Ssenkambi Andrew
Computer Aided Design Technician at ICS Engineering and Environment- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
0
/5.0 / Based on 0 ratingsFilter reviews by:
Experience
-
ICS Engineering and Environment
-
Uganda
-
Civil Engineering
-
1 - 100 Employee
-
Computer Aided Design Technician
-
Apr 2019 - Present
Kampala, Central Region, Uganda
-
-
-
China Railway Construction Co., Ltd.
-
United States
-
Civil Engineering
-
700 & Above Employee
-
Computer Aided Design Design Engineer
-
Aug 2016 - Apr 2019
Mayuge, Eastern Region, Uganda As a senior CAD Operator responsible, responsible for producing shop drawings for road, intake structures and utilities designs. Detailed design of major junctions, including, roundabouts and major at grade intersections. Engaging in technical discussions and meetings with the Engineers' team to ensure Compliance and Quality management of the works.
-
-
-
-
Computer Aided Design Design Engineer
-
Jan 2014 - Mar 2016
Mbarara, Western Region, Uganda As a CAD engineer tasked with preparation contractor shop drawings, quantities for works including mainly concrete, steel, formwork, earthworks, and others, as per design and as built respectively. Co-ordination of technical office and field construction sites in terms of delivering Site instructions, supervision and inspection of works on behalf of the contractor.
-
-
-
Ministry of water and environment
-
Government Administration
-
200 - 300 Employee
-
Site Supervisor
-
Feb 2014 - Dec 2014
Isingiro, Western Region, Uganda • Conducting community stakeholder meetings to sensitize them about the works. • Conducting site reconnaissance to determine suitable routes for the pipeline network. • Preparation and implementation of timely program of works. • Procurement of construction materials and tools required for the works. • Daily monitoring and management of works including, excavations, pipe laying, elevated water tank installation. • Preparation of timely progress reports. • Preparation of… Show more • Conducting community stakeholder meetings to sensitize them about the works. • Conducting site reconnaissance to determine suitable routes for the pipeline network. • Preparation and implementation of timely program of works. • Procurement of construction materials and tools required for the works. • Daily monitoring and management of works including, excavations, pipe laying, elevated water tank installation. • Preparation of timely progress reports. • Preparation of payment schedules for workers based on production. • Carrying out community sensitization concerning HIV/AIDS. • Conducting daily safety toolbox meetings with the workers. • Conducting community stakeholder meetings to sensitize them about the works. Show less
-
-
-
Spencon
-
Kenya
-
Construction
-
1 - 100 Employee
-
Ass. Surveyor
-
Sep 2012 - Dec 2013
Adjumani, Northern Region, Uganda Responsible for processing setting out data for road works and the structures. Setting out of road works and structures’ extents using a Total Station, monitoring and supervising works as per design specifications. Preparing shop drawings using AutoCAD. Periodic joint measurements of items required in the preparation of interim payment certificates. Preparing and producing survey reports with the aid of Microsoft office word and excel.
-
-
Education
-
Ndejje University
Bachelor of Engineering - BE, Civil Engineering -
Uganda Military College Lugazi
Higher Diploma, Civil Engineering -
Uganda technical college Kichwamba
Ordinary Diploma, Civil Engineering