SREENATH KRISHNAKUMAR

Mechanical Manager at ARANER
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Abu Dhabi Emirate, United Arab Emirates, AE
Languages
  • English -
  • Hindi -
  • Malayalam -
  • Tamil-speaking only -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

K.K. ANILKUMAR Kammala

Sreenath is very detailed and result oriented person.

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • CSWIP 3.1
    TWI
    Dec, 2013
    - Nov, 2024

Experience

    • United Arab Emirates
    • Oil and Gas
    • 1 - 100 Employee
    • Mechanical Manager
      • Mar 2023 - Present

      Managing and Leading the construction activities of the Avenues mall project, Riyadh, KSA

    • Mechanical Engineer
      • Apr 2019 - Feb 2023

      Managing and Leading the construction activities of the District Cooling Plant Project DCP4 for EDC/ Tabreer and the Danat DCP for PAL cooling from project conception, testing and completion until the handover of the project.-Lead for the Installation of the tallest heavy water storage tank in UAE.(42m Height X 38.5 M Dia for Dubai) and (21 m Height X33.3 m Dia for Danat Auh.)-Lead for the installation of several static and rotary equipment such as Chillers(3500TR), Cooling towers.-Mechanical network piping above ground and underground, Pumps, etc.-Lead role in the testing, flushing activities of the Cooling Plant piping works.-lead role in the Testing and commissioning stage of the District Cooling Plant. Show less

    • Mechanical Engineer
      • May 2018 - Apr 2019

      -Managing and leading the Installation of the Chilled water piping network for the District cooling plant in Marassi Al Bahrain

    • United Arab Emirates
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Project Control Coordinator
      • Feb 2018 - May 2018

      Coordinated and lead the fabrication activities of M/s Technip at their fabrication subcontractor facility for 32 pressure vessels and 2 crude oil storage tanks for Jabal Ali Refinery Expansion Project-ENOC Coordinated and lead the fabrication activities of M/s Technip at their fabrication subcontractor facility for 32 pressure vessels and 2 crude oil storage tanks for Jabal Ali Refinery Expansion Project-ENOC

  • Mefab Engineering Industry LLC
    • Dubai, United Arab Emirates
    • Project Engineer
      • Mar 2017 - Feb 2018

      Managed Piping and equipment skid projects of Basrah Gas Corporation (BGC, Iraq) from conception, pre-production towards completion, and handing over to the Main Client M/s WASCO. -Managing project budgets to keep costs in control. -Leading Progress review meetings with Client and Main Contractor. -Leading the engineering and construction team. -Leading the team in preparing the Works packages as per technical drawings, Project specifications, and client Priorities for delivery. -Conducting regular in-house meetings. -Planning and scheduling of various project milestones. -Assigning manpower and resources for projects. -Monitoring and controlling the Project. -Managing site staff and workers while complying with HSE procedures. -Coordinating with all the stakeholders of the project.. -Planning and supervision of project loading activities. -Implementing latest safety practices in the workplace to avoid any LTI and to ensuring the projection successful handing over. Show less

    • Production Manager
      • Jan 2016 - Feb 2017

      Lead role in PETROFAC Project of CICPA DATA BUILDINGS -ZADCO PROJECTCLIENT:-PETROFAC / ZADCOSCOPE: DESIGN & DETAILED ENGINEERING, MATERIAL PROCUREMENT, FABRICATION, TESTING, ASSEMBLY, PAINTING, INSULATION, ELECTRICAL & ENI.

    • Production Manager
      • Nov 2015 - Jan 2016

      Lead role for fabrication of cooling plant modules for Rehabilitation of Central AC System Project King FAHD Hospital, Jizan, KSACLIENT: Stellar energySCOPE: DETAILED ENGINEERING, MATERIAL PROCUREMENT, FABRICATION, TESTING, ASSEMBLY, PAINTING, INSULATION, ELECTRICAL & FAT.

    • Assistant Production Manager
      • Aug 2015 - Nov 2015

      Lead role in the fabrication activities of THREE PHASE SEPERATOR PACKAGECLIENT :-Chartered Engineering & Outsourcing / Pakistan Petroleum LimitedSCOPE: DESIGN & DETAILED ENGINEERING, MATERIAL PROCUREMENT, FABRICATION, TESTING, ASSEMBLY, PAINTININSULATION, ELECTRICAL & FAT.

    • Asst.Production Manager
      • Apr 2015 - Aug 2015

      Lead role in the fabrication, testing, and delivery of Jacketed piping for ADGAS train I(52 piping spools with 100% RT and testing of Core and jacketed pipes in just 30days) & train II shut down Project.-Total 150 SPOOLS OF JACKETED PIPING FOR TRAIN-1 & TRAIN-2, ADGAS DAS ISLAND, UAEMain Contractor: QconClient:- ADGAS, Abudhabi

    • Construction Superintendent
      • Dec 2013 - Apr 2015

      Managed and Played a lead role in coordinating the installation activities for Zubair Oil Field Development EPC project of Basrah Iraq for M/s Weatherford Oil& Tools (ME), including Piping, Pipe rack modules, Pressure Vessels, etc. at the newly constructed Initial Production Facilities(IPF) at Hammer as M/s ENI and Basrah Gas Corporation (BGC, Iraq) the End User.-Supervising the Erection/Installation of pipe racks for Tank farm area,Produced water piping,Power generation areas,Gas compression areas,Flare areas,and other main racks, piping connections to the tanks,installation of Valves, Erection of other pipe spools etc..-Preparing the Works packages as per technical drawings, Project specifications and site priorities.-Conducting and coordinating with HSE for daily tool box meetings at site.-Assigning manpower and resources according to the Daily works packages for the areas.-Managing site staff and workers while complying with HSE procedures.-Coordinating with all the stakeholders for the Inspections and for preparation of the works packs.-Implementing latest safety practices in the workplace to avoid any LTI and to ensuring the projection successful handing over. Show less

    • Project Engineer
      • Jul 2013 - Dec 2013

      Managed and Played a lead role in coordinating the fabrication activities for Zubair Oil Field Development EPC project of Basrah Iraq for M/s Weatherford Oil& Tools (ME), including Piping, Pipe rack modules, Pressure Vessels, etc. for their newly constructed Initial Production Facilities(IPF) at Hammer, Zubair, and Rafidiya as M/s ENI and Basrah Gas Corporation (BGC, Iraq) the End User.from conception, pre-production towards completion, and handing over to the Main Client.-Managing project budgets to keep costs in control.-Leading Progress review meetings with Client and Main Contractor.-Leading the engineering and construction team.-Leading the team in preparing the Works packages as per technical drawings, Project specifications, and client Priorities for delivery.-Conducting regular in-house meetings.-Planning and scheduling of various project milestones.-Assigning manpower and resources for projects.-Monitoring and controlling the Project.-Managing site staff and workers while complying with HSE procedures.-Coordinating with all the stakeholders for the Inspections and for preparation of the works packs.-Planning and supervision of project loading activities.-Implementing latest safety practices in the workplace to avoid any LTI and to ensuring the projection successful handing over. Show less

    • Lead Engineer
      • Sep 2011 - Apr 2013

      Leads 1) Structure,Piping, Fabrication and erection works. 2) Mechanical,Static and rotary equipment Installation. 3) Revamping works for Equipments including Civil Foundation Modification Leads 1) Structure,Piping, Fabrication and erection works. 2) Mechanical,Static and rotary equipment Installation. 3) Revamping works for Equipments including Civil Foundation Modification

    • India
    • Construction
    • 200 - 300 Employee
    • Lead Engineer
      • Nov 2010 - Sep 2011

      Leads the Structural and Equipment fabrication and erection works. Leads the Structural and Equipment fabrication and erection works.

    • Project Engineer
      • Oct 2009 - Nov 2010

      Estimation,Project Controls,Analyzing Production.. Estimation,Project Controls,Analyzing Production..

    • Mechanical Engineer
      • Jun 2007 - Oct 2009

      Leads all the construction activities of site. Leads all the construction activities of site.

Education

  • University of Calicut
    Bachelor of Technology (BTech), Mechanical Engineering
    2003 - 2007
  • NSS HSS PARAKKADAVU
    INTER SCHOOL EDUCATION, BiomathS
    2001 - 2003

Community

You need to have a working account to view this content. Click here to join now