Sreejith V K, P.E., PMP
Deputy Operations Director at Al Habshi Engineering Consultants Office- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Credentials
-
Project management Professional
Project Management InstituteJun, 2015- Nov, 2024 -
Chartered Engineer
The Institution of Engineers (India)Jan, 2011- Nov, 2024 -
Professional Engineer
Engineers Chartering CouncilAug, 2008- Nov, 2024 -
EMS Lead Auditor
-Jul, 2006- Nov, 2024 -
QMS Lead Auditor
IRCADec, 2003- Nov, 2024
Experience
-
Al Habshi Engineering Consultants Office
-
Kuwait
-
Architecture and Planning
-
1 - 100 Employee
-
Deputy Operations Director
-
Jun 2023 - Present
-
-
Senior Project Manager
-
Jun 2016 - Jun 2023
-
-
-
-
Facilities Design Engineer
-
Jun 2010 - Jun 2016
• CPMS (Exclusive Chevron Project Management System) Team member for projects developed through Chevron Project development & Execution Process (CPDEP) at different stages to support project management teams in Finalizing project Framing documents, Finalizing conceptual design, Exploring different alternatives, Finalizing the final alternative, FEED, project design, tendering and execution.• Coordinate Pre-FEED scope of work, technical specifications, bill of quantities, and review FEED and EPC documents for projects. • Coordinate discipline engineers to conduct constructability, Operability and Maintainability reviews.• Support Asset &Integrity technical team to prepare, evaluate and validate ITPM for integrity critical structures.• Co-ordination of technical scope management across disciplines and stakeholders within a multinational environment.• Coaching Agreement signed with SAC Civil Engineers and providing support to enhance their proficiency.• Attended lessons learned sessions and uploaded lessons learned during design and execution with most suitable technical recommendations• Participated in OE Audit for MOC process and provided positive improvement feedback• Support Engineering applications and provide solutions to engineering challenges based benchmarking engineering practices and best available technologies used by oil & gas industry.• Participate and provide feedback and technical comments on scheduled reviews of Chevron technical standards and specifications such as CES (Chevron Engineering Standards)• Provide input to technical requirements that enable stakeholder divisions to operate and maintain facilities efficiently and cost effectively.• Perform pre-screening engineering desk reviews of potential suppliers in support of Materials Supply and Strategic Sourcing• Provide support to SAC project teams of specialized engineering nature in the design reviews (30%, 60%, 90% &100%) Show less
-
-
Project Engineer
-
Jun 2008 - Jun 2010
• Actively participated in IHAZID review meetings and risk assessment for all ongoing projects.. • Phase 4 Project responsibilities include supporting the Project and the Construction Team and are accountable for review all technical transmittals for running construction contracts, as-built drawings, procedures, design, reports, materials review and technical approvals.• Phase 3 Project responsibilities include reviewing of FEED documents, Detailed Engineering documents prepared by Consultants and development of In-house FEED for various projects. Responsibilities also include providing support to the Project Manager until the Phase gate process.• Phase 2 & Phase 1 Project responsibilities include giving support to the PM in developing Basic Concepts and technical evaluation of different alternates.• ESRs – investigations, proponent meetings/agreement to define scope, design, specification generation, drafting drawings, issuing SOW for external design if any, checking external design at all phases, planning and reporting in presentation.• Facility Condition Assessment – Conduct detailed facility condition assessment for training center and prepared reports to substantiate refurbishment or replacement decisions• Stakeholder engagement – Ensure most suitable mode of involvement/ communication with the stakeholders and ensuring the stakeholder is engaged throughout the project phases.• Provide technical support P&ED to achieve gold standard requirements.• Participated in the team building session conducted at P&E Department.• Provided technical feedback with pros and cons on utilizing design package completed for KGOC at Ahmadi to be used as offices building at Wafra.• Actively participated in FEL (Front End Loading) review of projects.• Adherence to Facilities design& construction (FD&C) process to finalize designs through the stipulated flow chart mechanism. Show less
-
-
-
Chevron
-
United States
-
Oil and Gas
-
700 & Above Employee
-
Facility Engineer
-
Jun 2008 - Jun 2016
-
-
Education
-
University of Calicut
B Tech, B Tech in Civil Engineeting