Sreeraj Rajeev, AMIMechE

Project Engineer at CCm Technologies
  • Claim this Profile
Contact Information
Location
Gloucester, England, United Kingdom, UK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • APM Associate
    Association for Project Management
    Feb, 2023
    - Oct, 2024
  • Level 2 Award in Leadership and Team Skills
    The City and Guilds of London Institute
    Oct, 2022
    - Oct, 2024
  • Certificate of completion - Agile Project Management & Delivery
    Udemy
    Mar, 2021
    - Oct, 2024
  • Learning PRINCE2
    LinkedIn
    Jun, 2020
    - Oct, 2024
  • Project Management Simplified
    LinkedIn
    Jun, 2020
    - Oct, 2024

Experience

    • United Kingdom
    • Agricultural Chemical Manufacturing
    • 1 - 100 Employee
    • Project Engineer
      • May 2021 - Present
    • Project Engineer
      • Sep 2014 - May 2021

      Currently working as a Project Engineer for below projects : 1. FPSO- HC Recovery Gas package for TECHNIP FMC 2.ICA FLUOR (PEMEX ) - BLOWER PACKAGE Currently working as a Project Engineer for below projects : 1. FPSO- HC Recovery Gas package for TECHNIP FMC 2.ICA FLUOR (PEMEX ) - BLOWER PACKAGE

    • Project Engineer - Mechanical
      • Oct 2012 - Aug 2014

      FIELD / CONSTRUCTION SITE EXPERIENCE Clients : ORPIC Refinery, Oman Methanol Company, Vale Oman Pelletizing Company etc. RESPONSIBILITIES  Preparation of Site fabrication and installation schedule in MS Project.  Coordination with Client and sub vendors and ensure the works are carried out as per client specification and standards.  Preparation and submission of Project Documents like Method statements, Project Control Procedures, Fabrication procedures, Erection procedures, MAS, TRA, Quality documents etc to client for their approval.  Worked as Erection & commissioning engineer.  Attending the inspection along with HSE officers to ensure the Company and Clients HSE Policies are implemented during execution of work at site.  Worked as piping project engineer (reading isometric drawings, P&ID, protocol preparation )  Checking the Pipe Fabrication works as per Shop fabrication drawings / isometric drawings.  Perform inspection of incoming material as per project requirement.  Carry out of inspection of structural fabrication work according codes and standards.  Material Planning & scheduling.  Planning and executing of the work so as to achieve the Target as planned.  Allotting works to efficient contractors.  Preparing the protocols for completion of fabrication work.  Performed pre-commissioning and commissioning activity and prepare the final handover documents.  Prepare reports for day to day results and present them in weekly review meetings of both the Company and client. Show less

    • India
    • Industrial Machinery Manufacturing
    • Project Engineer
      • Jul 2009 - Sep 2012

      As a Project Engineer in an EPC Project at Kuwait for the construction of Bulk Handling facilities for the production chemicals in SEK, WK and NK fields for KOC. Job Responsibilities Preparation and Estimation of 11 Chemical Tanks (7 SS +4CS) – Shell, Bottom Plate, Conical Roof Plates, Requirement of Tank nozzles and matching Weld Neck Flanges ,Preparation of requirement of Weld Consumables, Welding machines, Weld oven, Paint Requirements for CS Chemical Tanks. Engineering Drawings Co-ordination For Tanks, Drain Vessels , Skids ,Associated Piping, Solutions to our Client KOC for Review and Approval. Daily Co layouts ,P&IDS , Control Cabin, Security Cabins, Shelters, for Tanks and Skids ,Platforms ,Ladders for Tanks, Associate Piping Drawings from our Design Engineering Sub-Contractor Aker and co-ordination with SUB-CONTRACTORS to Complete the Construction Operations as per Scheduled time. Preparation of Construction Procedures/Quality Procedures for KOC Review and Approval. Preparation of Daily, weekly Plan for Construction Operations and Client KOC Approval. Execution and Co-ordination from KOC Approved Subcontractors. Review of all Engineering Documents, Quality Procedures from Approved Sub-Contractor. Execution in Construction of Chemical Storage Tanks (11Nos) both S.S and C.S Tanks ( De-emulsifier Tanks ,Scale Inhibitor /Corrosion Inhibitor Tanks ,Oxygen Scavenger Tanks and Fire Water Tanks) and associated Piping ,Hydro-Test for Tanks and Piping and Commissioning for Primary Facility at Burgan Area. Responsible for Project Planning using MS Project & Scheduling to meet the completion target. Expediting and Co-ordination with suppliers, clients and contractor. Preparation of comparative statement for the bids received, conducting negotiations with vendors and sorting out commercial issues before placement of orders. Coordination with vendors for submission of drawings & approval of the same from the respective clients. Show less

Education

  • Caarmel Engineering College
    Bachelor's Degree, Mechanical Engineering
    2005 - 2009
  • Mahathma Gandhi University, Kerala
    Bachelor of Technology (B.Tech), Mechanical Engineering
    2005 - 2009

Community

You need to have a working account to view this content. Click here to join now