Stacy Benson CEng MICE

Director For Rail at Michael J Lonsdale
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
UK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Kingdom
    • Construction
    • 100 - 200 Employee
    • Director For Rail
      • Mar 2022 - Present

    • France
    • IT Services and IT Consulting
    • 700 & Above Employee
    • Portfolio Manager
      • Nov 2019 - Mar 2022

      Connect Contract Head of Delivery and Portfolio Manager

    • Senior Project Manager
      • Oct 2017 - Nov 2019

      Initially seconded into Thales by the client and employed as management consultant in areas of underperformance to change processes and reinvigorate staff, transforming departments into high functioning delivery teams. Established an in-house survey and design team from inception. Personally recruited, trained and implemented an accountable management hierarchy consisting of over 70 reports. Head of delivery for all asset survey and design information required for installation to time, cost & quality. Achieving “right first time” installation of installs, reducing re-work to less than 5%. Granted delegated self-assurance authority from client. (Budget £10m+)Responsible for delivery of sighted asset and foundation installation activities across the project. (Budget £10m+)Create reports and analysis of cost and delivery metrics for presentation to executive team. Responsible for implementing efficiencies and initiatives to improve quality, reduce cost and programme duration, through the implementation of; new ways of working and utilising new and emerging technologies. Reporting into the executive team on cost savings and monitoring of improvements.

    • Lead Construction Manager
      • May 2017 - Oct 2017

      Responsible for forming a client construction team of Construction Managers and Field Engineers (25+ reports) and management of enabling works delivery. Successfully planned, managed and delivered multiple large-scale installation closures consisting of crucial programme activities in short timescales throughout Circle Line Central Corridor. Responsible for implementation and approved use of Road Rail Vehicles (RRVs) to facilitate working at height in tunnel sections, successfully delivering the first mechanically assisted installation on 4LM. Day to day management of contractor’s construction quality, safety and compliance to CDM Regulations.Seconded by the contractor to form and nurture a sub-system installation organisation of 6+ teams delivering the first in type installations of the Data Communications System (WIFI Signaling) in initial migration areas. Introducing supervisory management and site supervision. Discovered and implemented multiple design and installation efficiencies to accelerate the programme and recover delay.

    • Project Manager
      • Jun 2016 - May 2017

      Project authority for management of principle contractor’s delivery strategy of two key migration areas within the Circle Line central corridor (Value £20m+).Responsible for the coordination of the ‘client delivered enabling works’ necessary to facilitate the contractor’s design and delivery. Provided a collaborative working approach and a fair and consistent interface across the delivery team in a multi-disciplined and multi-stakeholder environment. Administration of the contract, raising early warning notices, organising and chairing risk reduction meetings and issuing project management instructions and communications to the subcontractor.Created and successfully agreed large value business cases (£1m+) for important scope changes necessary for the benefit of the project and the operational railway as a whole

    • Construction Manager
      • May 2014 - Jun 2016

      Responsible for forming and running a delivery team of 8+ track gangs managed by multiple Field Engineers to delivery track renewals and upgrade works on the Northern Line (£2m). Established and maintained an exemplary safety record, promoting continuous improvement and achieving the London Underground recognised Beacon Status for health and safety leadership. Successfully delivered all track works on budget and to time, achieving the speed and number of trains per hour increase on the Northern Line. Created cost estimates, tendered for works and procured contractor services, plant and materials on a regular basis.

    • United States
    • Renewables & Environment
    • 300 - 400 Employee
    • Temporary Works Engineering Manager (Civil/Structural Engineer)
      • May 2011 - May 2014

      Occupied critical assurance engineer role checking and maintaining temporary works and crane approval safety assurance across the Jubilee, Northern and Piccadilly Lines for all construction activities. No safety critical incidents encountered throughout the tenure. Single point of contact and sole interface for all third-party works affecting London Underground infrastructure including high profile projects such as The Shard, Olympic Park Stratford and London Bridge upgrade works. Drafted and obtained stakeholder approval for new company policies, standards and process which I rolled out to ensure compliant implementation of temporary works management across the business. These are still utilized company-wide today.

    • United Kingdom
    • Truck Transportation
    • 300 - 400 Employee
    • Graduate Civil Engineer
      • Sep 2008 - May 2011

      Project Manager: Piccadilly Line Scrap Removal (Nov ’10 - May ’11) £0.5m budget to remove scrap rail from the Piccadilly Line. Activities included sourcing, procuring and managing sub-contractor labour suppliers. Working with complex logistical railway access availability, including planning and booking of engineering trains/cranes and road rail vehicles. Achieved full budget recovery through rail/steel recycling to outside suppliers. Contract Manager: Mechanical & Electrical Asset Maintenance ‘E&M’ (Aug ‘10 – Oct ’10) Accountable management of Tube Lines’ primary E&M contractor and their deliverables. Initiated and drove improvements with the contractor to establish efficient and cost effective asset management practices. Reviewed and improved asset maintenance lifecycles, whole life costing and developed strategies for improved management of assets. Lead Design Engineer: Piccadilly Line Control Centre (Jun ‘09 – July’10) Acting Lead Design Engineer / Project Manager at inception of project concept phase. Delivery of all survey and feasibility aspects including geotechnical, topographical and UXO surveys etc. Detailed reinforced concrete and structural steelwork design to blast loading conditions including dynamic design of elements. Junior Civil & Structural Engineer: Green Park Step Free Access Upgrade (Mar ‘09 – Jun ’09) Structural design of temporary works including hoarding and staircases for step free access works. Temporary works site inspector appointed during the construction stage. Junior Civil & Structural Engineer: Lifts, Escalators & Assessments (Sep ‘08 – Mar ’09) Inspection, structural analysis and condition assessment of escalator trusses, tunnels, bridges and earth retaining structures.

Education

  • University of Greenwich
    Civil Engineering, Civil and Structural Engineering
    2012 - 2014
  • Coventry University
    2:1, Civil Engineering and Construction
    2005 - 2008
  • Nicholas Breakspear RC School
    A/AS Level, Maths, Physics, History, English
    1998 - 2005

Community

You need to have a working account to view this content. Click here to join now