Stefan de Jong
Technical Director at Dice- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Dice
-
United Kingdom
-
Civil Engineering
-
1 - 100 Employee
-
Technical Director
-
Jun 2023 - Present
Nottingham, England, United Kingdom
-
-
Associate
-
May 2022 - Jun 2023
Nottingham, England, United Kingdom
-
-
-
Mott MacDonald
-
United Kingdom
-
Civil Engineering
-
700 & Above Employee
-
Associate
-
Jul 2021 - May 2022
Sheffield, England, United Kingdom Leading the delivery of a wide range of projects from our Sheffield office.
-
-
Principal Structural Engineer
-
Jan 2020 - Jul 2021
Sheffield, United Kingdom
-
-
Senior Structural Engineer
-
Jan 2017 - Dec 2019
Sheffield, United Kingdom University of Sheffield, Faculty of Social Sciences, Sheffield – Structural design team lead responsible for delivery of RIBA Stage 4 design information for an £80m construction value world class facility for Sheffield University. The structure designed largely in concrete includes 19m span PT concrete transfer beams but also cantilevering central drum teaching spaces designed in steel within a glazed atrium. The Grasshopper add-in to Rhino was used to generate the complex roof structure and to… Show more University of Sheffield, Faculty of Social Sciences, Sheffield – Structural design team lead responsible for delivery of RIBA Stage 4 design information for an £80m construction value world class facility for Sheffield University. The structure designed largely in concrete includes 19m span PT concrete transfer beams but also cantilevering central drum teaching spaces designed in steel within a glazed atrium. The Grasshopper add-in to Rhino was used to generate the complex roof structure and to build in the ability to parametrically control the geometry. The scheme also includes extensive external structural works including secant, kingpost, reinforced concrete and gabion retaining walls. Value was added using BIM processes and information sharing between disciplines. Stane Park, Stanway, Colchester – Structural design team lead responsible for delivering construction information for 5 commercial units for a new £12m leisure development of restaurants. Design was carried out working closely with the Architect and Steel Fabricator to phase the delivery of the steel frame to meet the requirements of each restaurant within a very tight program. Isobel Bowler Sports Pavilion, Sheffield – Structural design team lead responsible for delivering construction stage information for a £3.7m two-storey pavilion including a gym, fitness suite, club room and changing facilities for Sheffield City Council as part of the FA’s wider investment in grassroots football. The steel frame supports a precast concrete first floor slab and green roof and bears onto a concrete raft foundation which also forms the base of a 3.5m propped retaining wall. The retaining wall was designed and construction using Nudura polystyrene permanent formwork which significantly reduced the construction program.
-
-
Chartered Structural Engineer
-
Sep 2014 - Dec 2016
Sheffield, United Kingdom Sheffield University, Faculty of Social Sciences - Structural design team lead responsible for delivery of RIBA Stage 2 and 3 design information for an £80m world class facility for Sheffield University. Silverdale School Expansion, Sheffield – Mott MacDonald project manager and structural engineer responsible for producing stage 1, 2 and 3 information for extending this secondary school to accommodate 400 additional students. RAF Croughton – Structural engineer for the 35%… Show more Sheffield University, Faculty of Social Sciences - Structural design team lead responsible for delivery of RIBA Stage 2 and 3 design information for an £80m world class facility for Sheffield University. Silverdale School Expansion, Sheffield – Mott MacDonald project manager and structural engineer responsible for producing stage 1, 2 and 3 information for extending this secondary school to accommodate 400 additional students. RAF Croughton – Structural engineer for the 35% stage design of a new 20,000m2 mission critical building and a variety of support structures. Structures included a fitness centre with a suspended running track hung from long span roof trusses where assessment of vibration was critical; several portal frame structures; extensions to existing lightweight steel modular buildings; and design of Single Living Accommodation blocks. Better Barnsley (The Glassworks) – Structural engineer responsible for producing the demolition specification for several buildings in the heart of Barnsley city centre. Role included gaining a thorough understanding of the form and construction of the existing structures and assessment of the suitability of the suspended ground floor slab for retention. London Central Local Delivery Office – Civil engineering team leader for a £12 million new-build Parcelforce local delivery office. Responsible for the coordination, production and delivery of the civil and structural engineering services for the scheme. Leeds Station Southern Entrance – Design engineer responsible for the detailed design of this extension to the station building. Generated the complex structural geometry using Grasshopper and design included global buckling analysis and consideration of second order effects.
-
-
Structural Engineer
-
Sep 2008 - Sep 2014
Sheffield, United Kingdom NET 2 (Nottingham Express Transit) – Carried out an independent check of several sections of Inham Nook culvert subject to highway and tram loading. Finningley and Rossington Regeneration Route Scheme (FARRRS) – Carried out detailed design for two underpasses crossing beneath the planned 4.5km relief road connecting the M18 at junction 3 to the A638 to the south east of Doncaster. Water Orton to Doncaster Gauge Enhancement – Design engineer responsible for producing construction… Show more NET 2 (Nottingham Express Transit) – Carried out an independent check of several sections of Inham Nook culvert subject to highway and tram loading. Finningley and Rossington Regeneration Route Scheme (FARRRS) – Carried out detailed design for two underpasses crossing beneath the planned 4.5km relief road connecting the M18 at junction 3 to the A638 to the south east of Doncaster. Water Orton to Doncaster Gauge Enhancement – Design engineer responsible for producing construction stage information for two, 3 span conarch bridge reconstructions for the GRIP 5 design of gauge enhancement works along an 85km stretch of railway between Birmingham and Doncaster. Boots Building D6 – In order to advise the client on the structural implications of bringing this largely empty grade I listed structure back into full use, was involved in carrying out a visual inspection of the current structural condition. Also responsible for performing detailed structural analysis in order to report on the capacity and robustness of the structure. St Neots Cinema Unit 1 – Responsible for the structural scheme design of this commercial and residential unit. Deans Nursery – Structural engineer responsible for design of this single storey masonry structure with a timber trussed roof. Sheffield BSF, (Handsworth Grange School, High Storrs School, King Edward VII School, City School) – Responsible for delivering construction stage information for the superstructure and substructure of these school schemes as well as carrying out extensive analysis of existing listed buildings for internal structural modifications.
-
-
Education
-
University of Durham
MEng (Hons), Civil Engineering -
Mill Hill County High School