line Installation of Alignment Frames, J-tubes, Risers and wet storage of Closure Spools From Mar-14 to Jul-14, North Sea Onboard of Semi-submersible Pipelay Vessel Castoro Sei Cygnus Development Project (GDF Suez) S-Lay Installation of One 12” Infield Pipeline; One 24” Export Pipeline Hejre Development Project (Dong Energy) S-Lay Installation of One 12'' Oil Export Pipeline; One 12'' Gas Export Pipeline From Sep-13 to Feb-14, SGdP Shipyard in Genoa, Italy Onboard of Semi-submersible Pipelay Vessel Castoro Sei "Maintenance & Upgrading Project" at San Giorgio del Porto Shipyard: Vessel Renewal and Upgrading (Installation of new 400T A&R Winch) From Apr-13 to Jul-13, ERS Base, Schiedam, Netherland Onboard of Semi-submersible Pipelay Vessel Castoro Sei: Maintenance and upgrade of vessel equipment and structures
-
-
-
MARIN (Maritime Research Institute Netherlands)
-
Netherlands
-
Research Services
-
400 - 500 Employee
-
Trainee
-
Mar 2012 - Sep 2012
• Study and application of simulation programs (Sursim) • Analysis of data from captive and free model tests (model-scale and full-scale measurements) • Model tests optimization (PMM & RA) • Step by step planning of the project-Master’s thesis compilation • Study and application of simulation programs (Sursim) • Analysis of data from captive and free model tests (model-scale and full-scale measurements) • Model tests optimization (PMM & RA) • Step by step planning of the project-Master’s thesis compilation
-
-
-
Ignazio Messina & C.
-
Italy
-
Maritime Transportation
-
300 - 400 Employee
-
Trainee
-
Jul 2009 - Jul 2009
• On board experience during maintenance and assistance operations • Technical and mechanical inspection assistance (Non Destructive Testing) • Communication system review between ships and headquarter (AMOS system) • Cargo loading plan • On board experience during maintenance and assistance operations • Technical and mechanical inspection assistance (Non Destructive Testing) • Communication system review between ships and headquarter (AMOS system) • Cargo loading plan
-
-
Education
-
Università degli Studi di Genova / University of Genoa
Master's degree, Naval Architecture and Marine Engineering -
Università degli Studi di Genova / University of Genoa
Bachelor's degree, Naval Architecture and Marine Engineering