Stanley Kipela - BEng/IEPNG/IAENG

Project Engineer - PMU at Water PNG Ltd
  • Claim this Profile
Contact Information
Location
Port Moresby, Papua New Guinea, PG
Languages
  • English -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • International Association of Engineer Member (IAENG)
    International Association of Engineers
    Oct, 2022
    - Oct, 2024
  • Project Management Professional (PMP)
    Clough
    Mar, 2020
    - Oct, 2024
  • PROFESSIONAL ENGINEERS REGISTRATION BOARD
    Instution of Engineers in Papua New Guinea
    Jan, 2019
    - Oct, 2024

Experience

    • Papua New Guinea
    • Utilities
    • 1 - 100 Employee
    • Project Engineer - PMU
      • Sep 2020 - Present

      Feasibility study, preliminary design, design build tender documents, construction supervision, commission and hand over to operation for Water PNG. Major projects includes World Bank, GoPNG Public Investment Program, ADB, Europen Union Funded Project. The projects that am managing now are; 1. Ialibu Water supply project 2. Namatanai Water supply project 3. Kerevat Water Supply Project 4. Aitape Water Supply Project 5. Misima Water Supply Project 6. Kupiano Water supply Project 7. Kurumul Water Supply Project and EU projects 1. Banz Water Supply Project Show less

    • Australia
    • Construction
    • 700 & Above Employee
    • Senior Project Engineer
      • May 2018 - Sep 2020

      Cough Niugini Response Project for Oil Search 1. Processing Facility Restore works 2. Oil Pipe line restoration works. 12. Well Services Workshop construction 13. Ridge Kitchen Reconstruction 3. Moran Camp Construction 4. Moro – Ridge Road extension Works (15Km Road) 5. Kutubu Access Road Upgrade and Supply & Install of 2 x Truss Bridge 3 x Universal Bridges (87Km 6. Moran Well Pad Restoration Works 7. Homo Powa Road Upgrade and extension (38Km) Key Responsibilities • Coordinating and organizing site-field based engineering team • Interface with contractor’s project, contractor’s construction personnel’s and company operation personnel to develop construction work plan. • Prepare work breakdown structure for each project as per execution plan • Work pack planning and consistent schedule representation across all projects. • Set and maintain the quality of the work pack, formats, contents and how they are used. • liaise with Clough design engineers on technical queries and develop corrective solution to the design • Management & training subordinates on all engineering issues • Manage & coordinate the subcontractors & consultants to the projects • Integration of materials (workpack MTO’s) • Preparation of field operation, WMS, JHA, and establish safety culture in the project • Measure monitor and reports on construction productivity/project budgets so this is efficiently managed Show less

    • Project Manager
      • Feb 2016 - Oct 2017

      Manage Ausaid and health projects in our operation in the Highlands of Papua New Guinea

    • Project Engineer
      • Sep 2015 - Feb 2016

      Ausaid Projects in Lae; Hagen; Wabag

    • Australia
    • Construction
    • 700 & Above Employee
    • Site Engineer
      • Aug 2013 - Sep 2015

      Exxon Highlands Perminent Facility Compound Buildings. Undertake Pre-pour inspection with Client structural engineer & sign off by independent structural engineer Set out levels from TBM/reduced from PBM using either Dumpy Level/Laser Work closely with Formen to programe work for the daily during prestart and prioritise works accordingly Engineering Quality Test: Organise and carry out DCP/Field Density Test on building pads Record and Analyse Soil Penetration Test(SPT) with water Bore Drilling Crew Supervise Dynamic Compaction/Rapid Impact Compaction on uncontroll fill done by rig. Weekly Safety Inspection Under Take Task Observation as scheduale Attend prestart meetings and organise the crews on site Create construction Lots on Incite Write Safe Work Method Statement & Creat work permit Update & Maintain equipment & Calibration Registers for all measuring equipment Compile RFI's issuing to Engineering & Construction Manager Update 2 weeks concrete Pour Scheduale Update 2 week reo delivery docket Order materials & do programming Show less

    • Spain
    • Legal Services
    • 1 - 100 Employee
    • Project Development Assistance Engineer
      • Mar 2013 - Aug 2013

      Engineering projects including; Road works & Sealing. Drainages & head walls Design Storm water pitching Bulk & Detail Earthworks Project bidding including Quality Control, Environmental Plan, Construction Management Plan Project Claim & Cost Control Estimation & Project scheduling Engineering projects including; Road works & Sealing. Drainages & head walls Design Storm water pitching Bulk & Detail Earthworks Project bidding including Quality Control, Environmental Plan, Construction Management Plan Project Claim & Cost Control Estimation & Project scheduling

    • Australia
    • Mining
    • 700 & Above Employee
    • QA/QC Engineer
      • Feb 2012 - Mar 2013

      •Scheduling and programming Analyze cost variation, project claims Material take off and cost estimates, design, review contract documents and contract administration Provide direct site engineering supervision on civil works – site establishment, site levelling and earthworks for concrete works. Lead excavation crew and carry out detail excavations for footings, retaining walls and raft slabs, Register IFC Drawings and issue to relevant supervisors; • Under take quality surveillance; • Organise and undertake joint inspections, and sign off on FICs and ITPs for each work activities as required by QA Plan; • Delegate and supervise Field Data Records. • Delegate and supervise Document Registry. • Attend weekly meetings and amend what is discussed on meeting minutes • Supervise & schedule projects • Conduct Supervisors meeting every afternoon. • Cost Estimation Coordinate with project surveyors and focus on priority area, Actively engaged during construction of concrete footings, walls and suspended and raft slabs Show less

    • Graduate Estimator & Site Engineer
      • Oct 2011 - Feb 2012

      • Supervision of site works • Cost Estimation • Programming of the works • Writing safe working method statement & risk assessment • Cost tracking and forecasting • Quality Control and record Keeping • Report Writing • Supervision of site works • Cost Estimation • Programming of the works • Writing safe working method statement & risk assessment • Cost tracking and forecasting • Quality Control and record Keeping • Report Writing

    • Executive Offices
    • 1 - 100 Employee
    • Trainee Civil Engineer
      • Oct 2009 - Feb 2010

      • Site Supervision of works (Bulk Earthworks, drainage, structures, pavements, safety, traffic & Line marking and landscaping • Ensuring for safety and quality standards on site • Laboratory Tests • Contract management • Engineering surveying • Pavement works • Bituminous surfacing • Design for culverts & line drainages works • Site Supervision of works (Bulk Earthworks, drainage, structures, pavements, safety, traffic & Line marking and landscaping • Ensuring for safety and quality standards on site • Laboratory Tests • Contract management • Engineering surveying • Pavement works • Bituminous surfacing • Design for culverts & line drainages works

Education

  • Papua New Guinea University of Technology
    Bachelor of Engineering - BE, Civil Engineering
    2008 - 2011
  • Griffith University
    Certificate in Climate Changes, Climate Change and Water Short Course
    2022 - 2022

Community

You need to have a working account to view this content. Click here to join now